|
---|
Category:Emergency Preparedness-Review of Emergency Plan Changes
MONTHYEARML16263A0722016-09-15015 September 2016 University of Missouri - Columbia Research Reactor, Regarding Changes to the Emergency Plan Without Prior Commission Approval 2016-09-15
[Table view] Category:Letter
MONTHYEAR05000186/LER-2024-003, University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.212024-10-25025 October 2024 University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.21 ML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 05000186/LER-2023-003, University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b2023-06-0606 June 2023 University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 The Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 The Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia 05000186/LER-2021-004, University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.102021-11-23023 November 2021 University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.10 ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel 2024-08-27
[Table view] |
Text
~ University of Missouri Research Reactor Center 1513 Research Park Drive Columbia, MO 65211 PHONE 5l3-8S2-4211 WEB murr.missouri.edu September 15, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington, DC 20555-0001
REFERENCE:
Docket 50-186 University of Missouri-Columbia Research Reactor Amended Facility License R-103
SUBJECT:
Written communication specified in 10 CFR 50.4(b)(5) regarding changes to the University of Missouri Research Reactor Emergency Plan without prior Commission approval pursuant to 10 CFR 50.54(q)
Attached are the September 15, 2016, changes to the University of Missouri Research Reactor (MURR)
Emergency Plan and the justification for each change. Additionally, the revised pages to the Emergency Plan are included to help explain the change.
Changes to the MURR Emergency Plan were performed for the following reason:
- 1. Updating the agreement between the City of Columbia and MURR, Appendix A These changes do not decrease the effectiveness of the MURR Emergency Plan and are being made without prior Commission approval pursuant to 10 CFR 50.54(q). If you have any questions regarding these changes, please contact me at MeffertB@missouri.edu or by calling (573) 882-5118.
ENDORSEMENT:
Sincerely, Reviewed and Approved
~A.~e~
Reactor Manager .
Ralph A. Butler, P .E.
Director
Enclosures:
- 1. Attachment 1 - Changes and Justifications to the University of Missouri Research Reactor Facility Emergency Plan
- 2. Attachment 2-Revised Pages to the University of Missouri Research Reactor Facility Emergency Plan xc w/enclosures: Mr. Johnny Eads, U.S. NRC Mr. Geoffrey Wertz, U.S. NRC
ATTACHMENT 1 Changes and Justifications to the
Appendix A, Page A-1 Update Agreement Letter.
Justification for the change:
This change updates the agreement between the City of Columbia and MURR, in that the City of Columbia Fire Department will respond to fires and other emergency situations should they occur at the facility.
11
ATTACHMENT 2 Revised Pages to the University of Missouri Research Reactor Facility Emergency Plan
LIST OF EFFECTIVE PAGES Page Number Date Revised Title Page I Assignment Sheet ................................................................................... 12/8/89 Table of Contents: ii ................................................................................................... Original
- List of Effective Page: iii ........................................................................................... 9/15/16 1 ................................................................................................................... 4/13/07 2 ******************************************************************************************************************* 3/30/12 3 ................................................................................................................... 4/13/07 4 ................................................................................................................... 3/19/04 5 .......................... :........................................................................................ 2/20/87 6 ******************************************************************************************************************* 3/19/04 7 ................................................................................................................... 3/19/04 8 ******************************************************************************************************************* 4/13/07 9 ................................................................................................................... 4/13/07 10 ................................................................................................................. 4/13/07 11 ................................................... :............................................................. 3/30/12 12 ................................................................................................................. 9/18/91 13 ................................................................................................................. 3/19/04 14 ................................................................................................................. 3/19/04 15 ................................................................................................................. 3/19/04 16 ................................................ ;................................................................ 3/19/04 17 ................................................................................................................. 3/30/12 18 ................................................................................................................. 3/19/04
- -- -- - _!9_. *-*-~* "_._-_:_:_"_"_'.__"_"" :*. ::*_._._..._._.._.._. ~~~ . ._.._, ... , _._._,_,_._,._._............................................................ 3/19/04 20 ................................................................................................................. 3/30/12 21 ................................................................................................................. 12/28/93 22 ................................................................................................................. 3/19/04 23 ***************************************************************************************************************** 3/19/04 24 ................................................................................................................. 3/30/12 25 ................................................................................................................. 4/13/07 26 ................................................................................................................. 3/30/12 27 ................................................................................................................. 4/13/07 Appendix A (title page) ............................................................................................. Original*
A-1 ............................................................................................................................. 9/15/16 Appendix B (title page) .............................................................................................. Original
- B-1 .............................................................................................................................. 3/19/04 B-2 .............................................................................................................................. 3/19/04
- Original page as written in the August 12, 1982, submittal to the NRC; these pages have no revision dates on them.
iii Rev. 9/15/16 I
A-1 CITY OF COLUMBIA, MISSOURI OFFICE OF CITY MANAGER September 7, 2016 Bruce A. Meffert, Reactor Manager University of Missouri - Columbia 1513 Research Park Drive Columbia, MO 65211-3400
Dear Mr. Meffert,
This letter is to provide assurance that the City of Columbia Fire Department will respond to fires or other emergency situations should they occur at the research reactor. We understand that the research reactor staff will continue to conduct training sessions at least every two years for Fire Department personnel, including MURR facility orientation and review of selected health physics procedures specific to the MURR facility. The responsibility for maintaining and scheduling training for our Fire Department, which will participate in such training, will remain with the MURR staff.
Mike Matthes City Manager Cc: Randy White, Fire Chief 701 E. BROADWAY* P.O. Box 6015 ° CoLuMmA, M1ssouR1 65205-6015 (573) 874-7214 ° FAX (573) 442-8828 *TTY (800) 735-2966 vvww. GoCoLUMBIAMo. COM Rev. 9/15/16 I