LR-N16-0159, Response to Request for Additional Information Regarding Chilled Water System Modifications

From kanterella
(Redirected from ML16243A227)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Chilled Water System Modifications
ML16243A227
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/30/2016
From: Carr E
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF6724, CAC MF6725, LAR S14-04, LR-N16-0159
Download: ML16243A227 (5)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 AUG 30* 2016 10 CFR 50.90 LR-N16-0159 LAR S14-04 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Subject:

Response to Request for Additional Information Regarding Chilled Water System Modifications (CAC Nos. MF6724 and MF6725)

References 1. PSEG letter to NRC, "License Amendment Request Modifying Chilled Water System Requirements," dated September 11, 2015 (ADAMS Accession No. ML15254A387)

2. PSEG letter to NRC, "Response to Request for Additional Information Regarding Chilled Water System Modifications (CAC Nos. MF6724 and MF6725)," dated August 12, 2016 (ADAMS Accession No. ML16225A436)

In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The proposed amendment would revise Technical Specification (TS) 3/4.7.1 0, "Chilled Water System- Auxiliary Building Subsystem," to allow (1) a reduction in the number of required components (two vs. three required chillers) and (2) use of the cross-tie capability between Unit 1 and Unit 2. A supporting change would also be made to the Control Room Emergency Air Conditioning System TS

3. 7.6.1 (Unit 1) and TS 3. 7.6 (Unit 2).

In the Reference 2 letter, PSEG prmd_dBd_cu_es_ponse tCLthe..J~JHG_s_taff_:s__r_aques_lf_oLadditional _ _ _ _ _ __

information (RAI) which included a revision to the Salem Unit 1 and 2 TS mark ups provided in the Reference 1 letter. PSEG is issuing this letter to correct two typographical errors in the TS mark ups provided in the Reference 2 letter: 1) correct the numbering of the applicability associated with the LCO 3. 7.1 Oa configuration, and 2) add a period at the end of the# footnote. provides the revised TS mark ups.

PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for

AUG 3 0 2016 LR-N16-0159 10 CFR 50.90 Page 2 concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Brian Thomas at (856) 339-2022.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on -~B~zj_']!:_'_o,L-V/___[___6_*_

  • (Date)

Respectfully, p~

G---~

Eric Carr Acting Site Vice President Salem Generating Station Attachment 1 Revised Mark-up of Proposed Technical Specification Pages cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, Project Manager, NRC NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator

LR-N 16-0159 Revised Mark-up of Proposed Technical Specification Pages The following Technical Specifications for Renewed Facility Operating License DPR-70 are affected by this change request:

Technical Specification 3/4.7.1 0, Insert A 3/4 7-33 The following Technical Specifications for Renewed Facility Operating License DPR-75 are affected by this change request:

Technical Specification 3/4.7.1 0, Insert D 3/4 7-28

LR-N16-0159 Attachment 1 Insert A a b c  !

Configuration 1. Three OPERABLE 1. Two OPERABLE chillers and, 1. Three OPERABLE chillers chillers and, and,

2. Two OPERABLE chilled water i
2. Two OPERABLE pumps 2. Two OPERABLE chilled water  !

chilled water pumps pumps from either Unit 1 or Unit 2 (Units Cross-tiedyi21  !

i APPLICABILITY 1. ALL MODES and 1. From November 1 through 1. From November 1 through during movement April 30 in ALL MODES and April 30 in ALL MODES and of irradiated fuel during movement of irradiated during movement of irradiated assemblies fuel assemblies# fuel assemblies##

2. The Unit 1 Emergency Control 2. The Unit 1 and Unit 2 ECACs Air Compressor (ECAC) is are isolated from the chilled isolated from the chilled water water system system 3. Non-Essential heat loads are
3. Chilled water flow to the third isolated from the chilled water chiller that is not in service is system on BOTH Units isolated(tJ 4. BOTH CREACS trains are
4. Control Room Emergency Air operable per TS 3. 7.6.1 Conditioning System (single filtration train (CREACS) alignment alignment is not permitted) i
a. BOTH CREACS trains 5. Unit chilled water cross-tie OPERABLE, no valves are OPEN additional chilled water 6. Administrative controls are in heat load removal place for the Unit providing required, OR the required components to
b. Single CREACS train notify the other Unit if a chiller OPERABLE (TS 3. 7. 6. 1 or pump becomes inoperable  !

ACTION a.) the following restrictions apply:

i. Alignment only  !

permitted to Unit 2 '

ii. Unit 2 must be in the LCO 3.7.10a configuration iii. Non-essential heat loads are isolated from tf:JfJ-Gf:Jil!ed-water-system on BOTH Units

  1. The LCO 3. 7.10b configuration may only be used for periods of 60 contiguous days. The 50-contiguous days does not apply for LCO 3.7.10b entry to support the replacement of all 6 original chillers (Units 1 and 2).
    1. The LCO 3.7.10c configuration may only be used for periods of 45 contiguous days.

LR-N16-0159 Attachment 1 Insert D a b c Configuration 1. Three OPERABLE 1. Two OPERABLE chillers and, 1. Three OPERABLE chillers chillers and, and,

2. Two OPERABLE chilled water
2. Two OPERABLE pumps 2. Two OPERABLE chilled water chilled water pumps pumps  :

from either Unit 1 or Unit 2 (Units Cross-tiedPJ  !

i APPLICABILITY 1. ALL MODES and 1. From November 1 through 1. From November 1 through during movement April 30 in ALL MODES and April 30 in ALL MODES and of irradiated fuel during movement of irradiated during movement of irradiated assemblies fuel assemblies# fuel assemblies##

2. The Unit 2 Emergency Control 2. The Unit 1 and Unit 2 ECACs Air Compressor (ECAC) is are isolated from the chilled isolated from the chilled water water system system 3. Non-Essential heat loads are
3. Chilled water flow to the third isolated from the chilled water chiller that is not in service Is system on BOTH Units isolated( 1J 4. BOTH CREACS trains are
4. Control Room Emergency Air operable per TS 3. 7.6 (single Conditioning System filtration train alignment is not  :

(CREACS) alignment permitted)

a. BOTH CREACS trains 5. Unit chilled water cross-tie 'i OPERABLE, no valves are OPEN additional chilled water 6. Administrative controls are in iI heat load removal place for the Unit providing required, OR the required components to
b. Single CREACS train notify the other Unit if a chiller OPERABLE (TS 3. 7.6 or pump becomes inoperable ACTION a.) the following i i

restrictions apply:

i. Alignment only i I

permitted to Unit 1 ii. Unit 1 must be in the LCO 3.7.10a configuration iii. Non-essential heat loads are isolated from the chilled water coy.st&m QR fJ0-~1=/. Unit-S

  1. The LCD 3. 1.1Gb configuration may only be used for periods of 60 contiguous days. The 50-contiguous days does not apply for LCD 3.7.10b entry to support the replacement of a/16 original chillers (Units 1 and 2}.
    1. The LCD 3. 7.10c configuration may only be used for periods of 45 contiguous days.