MONTHYEARML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21014A5112021-01-12012 January 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-545 Revision 3 ML20352A2752020-12-17017 December 2020 Request for Additional Information Regarding FitzPatrick Primary Containment Isolation Valve Amendment Request ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20294A0372020-10-19019 October 2020 Request for Additional Information Primary Containment Isolation Valve License Amendment Request ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment ML20056E7992020-02-25025 February 2020 Request for Additional Information for LAR on Primary Containment Hydrodynamic Loads ML20035D5762020-02-0303 February 2020 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequence ML20027A0672020-01-24024 January 2020 Accepted for Review - Fitzpatrick License Amendment Request to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20027A0112020-01-23023 January 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19353A9452019-12-19019 December 2019 Request for Additional Information: License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML19319C3582019-11-15015 November 2019 NRR E-mail Capture - Accepted for Review - FitzPatrick License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation ML19322A0062019-11-15015 November 2019 NRR E-mail Capture - Fermi 2: Request for Additional Information- Relief Request VRR-006, Proposed Alternative for Preservice Testing of Butterfly Valves ML19316A0162019-11-0404 November 2019 NRR E-mail Capture - Revised Staff Hours Estimate - FitzPatrick License Amendment Request on Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads 2024-01-24
[Table view] |
Text
NRR-PMDAPEm Resource From: Wengert, Thomas Sent: Wednesday, August 03, 2016 4:52 PM To: Couture III, Philip; Drews, William Cc: mhawes@entergy.com; Anderson, Shaun; Anderson, Joseph; Norris, Michael; Hoffman, Raymond
Subject:
MF7347 - Supplemental Draft RAI Concerning LAR to Revise Permanently Defueled Emergency Plan for the James A FitzPatrick Nuclear Power Plant SUPPLEMENTAL DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING REQUEST FOR LICENSE AMENDMENT TO REVISE PERMANENTLY DEFUELED EMERGENCY PLAN ENTERGY NUCLEAR OPERATIONS, INC JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 RENEWED FACILITY OPERATING LICENSE NO. DPR-59 By letter dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML16043A427), as supplemented by letter dated July 6, 2016 (ADAMS Accession No. ML16188A388), Entergy Nuclear Operations, Inc. (ENOI or the licensee) submitted a request for U. S. Nuclear Regulatory Commission (NRC) approval of a license amendment request for the James A. FitzPatrick (JAF)
Nuclear Power Plant concerning proposed changes to the Emergency Plan for the permanently defueled condition. On March 16, 2016, pursuant to 10 CFR 50.82(a)(1)(i), ENOI provided a formal notification to the NRC of its intention to permanently cease power operations of JAF on January 27, 2017 (ADAMS Accession No. ML16076A391). The proposed changes would revise the on-shift staffing and Emergency Response Organization staffing levels.
On August 3, 2016, the NRC staff conducted a clarification call with ENOI to clarify the licensees July 6, 2016, RAI responses. The clarification call participants included:
Entergy Bill Drews James Jones David Daigle Pete Cullinan NRC Joe Anderson, Chief, NSIR/DPR/ORLOB Shaun Anderson, Acting Chief, NRR/DORL/LPL4-2 Tom Wengert - Fitzpatrick Project Manager, NRR/DORL/LPL4-2 As discussed in the clarification call, supplemental information is needed by the NRC staff to complete its evaluation. These RAIs are identified as draft at this time to confirm your understanding and of the information needed to complete our evaluation. If the request for information is understood, please respond to this request for additional information within 7 days of the date of this request, as discussed during the conference call.
Please call me at 301-415-4037 if you would like to set up a conference call to clarify the request for information.
1
The NRC will make this e-mail documenting the RAI clarification call and supplemental draft RAI publicly available by placing it in ADAMS via the NRC e-capture process.
- 1. Attachment 1 (Description and Evaluation of Proposed Changes) of ENOs February 4, 2016, submittal letter (page 11 of 36) under Section 3.2.1, Analysis of Proposed Changes / ERO Staffing, states:
To validate the results of the analysis, drills will be developed and conducted prior to implementation of the changes described within. The drills will be conducted to confirm the ability of the post-shutdown ERO to perform the necessary functions of each emergency response facility and will utilize the post-shutdown procedures that will be developed depicting the revised assignment of duties. The drills will be used to train and qualify post-shutdown ERO members, evaluate and validate the ability to accomplish the stated mission of each emergency response facility, and ensure that the planning standard functions are preserved with no degradation in time sensitive activities or in the ability to communicate with offsite response organizations. The drills will also validate that the post-shutdown ERO continues to address the risks to public health and safety and comply with the JAF Emergency Plan, site commitments, and applicable regulations.
To support NRC and FEMAs evaluation that proposed ERO staffing changes on the ability of the licensee to effectively implement the emergency plan, as revised, and to verify that changes pose no impact to offsite REP plans as currently approved by FEMA:
- a. Discuss whether a drill will be conducted involving a spent fuel pool event that tests the major elements of the licensees emergency plan and communications/ coordination with offsite response organizations, including the at the Joint Information Center, prior to implementation, and
- b. Discuss whether State and local response organizations will be offered the opportunity to participate, and the NRC and FEMA be provided advance notice and the opportunity to observe drill activities.
- 2. Attachment 1 of ENOs February 4, 2016, submittal letter (page 16 of 36) under Section 3.2.1.2, Analysis of Proposed Changes / ERO Staffing / Operations Support Center, states in part:
The primary events of concern in the immediate post-shut-down and defueled condition will be a fuel handling accident and a loss of SFP cooling and/or water inventory. During fuel handling activities there will be extra personnel on site that will, were a fuel handling accident to occur, be able to respond to the event. Events involving a loss of SFP cooling and/or water inventory can be addressed by implementation of SFP inventory makeup strategies required under 10 CFR 50.54(hh)(2). These strategies also continue to be required as a license condition.
The JAF analysis of proposed post-shutdown on-shift staffing only appears to address a fuel handling accident, which the licensee appears to define as mechanical damage to the spent fuel during handling or by impact with a heavy object as the only credible scenario for a gaseous release. Has an analysis been performed to verify that sufficient on-shift staffing would be available to promptly implement SFP inventory makeup strategies required under 10 CFR 50.54(hh)(2) if required without impacting the performance of designated EP functions?
2
Hearing Identifier: NRR_PMDA Email Number: 2993 Mail Envelope Properties (Thomas.Wengert@nrc.gov20160803165200)
Subject:
MF7347 - Supplemental Draft RAI Concerning LAR to Revise Permanently Defueled Emergency Plan for the James A FitzPatrick Nuclear Power Plant Sent Date: 8/3/2016 4:52:10 PM Received Date: 8/3/2016 4:52:00 PM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:
"mhawes@entergy.com" <mhawes@entergy.com>
Tracking Status: None "Anderson, Shaun" <Shaun.Anderson@nrc.gov>
Tracking Status: None "Anderson, Joseph" <Joseph.Anderson@nrc.gov>
Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov>
Tracking Status: None "Hoffman, Raymond" <Raymond.Hoffman@nrc.gov>
Tracking Status: None "Couture III, Philip" <pcoutur@entergy.com>
Tracking Status: None "Drews, William" <WDrews1@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 5502 8/3/2016 4:52:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: