February 28, 2017 Mr. Michael D. Tschiltz, Director New Plant Licensing Nuclear Generation Division Nuclear Energy Institute 1201 F Street, NW Suite 1100 Washington, DC 20004
SUBJECT:
PRELIMINARY COMMENTS ON NUCLEAR ENERGY INSTITUTE 98-03, GUIDELINES FOR UPDATING FINAL SAFETY ANALYSIS REPORTS, DRAFT REVISION 2
Dear Mr. Tschiltz:
The U.S. Nuclear Regulatory Commission (NRC) received the Nuclear Energy Institutes (NEIs)
March 24, 2015 letter, (Agencywide Documents Access Management System (ADAMS)
Accession No. ML15089A320) requesting review and comment on NEI 98-03, Guidelines for Updating Final Safety Analysis Reports, Draft Revision 2 (ADAMS Accession No. ML15089A322).
NEI 98-03, Revision 1 provides guidance for updating final safety analysis reports (FSARs) and was endorsed by NRC in Regulatory Guide (RG) 1.181, Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e). The primary focus of NEIs Draft Revision 2 is to add guidance related to FSARs as part of licensing activities under Part 52, Domestic Licensing of Production and Utilization, to Title 10 of the Code of Federal Regulations (10 CFR).
On May 10, 2016, staff of the Office of New Reactors (NRO) and the Office of Nuclear Reactor Regulation held a public meeting with NEI concerning the proposed revision (ADAMS Accession No. ML16139A107). The staff has subsequently provided preliminary review of the referenced draft revision and comments are provided in the attached three enclosures. We plan to discuss the staff comments on NEI 98-03, Draft Revision 2, at a meeting to be scheduled in the near future. We look forward to receiving stakeholder input on these comments at that meeting.
We appreciate your effort in developing this initial draft and have identified a number of recommendations, comments and questions relative to licensing activities under 10 CFR Part 52 set forth in Enclosure 1 for your consideration. The referenced document will require significant revision relative to licensing under 10 CFR Part 52 before receiving NRC endorsement. should support the development of any future NEI revision that will need to add new information and resolve incongruities. Enclosure 1 should not be interpreted as a simple list of expected corrections.
M. Tschiltz 2
Any revision to NEI 98-03 also provides an opportunity to reflect needed updates, clarifications, corrections, and additions to the previously endorsed guidance of NEI 98-03, Revision 1. The NRC staff set forth specific revisions in Enclosure 2 via a redline markup of NEI 98-03 Draft Revision 2 that request specific changes in several general areas including:
Updating outdated references; Removing internally inconsistent guidance concerning historical information; Clarifying the treatment of commitments in the FSAR; Providing recommendations on FSAR format for submittal of updates; Adding guidance for considering the need to update the FSAR to reflect third-party information (e.g., Army Corps of Engineers Reports, National Geologic Survey, etc.);
Referencing guidance for updating the FSAR to reflect license renewal and decommissioning activities; and, Clarifying expectations regarding updating beyond-design-basis information.
The NRC has identified an inconsistency within NEI 98-03, Revision 1 related to the treatment of historical information. It should be noted that historical information, third-party information, and beyond-design-basis discussions may be considered by some as inter-related. The treatment of information added to the design bases coming from implementation of lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant are intended to be explicitly addressed under the consideration of new information developed by a third-party that could affect the plant.
The current guidance for historical information suggests that hydrology and seismic information do not change and therefore no update is ever needed. Enclosure 2 includes a proposed change to clarify that information, such as hydrology and seismic information, is considered historical and does not require an update in the FSAR provided no significant change has been made. These positions reflect the Statement of Consideration (45 FR 30614; May 9, 1980) for 10 CFR 50.71(e) and the associated Generic Letter 81-06, Periodic Updating of Final Safety Analysis Reports (ADAMS Accession No. ML031080517).
also proposes the addition of a new section addressing the updating of aging management and time limited aging analyses information, which is primarily taken from Regulatory Issue Summary 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses, (ADAMS Accession No. ML100250279).
Additional comments on previously endorsed text from NEI 98-03, Revision 1 is set forth in. NRC is not requesting that these comments be addressed before NEI pursues endorsement. They are provided for your additional consideration only.
As RG 1.181, Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e), (ADAMS Accession No. ML992930009) was used to endorse Revision 1, revising RG 1.181 would be an appropriate vehicle for formal endorsement of an acceptable revision in the future.
M. Tschiltz 3
If you have any questions or concerns, please contact Dr. Barbara Hayes, Project Manager, at 301-415-7442 or via email at Barbara.Hayes@nrc.gov.
Sincerely,
/RA/
Robert Caldwell, Acting Director Division of Engineering, Infrastructure and Advanced Reactors Office of New Reactors Project No.: 689
Enclosures:
- 1. NRC Comments on Draft NEI 98-03, Rev. 2 relative to 10 CFR Part 52
- 2. Redline of NEI 98-03 Draft Rev. 2 with requested edits to sections previously endorsed under NEI 98-03, Rev. 1
- 3. Additional comments on previously endorsed sections of NEI 98-03, Rev. 1 for NEI consideration cc: Kati Austgen, NEI See next page
- VIA EMAIL NRO-002 OFFICE PM:NRO/DEIA/NRCB LA:NRO/DEIA/NRCB BC:NRO/DEIA/NRCB NAME BHayes BAbeywickrama*
JColaccino DATE 08/09/16 08/11/16*
02/13/17 OFFICE DD:NRO/DNRL DD:NRO/DSEA DD:NRO/DSRA NAME FAkstulewicz (TSmith for)*
SFlanders (SDevlin-Gill for)*
JMonninger (DAndukrat for)*
DATE 11/15/16*
10/21/16*
10/24/16*
OFFICE DD:NRR/DORL OGC D:NRO/DEIA NAME EBenner (ML16159A150)
KRoach RCaldwell DATE 6/21/16*
1/30/17*
02/28/17
Page 1 of 5 NEI New Reactors Mailing List cc:
Mr. Gary Wright, Director Division of Nuclear Facility Safety Illinois Emergency Management Agency 1035 Outer Park Drive Springfield, IL 62704
Page 2 of 5 NEI New Reactors Mailing List (Revised 08/25/2015)
Email 4pareez@gmail.com Alan.Levin@areva.com (Alan Levin) alsterdis@tva.gov (Andrea Sterdis) awc@nei.org (Anne W. Cottingham) awyche@bechtel.com (Altheia Wyche) bellesrj@ornl.gov (Randall Belles) bendoj@asme.org (John Bendo)
Betsy Langille (ealangille@tva.gov) bevans@enercon.com (Bob Evans) bevardbb@ornl.gov (Bruce Bevard)
Bojan.Petrovic@gatech.edu (Bojan Petrovic) brian.turner@oca.iowa.gov (Brian Turner)
BSims@Becht.com (Robert Sims) bwwaites@southernco.com (Brandon Waites) carey.fleming@cenglic.com (Carey Fleming) ccmsc@verizon.net (Mike Callahan) cee@nei.org charles.bagnal@ge.com (Charles Bagnal) collinlj@westinghouse.com (Leslie Collins) cposlusny@babcock.com (Chester Poslusny)
CumminWE@Westinghouse.com (Edward W. Cummins) curtisslaw@gmail.com (Jim Curtiss) cwaltman@roe.com (C. Waltman) david.distel@exeloncorpo.com (David J. Distel) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) david.newland@cnsc-ccsn.gc.ca (David Newland) dchapin@mpr.com (Douglas Chapin)
DeLaBarreR@state.gov (R. DeLaBarre) dianed@nirs.org (Dianed) dominiquef@nirs.org (Dominique French) don.tormey@iub.iowa.gov donald.woodlan@luminant.com (Donald Woodlan) dpstout@tva.gov (Daniel P. Stout) draleigh@curtisswright.com (Denna Raleigh) ecullington@earthlink.net (E. Cullington) ed.burns@earthlink.net (Ed Burns) eddie.grant@excelservices.com (Eddie Grant) elyman@ucsusa.org (Ed Lyman) erg-xl@cox.net (Eddie R. Grant) esmith@moenviron.org (Edward Smith) ewallace@nuscalepower.com (Ed Wallace)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
Page 3 of 5 NEI New Reactors Mailing List fletcher@exchangemonitor.com garent@tva.gov (Gordon Arent)
George_Stramback@Charter.net (George Stramback) ggeaney@mpr.com (George Geaney)
GovePA@BV.com (Patrick Gove) gyoung4@entergy.com (Garry Young) hankwon.choi@wgint.com (Hankwon Choi) hickste@earthlink.net (Thomas Hicks) hwilchins@epsilonsystems.com (Howard Wilchins) jack.kasper@parsons.com (Jack Kasper) jahalfinger@babcock.com (Jeff Halfinger) james1.beard@ge.com (James Beard) james2.ross@ge.com (James Ross) jason.parker@pillsburylaw.com (Jason Parker) jennifer.easler@oca.iowa.gov (Jennifer Easler) jerald.head@ge.com (Jerald Head) jgutierrez@morganlewis.com (Jay M. Gutierrez)
Jim.Kinsey@inl.gov (James Kinsey) jim.sundermeyer@iub.iowa.gov jmr@nei.org (Jeannie Rinckel)
JNR@NuScalePower.com (Jose N. Reyes) john.elnitsky@pgnmail.com (John Elnitsky) john.holt@nreca.coop (John Holt) john.oneill@pillsburylaw.com (John O'Neill)
Joseph_Hegner@dom.com (Joseph Hegner) jrappe@nuscalepower.com (Jodi Rappe) jwh@nei.org (Jerry Hiatt) jwh1@nreca.coop (John Holt) kahtan1234@yahoo.com KAK@nei.org (Kimberly Keithline) kerri.johannsen@iub.iowa.gov klingcl@westinghouse.com (Charles Kling) kouhestani@msn.com (Amir Kouhestani) kra@nei.org (Katie Austgen)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)
Kwelter@NuScalePower.com (Kent Welter) larry.stevens@iub.iowa.gov lchandler@morganlewis.com (Lawrence J. Chandler) libby.jacobs@iub.iowa.gov mack.thompson@iub.iowa.gov marcel.deVos@cnsc-ccsn.gc.ca (Marcel DeVos) marilyn.kray@exeloncorp.com mark.holbrook@inl.gov (Mark Holbrook) martha.shields@nuclear.energy.gov (Martha Shields) media@nei.org (Scott Peterson)
Page 4 of 5 NEI New Reactors Mailing List mgiles@entergy.com (M. Giles) mirskys@saic.com (Steven Mirsky)
MSF@nei.org (Marvin Fertel) murawski@newsobserver.com (John Murawski) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
P.Stefanovic@Holtec.com (Peter Stefanovic) parveen.baig@iub.iowa.gov patriciaL.campbell@ge.com (Patricia L. Campbell) paul.gallagher@parsons.com (Paul Gallagher)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) pcarlone@mpr.com (Pete Carlone) peter@hastings-group.com (Peter Hastings) phg@nei.org (Paul Genoa)
PLorenzini@NuScalePower.com (Paul Lorenzini) poorewpiiI@ornl.gov (Willis P. Poore III) pshastings@tva.gov (Peter Hastings) ramana@Princeton.EDU (M. V. Ramana) rbarrett@astminc.com (Richard Barrett) richard.sweigart@duke-eneergy.com (Richard Sweigart)
RJB@NEI.org (Russell Bell) robert.haemer@pillsburylaw.com (Robert Haemer) robert.kitchen@pgnmail.com (Robert H. Kitchen) ronald.polle@oca.iowa.gov rritzman@firstenergycorp.com (R. Ritzman)
RSnuggerud@NuScalePower.com (Ross Snuggerud) rxm@nei.org (Rod McCullum) sabinski@suddenlink.net (Steve A. Bennett) sfrantz@morganlewis.com (Stephen P. Frantz) shobbs@enercon.com (Sam Hobbs) siciliatom@hotmail.com (Mark Campagne) stephan.moen@ge.com (Stephan Moen) stephen.markus@pillsburylaw.com (Stephen Markus) steven.hamrick@fpl.com (Steven Hamrick) swender@FirstEnergyCorp.com (Samuel Wender IV) swkline@bechtel.com (Steve Kline) tedquinn@cox.net (Ted Quinn) tgado@roe.com (Burns & Roe) timothy.beville@nuclear.energy.gov (Timothy Beville) tjhester@midamerican.com (Tom J. Hester) tjk@nei.org (T.J. Kim) tom.miller@nuclear.energy.gov (Thomas P. Miller) troche@absconsulting.com (Thomas Roche) trsmith@winston.com (Tyson Smith)
Page 5 of 5 NEI New Reactors Mailing List Vanessa.quinn@dhs.gov (Vanessa Quinn) vince.gilbert@excelservices.com (Vince Gilbert) vka@nei.org (Victoria Anderson)
Wanda.K.Marshall@dom.com (Wanda K. Marshall) wayne.marquino@ge.com (Wayne Marquino) whorin@winston.com (W. Horin) william.mcint.com (William Mctigue) wwbx@hyperionpowergeneration.com (Willis Bixby) x2gabeck@southernco.com (Gary Becker)