Correction to Amendment Nos. 248 and 243 Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program
ML16222A243
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/16/2016
From: Dion J
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Dion J
References
CAC ME3374, CAC ME3375
Download: ML16222A243 (5)


Text

Mr. Bryan C. Hanson Senior Vice President UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August16,2016 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1AND2-CORRECTION TO AMENDMENT NOS. 248 AND 243 REGARDING RISK-INFORMED JUSTIFICATION FOR THE RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCY REQUIREMENTS TO A LICENSEE-CONTROLLED PROGRAM

Dear Mr. Hanson:

By letter dated February 18, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102920260), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 248 and 243 to Renewed Facility Operating License Nos. DPR-29 and DPR-30 for the Quad Cities Nuclear Power Station (QCNPS), Units 1 and 2. The amendments approved the adoption of NRC-approved Technical Specification Task Force (TSTF-425), Revision 3, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative Sb." This amendment relocated most periodic frequencies of technical specification (TS) surveillances to a licensee-controlled program, "Surveillance Frequency Control Program,"

and provides requirements for the new program in the Administrative Controls section of the TS.

During a recent TS review performed by the NRC staff, an error was identified in the footer of TS page 3.1.7-2 which erroneously indicates "Dresden 2 and 3" instead of "Quad Cities 1 and 2."

This error is administrative in nature and appeared in the camera-ready TS pages included in the amendment package issued on February 18, 2011. No other errors associated with the subject amendments were identified. The corrected TS page is enclosed.

8. Hanson If you have any questions, I can be reached at (301) 415-1349.

Docket Nos. 50-254 and 50-265

Enclosure:

Sincerely, eanne A. Dion, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

1. Corrected TS page for Amendment No. 248/243 to Renewed DPR-29/30 cc w/enclosures: Distribution via Listserv

CORRECTIONS TO LICENSE AMENDMENTS NOS. 248 and 243 QUAD CITIES NUCLEAR POWER STATION. UNIT 1 AND 2 RENEWED FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 DOCKET NOS. 50-254 AND 50-265 Replace the following page of Quad Cities Unit 1 for Appendix A (ML053040348) Technical Specifications with the attached revised page. Quad Cities Unit 2 uses the same Appendix A as Quad Cities Unit 1.

Remove 3.1.7-2 Insert 3.1.7-2

SURVEILLANCE REQUIREMENTS SR 3.1.7.1 SR 3.1.7.2 SR 3.1.7.3 SR 3.1.7.4 SURVEILLANCE Verify available volume of sodium pentaborate solution is within the limits of Figure 3.1.7-1.

Verify temperature of sodium pentaborate solution is within the limits of Figure 3.1.7-2.

Verify temperature of pump suction piping is;::: 83°F.

Verify continuity of explosive charge.

SLC System 3.1. 7 FREQUENCY In accordance with the Survei 11 ance Frequency Control Program In accordance with the Survei 11 ance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Survei 11 ance Frequency Control Program (continued)

Quad Cities 1 and 2 3.1.7-2 Amendment No. 248/243

ML16222A243 OFFICE DORULPL3-2/PM DORULPL3-2/LA DORULPL3-2/BC*

NAME JD ion SRohrer EMiller DATE 8/10/2016 8/9/2016 8/12/2016