ML16221A347

From kanterella
Jump to navigation Jump to search
U.S. Department of the Interior Change in the Staff at the U.S. Geological Survey Triga Reactor Facility
ML16221A347
Person / Time
Site: U.S. Geological Survey
Issue date: 07/21/2016
From: Nuccio V
US Dept of Interior, Geological Survey (USGS)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16221A347 (1)


Text

United States Department of the Interior U.S. GEOLOGICAL SURVEY 12201 Sunrise Valley Drive Reston, VA 20192 July 21, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

This is to notify you of a change in the staff at the U.S. Geological Survey (USGS) TRIGA reactor facility. Effective July 24, 2016, Tim DeBey is stepping down from the position of Reactor Supervisor, but will remain on staff as a Senior Reactor Operator (SRO). Brycen Roy, staff SRO, will be the interim Reactor Supervisor until a permanent replacement can be hired. Mr. Roy graduated from the Colorado School of Mines in 2009 with a Master of Science Degree in Material Science. He has 9 years of experience at the USGS facility.

Mr. Roy's contact information is given below. Please update our facility file.

Phone: 303-236-4726 Fax:303-236-4717 Email: broy@usgs.gov Mail: Brycen Roy P.O. Box25046, MS 974 Denver Federal Center Denver, CO 80225-0046 Concurrent with this change, please make Mr. Roy the Nuclear Regulatory Commission Designated Official for the USGS reactor facility.

If you have any questions regarding this matter, please contact me at (303) 236-1654.

Sincerely, Vito Nuccio USGS Reactor Administrator cc: Geoffrey Wertz, NRC Project Manager Mike Morlang, NRC Facility Inspector USGS Reactor Operations Committee GSTR Staff