ML16200A412

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Revision 13, Drawings 1-NHY-310107, 125V DC Bus I-SWG-11B Distr Panel I-PP-111B Schedule Sh. 93. Through 1-BRS-B20859, Boron Recovery System Evaporation Detail. - Redacted
ML16200A412
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/05/2010
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Lamb, John, NRR
References
LTR-16-0080, ML12087A146, SBK-L-10066
Download: ML16200A412 (90)


Text