ML16183A106

From kanterella
Jump to navigation Jump to search
2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-3
ML16183A106
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/10/2016
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
ES-301-3, L-Pl-16-024
Download: ML16183A106 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: PRAIRIE ISLAND Date of Examination: MAY 2016 Operatlnci Test Number: Pl-IL T-NRC-16

1. General Criteria Initials a

b*

c#-

~

v

a.

The operating test conforms with the previously approved outline; changes are consistent with

oi

~

samolino (eauirements (e.o. 10 CFR 55.45, operational importance, safetv function distribution).

b.

There is no day-to-day repetition between this and other operating tests to be administered

~ ~ ~

during this examination.

c.

The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) s01 ¥

,L

d.

Overlap with the written examination and between different parts of the operating test is within

$ql ¥ cl acceptable limits.

e.

It appears that the operating test will differentiate between competent and less-than-competent 571 ~

~

applicants at the desicinated license level.

2. Walk-Throui:ih Criteria
a.

Each JPM includes the following, as applicable:

initial conditions initiating cues

~ ¥

. references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific J~

designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable

b.

Ensure that any changes from the previously approved systems and administrative walk-through

~M outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance S01.qv criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-So1 ~

~W\\

301-4 and a copy is attached.

Printed Name I Signature Date

a.

Author

~"1

$¢.1'2.Vo.51~ )~~

-:.b.. 1.d1k

b.

Facility Reviewer(*)

Ji

/~' ~

~TGPHEN $EILH 1MER

'\\.... *uJ'L 'A 'Y 3{LB/y,

c.

NRC Chief Examiner(#) :D.eJt ~ A1,JI flt.. /

~/ ~

  1. 1~~7_.. p

~/,1/e,1~

d.

NRC Supervisorhf f~ ~~.. ~-'( -er\\'.~~..... \\. J Jf4 I/I~ -

6LnL~D-2 I

I NOTE:

  • The facility signature is not applicable for NRG-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.