ML16173A123

From kanterella
Jump to navigation Jump to search
Request to Withdraw GEH Vallecitos Nuclear Center (Vnc) Root Cause Investigation Report- Nuclear Test Reactor (Ntr) Operator License Expiration
ML16173A123
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 06/21/2016
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SPM 16-023
Download: ML16173A123 (1)


Text

GE Hitachi Nuclear Energy SPM 16-023 HITACHI Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA (91 0) 819-5950 June 21, 2016 scott.murray@ge.com US Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-001 Attention: Mr. Duane Hardesty

Subject:

Request to Withdraw GEH Vallecitos Nuclear Center (VNC) Root Cause Investigation Report- Nuclear Test Reactor (NTR) Operator License Expiration

References:

1) NRC License R-33, Docket 50-73
2) GEH Event Report 51789, 3/14/16
3) GEH Written Follow-Up Report- NTR Operator License Expiration, 3/24/16
3) R-33 NTR License Technical Specifications, Revision 1, 5/15/07
4) Letter S.P. Murray to NRC Document Control Desk, VNC Root Cause Investigation Report, 5/27/16
5) Letter D.A. Hardesty to S.P. Murray, GEH Request for Withholding Information From Public Disclosure, 6/8/16 GE Hitachi Nuclear Energy Americas, LLC (GEH) hereby requests withdrawal of the VNC NTR operator license expiration root cause investigation report that was provided to NRC for informational purposes on May 27, 2016 (Reference 4). As a result, GEH also requests that copies of the investigation report possessed by NRC be destroyed.

If you have any questions concerning this request, please call Tom Caine at (925) 918-6018 or me at (910) 819-5950.

Sincerely,

!:;:!1/!2~

Facility L1cens1ng nag[//

Commitments: None Attachments: None Cc: 0. Font, NRC NRR