ML16172A200

From kanterella
Jump to navigation Jump to search
Redacted - Palisades - Final Safety Analysis Report Update, Revision 32, Chapter 7 - Instrumentation and Controls - Figures
ML16172A200
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/18/2016
From: Jennivine Rankin
Plant Licensing Branch III
To:
Rankin J, NRR/DORL/LPLIII-1, 415-1530
References
Download: ML16172A200 (76)


Text

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-1 Revision 30 REACTOR PROTECTION SYSTEM BLOCK DIAGRAM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-3 Revision 21 TYPICAL MEASUREMENT CHANNEL FUNCTIONAL DIAGRAM

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-4 Revision 30 SCHEMATIC DIAGRAM PRESSURIZER PRESSURE ATWS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-5 Revision 21 SCHEMATIC DIAGRAM PRESSURIZER PRESSURE ATWS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-6 Revision 21 LOW FLOW PROTECTIVE SYSTEM FUNCTIONAL DIAGRAM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-8 Revision 31 NEUTRON FLUX MONITORING SYSTEM START-UP AND LOGARITHMIC RANGE CHANNELS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-9 Revision 31 NEUTRON FLUX MONITORING SYSTEM POWER RANGE CHANNELS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-10 Revision 21 POWER RATE-OF-CHANGE TRIP AND PRETRIP INTERFACE WITH RPS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-11 Revision 21 ZERO POWER MODE BYPASS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-12 Revision 21 REACTOR PROTECTIVE SYSTEM INTERFACES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-13 Revision 21 LOGIC DIAGRAM SAFETY INJECTION INITIATION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 1 Revision 31 LOGIC DIAGRAM MAIN GENERATOR PROTECTION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 2 Revision 32 LOGIC DIAGRAM TURBINE-GENERATOR TRIPS AND FAST TRANSFER

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 3 Revision 32 LOGIC DIAGRAM 2400 VOLT LOAD SHED

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 4 Revision 30 LOGIC DIAGRAM DIESEL START

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 5 Revision 30 LOGIC DIAGRAM DIESEL ENGINE CONTROL, TRIPS AND ALARMS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 6 Revision 21 LOGIC DIAGRAM DIESEL GENERATOR BREAKERS

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 7 Revision 30 LOGIC DIAGRAM BUS 1C AND 1D INCOMING BREAKERS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 8 Revision 21 LOGIC DIAGRAM POWER TO BUS 1E, 1F, AND 1G INCOMING BREAKERS

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 9 Revision 30 LOGIC DIAGRAM BUS 1A & 1 B INCOMING BREAKERS

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 11 Revision 30 LOGIC DIAGRAM START-UP XFMR PROTECTION

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-14, SHT 12 Revision 30 LOGIC DIAGRAM SAFEGUARD TRANSFORMER 1-1

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-15 Revision 26 SCHEMATIC DIAGRAM SAFETY INJECTION SIGNAL AUXILIARY CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-16 Revision 21 SCHEMATIC DIAGRAM SAFETY INJECTION SIGNAL AUXILIARY CIRCUITS

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-17 Revision 30 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-19 Revision 21 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING CIRCUITS

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-20 Revision 30 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-21 Revision 27 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING TEST CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-22 Revision 27 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING TEST CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-23 Revision 27 SCHEMATIC DIAGRAM SAFETY INJECTION AND SEQUENCE LOADING TEST CIRCUITS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-24 Revision 24 LOGIC DIAGRAM CONTAINMENT HIGH PRESSURE SIGNAL

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-25 Revision 22 LOGIC DIAGRAM CONTAINMENT HIGH RADIATION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-28 Revision 31 SCHEMATIC DIAGRAM CONTAINMENT ISOLATION ON HIGH PRESSURE OR HIGH RADIATION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-30 Revision 27 LOGIC DIAGRAM SIS TEST AND RAS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-31 Revision 28 SCHEMATIC DIAGRAM SIRW TANK AND CONTAINMENT SUMP VALVES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-32 Revision 28 SCHEMATIC DIAGRAM SIRW TANK AND CONTAINMENT SUMP VALVES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-33 Revision 21 LOGIC DIAGRAM LEGEND AND NOTES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-34 Revision 21 LOGIC DIAGRAM LEGEND AND NOTES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-35 Revision 21 LOGIC DIAGRAM LEGEND AND NOTES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-36 Revision 21 SCHEMATIC DIAGRAM STEAM GENERATOR LEVEL INSTRUMENTATION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-37 Revision 21 LOGIC DIAGRAM AUXILIARY FEEDWATER ACTUATION SYSTEM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-38 Revision 21 LOGIC DIAGRAM MOTOR DRIVEN AUXILIARY FEEDWATER PUMP P-8A

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-39 Revision 21 LOGIC DIAGRAM MOTOR DRIVEN AUXILIARY FEEDWATER PUMP P-8C

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-41 Revision 30 INTERFACE LOOP DIAGRAM PUMP LOW SUCTION PRESSURE TRIP

FSAR CHAPTER 7 INSTRUMENTATION AND CONTROLS FIGURE 7-43 Revision 30 INTERFACE LOOP DIAGRAM FLOW CONTROL

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-45 Revision 31 INTERFACE DIAGRAM FLOW AND PRESSURE INDICATION

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-46 Revision 21 LOGIC DIAGRAM AUX FEEDWATER FLOW CONTROL AND PUMP TEST LOGIC

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-47 Revision 21 LOGIC DIAGRAM AUXILIARY FEEDWATER FLOW CONTROL AND PUMP TEST LOGIC

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-48 Revision 21 LOGIC DIAGRAM AUXILIARY FEEDWATER ACTUATION SYSTEM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-49 Revision 21 LOGIC DIAGRAM AUXILIARY FEEDWATER - STEAM GENERATOR ISOLATION VALVES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-50 Revision 21 LOGIC DIAGRAM AUXILIARY FEEDWATER - STEAM GENERATOR ISOLATION VALVES

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-51 Revision 21 LOGIC DIAGRAM AFAS-FOGG REMOTE DISPLAY AND ANNUNCIATOR ASSIGNMENT

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-52 Revision 21 LOGIC DIAGRAM AFAS-FOGG REMOTE DISPLAY AND ANNUNCIATOR ASSIGNMENT

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-53 Revision 23 REACTOR SHUTDOWN CONTROLS

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-54 Revision 29 REACTOR REGULATING SYSTEM BLOCK DIAGRAM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-55 Revision 31 ROD DRIVE CONTROL SYSTEM SCHEMATIC DIAGRAM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-56 Revision 25 ROD POSITION SETPOINTS Power Shutdown Regulating Shaping Rods Rods Rods Upper Upper Upper Electrical 131 Electrical 131 Electrical 131 Limit Limit Limit Upper Upper Exercise Rod 130 Rod 130 Stop Stop Band Shutdown Rod Insertion 124 Interlock and Alarm Upper Sequential 83 Permissive Lower Sequential Permissive 51 Pre-Power Dependent PDIL + 5" Insertion Limit Alarm (PPDIL)

Power Dependent PDIL Insertion Limit Alarm (PDIL) Lower 4

Rod Stop Regulating Rod 6

Withdrawal Interlock Lower 4

Rod Stop 3 Lower Electrical 3 Lower Electrical 1/2 Lower Electrical Limit Limit 0 Limit 0 0

NOTE: All Setpoint are in inches from bottom.

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-57 Revision 21 PRESSURE CONTROL PROGRAM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-58 Revision 21 BLOCK DIAGRAM STEAM DUMP AND BYPASS SYSTEM

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-59 Revision 21 PRESSURIZER LEVEL CONTROL SYSTEM FAILURES STUDY MODE "A" FAILURE

FSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS FIGURE 7-60 Revision 21 PIPING DRAWING NUCLEAR DETECTOR WELLS Portions of this page have been redacted per 10 CFR 2.390(d)(1).