ML16162A343

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 3 to Administration & Logistics Plan of Crisis Mgt Team.Receipt Form Encl
ML16162A343
Person / Time
Site: Oconee, Mcguire, McGuire, 05000000
Issue date: 03/29/1982
From: Parker W
Duke Power Co
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A342 List:
References
NUDOCS 8204120152
Download: ML16162A343 (3)


Text

0 DUKE POWER COMPANY POWER BUILDING 422 SOUTH CHURCH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.

March 29 1982 VIcE PRESIDENT M

I EPHONE: AREA 704 STEAM PRODUCTION 373-4083 Mr. Harold R. Denton, Director APR 0119821% 2 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission M

mm Washington, D. C. 20555 Re: McGuire Nuclear Station Oconee Nuclear Station Docket Nos. 50-369, 50-370, 50-269, 50-270, 50-287

Dear Mr. Denton:

Enclosed for NRC Staff.use and review are ten copies of Revision 3 (dated February 1, 1982) to the Administration and Logistics Group Plan of the Crisis Management Plan for McGuire and Oconee Nuclear Stations Implementing Procedures.

These should be incorporated into your Implementing Plans Manuals, removing the earlier version pages of this plan.

Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room. Specifically:

Pages B-3, B-5, B-6, B-9, B-10, B-39, B-40 D-13, D-14, D-15, D-16, D-17 G-2 H-2, H-4 1-2 J-1, J-2, J-3 By copy of this letter, three copies of.thea provided to NRC-Region II.

Ve y truly yours, William 0. Parker, Jr.

PBN/jfw Enclosures 320412015 820406 PDR ADOCK 0500269

__PDR_

Harold R. Denton March 29, 1982 Page 2 cc:

(w/o enclosure)

Mr. P. R. Bemis Senior Resident Inspector-NRC McGuire Nuclear Station (w/3 copies of enclosure)

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia. 30303

February 26, 1982 HOLDERS OF THE ADMINISTRATION AND LOGISTICS PLAN CRISIS MANAGEMENT TEAM

Subject:

Revision 3 February 1, 1982 Enclosed are additions or revisions to be incorporated into the Administration and Logistics Plan.

Pages to be Deleted Pages to be Added (Rev. 3)

Cover Sheet Cover Sheet Table of Contents i, iii, iv, v Table of Contents i, iii, iv, v A-2 through A-13 A-2 through A-15 Entire B Section Entire B Section Entire C Section Entire C Section D-1 through D-18 D-1 through D-18 E-1 E-1 F-1, F-2, F-3 F-1, F-2, F-3 G-1, G-2 G-1, G-2 Entire H Section Entire H Section I-1, 1-2, 1-3, 1-6, 1-9 I-1, 1-2, 1-3, 1-6, 1-9 J-1 through J-8 J-1 through J-8 K-1, K-2, K-8 K-1, K-2, K-8 Entire Index (a through g)

Entire Index (a through g)

Upon incorporation of the above into your manual, please indicate below by signing this letter and returning it to me along with your outdated pages no later than March 8, 1982.

Sharon H. Friday Administration Director 7----------------------

I have incorporated Revision 3 into my manual.

Enclosed are the voided pages.

Signed Date