Category:Letter type:SBK
MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic SBK-L-20077, Core Operating Limits Report for Cycle 212020-06-0101 June 2020 Core Operating Limits Report for Cycle 21 2024-04-12
[Table view] Category:Licensee Response to Notice of Violation
[Table view] |
Text
NEXTera
SEABROOK June 6, 2016 Docket No. 50-443 SBK-L-16076 '
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Reply to a Notice of Violation; EA-16-101
Reference:
Seabrook Station, Inspection Report 05000443/2016008 Related to Alkali-Silica Reaction Affects on Safety-Related Concrete Structures and Notice of Violation NextEra Energy Seabrook, LLC (NextEra Energy Seabrook), has reviewed the subject Notice of Violation and files the attached Reply to Notice of Violation EA-16-101 pursuant to 10 CFR 2.201.
If there are any questions regarding this letter, please contact Mr. Michael Ossing, Licensing Manager, at (603) 773-7512.
Sincerely, NextEra Energy Seabrook, LLC Eric McCartne)T Site Vice President cc: NRC Region I Administrator NRC Project Manager NRC Senior Resident Inspector NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 to SBK-L-16076 SBK-L-16076 Page 1 of 3 Statement of Violation:
During an NRC inspection conducted between February 1 and March 24, 2016, a violation ofNRC's requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," states, in part, that activities affecting quality shall be prescribed by documented instructions, procedures or drawings, of a type appropriate to the circumstances, and shall be accomplished in accordance with these instructions, procedures or drawings.
N extEra Nuclear Fleet Administrative Procedure, EN-AA-203-1001, "Operability Determinations/Functionality Assessments," identifies the responsibilities and requirements for preparation and approval of Immediate Operability Determinations (IOD) and Prompt Operability Determinations (POD) for establishing the acceptability of continued operation of a plant structure, system, or component that is suspected to be degraded or nonconforming. Per Section 2.0, Terms and Definitions, IODs are performed by the Shift Manager without delay (within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of discovery), using best available information to make an operability declaration. Upon request of the Shift Manager, a POD is performed as a follow-up to an IOD when additional information is needed to confirm the declaration of operability.
Contrary to the above, on two occasions between March 17, 2015, and January 22, 2016, NextEra Energy Seabrook, LLC (NextEra) did not accomplish an activity affecting quality in accordance with its procedure. Specifically, NextEra received information from vendors identifying non-conforming conditions adversely impacting two reinforced concrete structures at Seabrook Station, and did not complete an appropriate IOD or initiate a follow-up POD to evaluate the impact of that non-conforming condition on structural performance. In particular,
- 1) On March 17, 2015, NextEra entered a WJE report, entitled "Condition Assessment of the Cracking in the RHR and CS Equipment Vault," into the station document tracking system and added the report's recommendations into the Corrective Action Program under Action Report (AR) 01977456, without completing an appropriate IOD or initiating a POD. The report identified structural loading (a load not considered by ACI 318-71, the design and construction code ofrecord) due to ASR as the cause for the excessive bulk expansion and cracking of the RHR/CS Vault interior and exterior support walls, and
- 2) On December 2, 2015, NextEra initiated AR 02094762 to track recommendations from SG&H report entitled "Evaluation and Design Confirmation of As-Deformed CEB," without completing an appropriate IOD or initiating a POD. The report also identified structural loading due to ASR as the cause for deformation of the Contairu:llent Enclosure Building (CEB), a condition not conforming with ACI 318-71.
This violation is associated with a Green Significance Determination Process finding.
SBK-L-16076 Page 2of3 NextEra Energy Seabrook's Reply to the Notice of Violation I. Reason for Violation The reason for the violation is that the reviewer of the vendor reports did not follow the requirements of EN-AA-203-1001, Operability Determinations I Functionality Assessments. The cause for the violation was determined to be an over-reliance on the site's subject matter expert for both technical and oversight roles. The subject matter expert was focused more on the potential impact on the structures, versus comprehensively documenting and dispositioning newly identified potential non-conforming conditions.
II. Corrective Steps Taken and Results Achieved
- On February 12, 2016, a Prompt Operability Determination for RHR Equipment Vault concrete cracking addressing the information contained in WJE report entitled "Condition Assessment of the Cracking in the RHR and CS Equipment Vault," was approved. (AR 1977456)
- Established the expectation via a read and sign that a cross-discipline team will be utilized to review new vendor documentation for ASR and building deformation issues.
III. Corrective Steps That Will be Taken including a comprehensive and integrated ASR corrective action plan for resolving ASR induced non-conformances with the current licensing basis and the date when the structures monitoring program will be revised to monitor the progression of ASR degradation related to bulk expansion and deformation:
- 1. Reinforce the lessons learned from this event and the requirements ofEN-AA-203-1001, including entry requirements and the need for timely and comprehensive I ODs and PODs, with Design Engineering.
- 2. Revise the Building Structures Monitoring Program to capture the use of the cross-discipline team to review new vendor documentation for ASR and building deformation issues.
- 3. A comprehensive and integrated ASR corrective action plan for resolving ASR-induced non-conformances with the current licensing basis has been developed and is provided in Attachment 2.
- 4. The date the structures monitoring program will be revised to monitor the progression of ASR degradation related to bulk expansion and deformation is provided in Attachment 2.
SBK-L-16076 Page 3 of3 IV. Date When Full Compliance Will Be Achieved Full compliance for the cited violation was achieved on February 19, 2016 when the second POD discussed in the notice of violation was approved by the Shift Manager. The schedule for the additional comprehensive corrective actions required by the NRC's notice of violation is provided in Attachment 2.
to SBK-L-16076 SBK-L-1607 6 Page 1of1 A comprehensive and integrated ASR corrective action plan for resolving ASR induced non-conformances with the current licensing basis and the date when the structures monitoring program will be revised to monitor the progression of ASR degradation related to bulk expansion and deformation:
- 1. Submit a License Amendment Request to reconcile current licensing basis to address ASR impacts on structures inclusive of a methodology change for evaluating structural deformation of Seismic Category 1 structures. Due Date: July 31, 2016
- 2. Revise ASR Structures Monitoring Program to include ASR induced deformation effects monitoring and methodology. Due Date: August 19, 2016
- 3. Conduct Core Bore Sampling and Installation of extensometers to monitor out of plane expansion in various plant locations to be representative of plant structures' conditions and to allow monitoring of levels of ASR. Due Date: December 31, 2016
- 4. Perform Susceptibility Evaluations on all Seismic Category 1 structures in a risk ranked progression order. Due Date: June 30, 2017
- 5. Complete Final Detailed Analysis Calculations of record for all Required Structures for ACI Code 318-71 Compliance. Due Date: July 31, 2017