IPRenewal NPEmails From: Dahl, George <gdahl@entergy.com>

Sent: Tuesday, April 26, 2016 8:12 AM To: Floyd, Niklas

Subject:

[External_Sender] RE: Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts Hi Nik, We can have the entrance at 0800 on Wednesday. Starting at 0900 and for the remainder of the day, the baffle bolt team will be meeting with Westinghouse. The documents you requested will be available for your review, and you can observe the baffle bolt operations. The phone call will be 0900 on Thursday.

How long will the inspection last?

George Dahl IPEC Regulatory Assurance (914) 254-6676 gdahl@entergy.com From: Floyd, Niklas [1]

Sent: Monday, April 25, 2016 3:26 PM To: Dahl, George Cc: rwalpole@entergy.com

Subject:

Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts

George, Please provide the following documents in support of the upcoming NRC inspection at Indian Point Unit 2 regarding the current baffle bolt replacement project:
  • Indian Point Unit 2 ten-year in-service inspection program plan
  • Baffle-former bolt replacement plan o Evaluation for any modifications of the bolt design or material o Procedure for removal and installation of bolts
  • Condition reports and other corrective action documents related to vessel internals inspections over the last ten years
  • Contact List (name and phone number):

o ISI / ASME Section XI Exams Program Manager o Repair and Replacement Program Manager 1

o Baffle-Former Bolt Replacement Lead Also, I would like to conduct an entrance meeting on Wednesday morning sometime between 8:00 and 9:00 AM. I understand that you all will be holding a conference call at 9AM with myself and other NRC staff members to provide an update on the baffle bolt replacements. Please let me know if you have any questions regarding the information requested above.

Niklas Floyd Reactor Inspector Division of Reactor Safety USNRC Region I (610) 337-5282 2

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 6212 Mail Envelope Properties (B99DD79A4D0AE4428BFEB5312A0CEFA770D8CE09)

Subject:

[External_Sender] RE: Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts Sent Date: 4/26/2016 8:12:16 AM Received Date: 4/26/2016 8:13:00 AM From: Dahl, George Created By: gdahl@entergy.com Recipients:

"Floyd, Niklas" <Niklas.Floyd@nrc.gov>

Tracking Status: None Post Office: JDCXMETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 2414 4/26/2016 8:13:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

IPRenewal NPEmails From: Dahl, George <gdahl@entergy.com>

Sent: Tuesday, April 26, 2016 8:12 AM To: Floyd, Niklas

Subject:

[External_Sender] RE: Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts Hi Nik, We can have the entrance at 0800 on Wednesday. Starting at 0900 and for the remainder of the day, the baffle bolt team will be meeting with Westinghouse. The documents you requested will be available for your review, and you can observe the baffle bolt operations. The phone call will be 0900 on Thursday.

How long will the inspection last?

George Dahl IPEC Regulatory Assurance (914) 254-6676 gdahl@entergy.com From: Floyd, Niklas [2]

Sent: Monday, April 25, 2016 3:26 PM To: Dahl, George Cc: rwalpole@entergy.com

Subject:

Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts

George, Please provide the following documents in support of the upcoming NRC inspection at Indian Point Unit 2 regarding the current baffle bolt replacement project:
  • Indian Point Unit 2 ten-year in-service inspection program plan
  • Baffle-former bolt replacement plan o Evaluation for any modifications of the bolt design or material o Procedure for removal and installation of bolts
  • Condition reports and other corrective action documents related to vessel internals inspections over the last ten years
  • Contact List (name and phone number):

o ISI / ASME Section XI Exams Program Manager o Repair and Replacement Program Manager 1

o Baffle-Former Bolt Replacement Lead Also, I would like to conduct an entrance meeting on Wednesday morning sometime between 8:00 and 9:00 AM. I understand that you all will be holding a conference call at 9AM with myself and other NRC staff members to provide an update on the baffle bolt replacements. Please let me know if you have any questions regarding the information requested above.

Niklas Floyd Reactor Inspector Division of Reactor Safety USNRC Region I (610) 337-5282 2

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 6212 Mail Envelope Properties (B99DD79A4D0AE4428BFEB5312A0CEFA770D8CE09)

Subject:

[External_Sender] RE: Document Request for NRC Inspection of Indian Point Unit 2 Baffle Bolts Sent Date: 4/26/2016 8:12:16 AM Received Date: 4/26/2016 8:13:00 AM From: Dahl, George Created By: gdahl@entergy.com Recipients:

"Floyd, Niklas" <Niklas.Floyd@nrc.gov>

Tracking Status: None Post Office: JDCXMETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 2414 4/26/2016 8:13:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: