ML16132A392

From kanterella
Jump to navigation Jump to search
Information Pertaining to Foreign Ownership, Control, or Influence. Part 1 of 6
ML16132A392
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 04/22/2016
From: Halnon G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML16132A391 List:
References
L-16-092
Download: ML16132A392 (3)


Text

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 FENOC Rrst fneig)r Nuclear Operating Company 2' April 22, 2016 L-16-092 ATTN: Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket Nos. 50-334, 50-412; License Nos. DPR-66, NPF-73 Davis-Besse Nuclear Power Station Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Unit No. 1 Docket No. 50-440, License No. NPF-58 341 White Pond Dr.

Akron, Ohio 44320 10 CFR 95 Submittal of Information Pertaining to Foreign Ownership, Control, or Influence By letter dated May 18, 2011, the Nuclear Regulatory Commission (NRG) notified the FirstEnergy Nuclear Operating Company (FENOC) that a favorable Foreign Ownership, Control, or Influence (FOCI) review for FENOC was rendered by the NRG. As stated in the letter, new FOCI information is to be submitted for a FOCI redetermination Within five years of April 27, 2011. FENOC is submitting the attached five-year FOCI information, on behalf of the owners and operators of Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1; and Perry Nuclear Power Plant Unit No. 1.

The owners and operators of the aforementioned facilities are FirstEnergy Corp,;

FENOC; FirstEnergy Solutions Corp.; FirstEnergy Nuclear Generation, LLC; Ohio Edison Company; and The Toledo Edison Company. An organization chart showing the relationships between these companies is attached. Enclosures A through F provide

{)

non-proprietary versions of the FOCI information for each of the aforementioned

. PD D companies.

tJ S \\ \\'-

Enclosure H of this letter contains Confidential Financ.ial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Unit No. 1 Perry Nuclear Power Plant Unit No. 1 L-16-092 Page 2 Certain financial information contained in Enclosure H is confidential financial information, and FENOC requests that information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). A redacted version of the financial information suitable for public disclosure is provided in the non-proprietary Enclosures C and D. The redacted information is identified by brackets [ ]. An affidavit supporting the request for withholding Enclosure H from public disclosure is provided in Enclosure G.

Additionally, Enclosure H contains certain security-related and personal, private information. Public disclosure of the type of personal and private information provided would constitute a clearly unwarranted invasion of personal privacy. Therefore, FENOC requests this information be withheld from public disclosure pursuant to 10 CFR 2.390.

Redacted versions of the information is provided in the non-proprietary Enclosures A through F. The redacted information is identified by brackets [ ].

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.

Sincerely, I on sident, Regulatory Affairs and Laboratory Services

Attachment:

FirstEnergy Corp. Organizational Structure Enclosure H of this letter contains Confidential Financial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Unit No. 1 Perry Nuclear Power Plant Unit No. 1 L-16-092 Page 3

Enclosures:

A. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Corp.

B. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Solutions Corp.

C. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Nuclear Operating Company D. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Nuclear Generation, LLC E. Non-Proprietary Foreign Ownership Control or Influence Information for Ohio Edison Company F. Non-Proprietary Foreign Ownership Control or Influence Information for The Toledo Edison Company G. Affidavit of Gregory H. Halnon H. Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Corp. and Subsidiaries cc:

NRC Regional Administrator - Region I (without Enclosure H)

NRC Regional Administrator.- Region Ill (without Enclosure H)

NRR Project Manager - Beaver Valley Power Station (without Enclosure H)

NRR Project Manager - Davis Besse Nuclear Power Station (without Enclosure H)

NRR Project Manager - Perry Nuclear Power Plant (without.Enclosure H)

NRR Project Manager - FENOC Fleet (without Enclosure H)

NRC Resident Inspector - Beaver Valley Power Station (without Enclosure H)

NRC Resident Inspector - Davis Besse Nuclear Power Station (without Enclosure H)

NRC Resident Inspector - Perry Nuclear Power Plant (without Enclosure H)

Director BRP/DEP (without Enclosure H)

Site BRP/DEP Representative (without Enclosure H)

Utility Radiological Safety Board (without Enclosure H)

Enclosure H of this letter contains Confidential Financial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 FENOC Rrst fneig)r Nuclear Operating Company 2' April 22, 2016 L-16-092 ATTN: Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket Nos. 50-334, 50-412; License Nos. DPR-66, NPF-73 Davis-Besse Nuclear Power Station Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Unit No. 1 Docket No. 50-440, License No. NPF-58 341 White Pond Dr.

Akron, Ohio 44320 10 CFR 95 Submittal of Information Pertaining to Foreign Ownership, Control, or Influence By letter dated May 18, 2011, the Nuclear Regulatory Commission (NRG) notified the FirstEnergy Nuclear Operating Company (FENOC) that a favorable Foreign Ownership, Control, or Influence (FOCI) review for FENOC was rendered by the NRG. As stated in the letter, new FOCI information is to be submitted for a FOCI redetermination Within five years of April 27, 2011. FENOC is submitting the attached five-year FOCI information, on behalf of the owners and operators of Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station Unit No. 1; and Perry Nuclear Power Plant Unit No. 1.

The owners and operators of the aforementioned facilities are FirstEnergy Corp,;

FENOC; FirstEnergy Solutions Corp.; FirstEnergy Nuclear Generation, LLC; Ohio Edison Company; and The Toledo Edison Company. An organization chart showing the relationships between these companies is attached. Enclosures A through F provide

{)

non-proprietary versions of the FOCI information for each of the aforementioned

. PD D companies.

tJ S \\ \\'-

Enclosure H of this letter contains Confidential Financ.ial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Unit No. 1 Perry Nuclear Power Plant Unit No. 1 L-16-092 Page 2 Certain financial information contained in Enclosure H is confidential financial information, and FENOC requests that information be withheld from public disclosure pursuant to 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). A redacted version of the financial information suitable for public disclosure is provided in the non-proprietary Enclosures C and D. The redacted information is identified by brackets [ ]. An affidavit supporting the request for withholding Enclosure H from public disclosure is provided in Enclosure G.

Additionally, Enclosure H contains certain security-related and personal, private information. Public disclosure of the type of personal and private information provided would constitute a clearly unwarranted invasion of personal privacy. Therefore, FENOC requests this information be withheld from public disclosure pursuant to 10 CFR 2.390.

Redacted versions of the information is provided in the non-proprietary Enclosures A through F. The redacted information is identified by brackets [ ].

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.

Sincerely, I on sident, Regulatory Affairs and Laboratory Services

Attachment:

FirstEnergy Corp. Organizational Structure Enclosure H of this letter contains Confidential Financial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.

Confidential Financial Information, Personal Privacy Information, and Security-Related Information to be Withheld from Public Disclosure Under 10 CFR 2.390 and 10 CFR 9.17 Beaver Valley Power Station Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Unit No. 1 Perry Nuclear Power Plant Unit No. 1 L-16-092 Page 3

Enclosures:

A. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Corp.

B. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Solutions Corp.

C. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Nuclear Operating Company D. Non-Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Nuclear Generation, LLC E. Non-Proprietary Foreign Ownership Control or Influence Information for Ohio Edison Company F. Non-Proprietary Foreign Ownership Control or Influence Information for The Toledo Edison Company G. Affidavit of Gregory H. Halnon H. Proprietary Foreign Ownership Control or Influence Information for FirstEnergy Corp. and Subsidiaries cc:

NRC Regional Administrator - Region I (without Enclosure H)

NRC Regional Administrator.- Region Ill (without Enclosure H)

NRR Project Manager - Beaver Valley Power Station (without Enclosure H)

NRR Project Manager - Davis Besse Nuclear Power Station (without Enclosure H)

NRR Project Manager - Perry Nuclear Power Plant (without.Enclosure H)

NRR Project Manager - FENOC Fleet (without Enclosure H)

NRC Resident Inspector - Beaver Valley Power Station (without Enclosure H)

NRC Resident Inspector - Davis Besse Nuclear Power Station (without Enclosure H)

NRC Resident Inspector - Perry Nuclear Power Plant (without Enclosure H)

Director BRP/DEP (without Enclosure H)

Site BRP/DEP Representative (without Enclosure H)

Utility Radiological Safety Board (without Enclosure H)

Enclosure H of this letter contains Confidential Financial Information, Personal Privacy Information, and Security-Related Information.

Withhold from public disclosure under 10 CFR 2.390 and 10 CFR 9.17.

Upon removal of Enclosure H, the letter is decontrolled.