UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 3, 2016 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI POWER PLANT - INFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION
Dear Mr. Fessler:
This letter is to request information to support the Emergency Action Level and Emergency Plan change inspection that will be conducted during the third and fourth quarters of 2016. This inspection will be performed as an in-office review and in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71114.04. The list of requested documents needed from your staff for this inspection is enclosed. We are requesting that these documents are for the time period specified in the list, as applicable.
The point of contact for this request is Michelle Garza, Region III Emergency Preparedness Inspector, and can be reached at 630-829-9719. We will keep in close communications with the Emergency Preparedness staff at your site regarding this request and the inspection when performed.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
P. Fessler component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43
Enclosure:
Emergency Action Level and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV
EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION DOCUMENT REQUEST We request that all information listed below be received no later than July 15, 2016. The information is preferred electronically on a CD-ROM. Send the information requested to the U.S. Nuclear Regulatory Commission Region III office:
U.S. NRC Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Attn: Michelle Garza, DRS Documents:
- 1. Current revision of the Emergency Plan
- 2. Current Emergency Action Level (EAL) scheme
- 3. Most recent U.S. Nuclear Regulatory Commission-approved Emergency Plan and EALs
- 4. On Shift Staffing Analysis baseline
- 5. Most recent Evacuation Time Estimate
- 6. Governing site document for Title 10, Code of Federal Regulations (CFR), Part 50.54(q) evaluation process
- 7. 10 CFR 50.54(q) evaluator training program and qualification records
- 8. 10 CFR 50.54(q) evaluations for Emergency Plan and EAL changes that were completed between June 30, 2015, and June 30, 2016
- 9. For each change evaluation, the previous documents and proposed documents, and the associated 10 CFR 50.54(q) screen and evaluation (if performed)
- 10. Corrective Action Program entries related to EAL and Emergency Plan changes dated between June 30, 2015, and June 30, 2016 Enclosure
P. Fessler component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43
Enclosure:
Emergency Action Level and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML16125A445 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza:cl SOrth DATE 05/02/16 05/03/16 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 May 3, 2016 Mr. Paul Fessler Chief Nuclear Officer DTE Energy Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI POWER PLANT - INFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION
Dear Mr. Fessler:
This letter is to request information to support the Emergency Action Level and Emergency Plan change inspection that will be conducted during the third and fourth quarters of 2016. This inspection will be performed as an in-office review and in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71114.04. The list of requested documents needed from your staff for this inspection is enclosed. We are requesting that these documents are for the time period specified in the list, as applicable.
The point of contact for this request is Michelle Garza, Region III Emergency Preparedness Inspector, and can be reached at 630-829-9719. We will keep in close communications with the Emergency Preparedness staff at your site regarding this request and the inspection when performed.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
P. Fessler component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43
Enclosure:
Emergency Action Level and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV
EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION DOCUMENT REQUEST We request that all information listed below be received no later than July 15, 2016. The information is preferred electronically on a CD-ROM. Send the information requested to the U.S. Nuclear Regulatory Commission Region III office:
U.S. NRC Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Attn: Michelle Garza, DRS Documents:
- 1. Current revision of the Emergency Plan
- 2. Current Emergency Action Level (EAL) scheme
- 3. Most recent U.S. Nuclear Regulatory Commission-approved Emergency Plan and EALs
- 4. On Shift Staffing Analysis baseline
- 5. Most recent Evacuation Time Estimate
- 6. Governing site document for Title 10, Code of Federal Regulations (CFR), Part 50.54(q) evaluation process
- 7. 10 CFR 50.54(q) evaluator training program and qualification records
- 8. 10 CFR 50.54(q) evaluations for Emergency Plan and EAL changes that were completed between June 30, 2015, and June 30, 2016
- 9. For each change evaluation, the previous documents and proposed documents, and the associated 10 CFR 50.54(q) screen and evaluation (if performed)
- 10. Corrective Action Program entries related to EAL and Emergency Plan changes dated between June 30, 2015, and June 30, 2016 Enclosure
P. Fessler component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43
Enclosure:
Emergency Action Level and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMFermi2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Jim Clay Carmen Olteanu ADAMS Accession Number ML16125A445 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza:cl SOrth DATE 05/02/16 05/03/16 OFFICIAL RECORD COPY