MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5792020-08-27027 August 2020 ES-301-6 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5762020-08-27027 August 2020 ES-301-4 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5642020-08-27027 August 2020 ES-401-4 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination 2024-01-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5642020-08-27027 August 2020 ES-401-4 ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination IR 05000282/20183012018-11-30030 November 2018 Errata - Prairie Island Nuclear Generating Plant, Units 1 and 2 - NRC Initial License Examination Report 05000282/2018301 and 05000306/2018301 (DRS-R.Baker) ML22179A2542018-10-16016 October 2018 2018 Prairie Island Ile Outline Review Comments-Final ML22179A2392018-10-16016 October 2018 2018 Prairie Island Ile ES-201-1 Exam Prep Checklist 2024-01-19
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 1 Op-Test No.: 2016301 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 100%, Boron Concentration at 825 ppm, RCS temperature at 560°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218 steps, Generator Power at 580 MW.
D1 Diesel Generator is out of service. TS LCO 3.8.1 Condition B was entered with 10 days remaining. D2 Diesel Generator has been evaluated for common cause failure and has been determined to be OPERABLE. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, 22 CLW Pump, 122 CR Air Supply Fan, 122 CR Chiller & Pump, and 122 CR Clean Up Fan are PROTECTED. SP 1118 (SR 3.8.1.1) was completed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago and is due in 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
Turnover:
None.
Event Malf. Event Type* Event No. No. Description I (ATC, BOP, N44 POWER RANGE NUCLEAR INSTRUMENT FAILS LOW 1 SRO)
(LCO 3.3.1)
TS (SRO)
RWST LEVEL TRANSMITTER FAILS LOW 2 TS (SRO)
(LCO 3.3.3) 3 C (BOP, SRO) LOSS OF GAP COOLING R (ATC) 4 TURBINE MALFUNCTION REQUIRING RAPID DOWNPOWER N (SRO)
DROPPED ROD WITH REACTOR FAILING TO 5 C (ATC, SRO)
AUTOMATICALLY TRIP 6 M (ALL) SMALL BREAK LOCA (RCP TRIP CRITERIA MET) 7 C (BOP, SRO) CONTAINMENT ISOLATION FAILS TO AUTO ACTUATE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 2 Op-Test No.: 2016301 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 90%, Boron Concentration at 856 ppm, RCS temperature at 559°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 208 steps, Generator Power at 522 MW. Backup pressurizer heaters are ON. Two 40 GPM letdown orifices are in service.
13 Charging Pump is out of service. Unit 1 is at reduced power due to 15 Feedwater Heater being out of service for several days. 15 Feedwater Heater is currently in service. 12 Safety Injection Accumulator pressure is approximately 715 psig.
Turnover:
Raise 12 Safety Injection Accumulator pressure per 1C18.
When directed by the Shift Manager, perform a load increase from 90% to 95%.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) RAISE SI ACCUMULATOR PRESSURE R (ATC) 2 RAISE POWER TO 95%
N (SRO)
I (ATC, SRO) FIRST STAGE PRESSURE INSTRUMENT FAILS LOW 3
TS (SRO) (LCO 3.3.1) 4 C (ATC, SRO) LOSS OF CHARGING FLOW TO REGENERATIVE HX 5 C (BOP, SRO) FIRE PROTECTION LINE BREAK 6 M (ALL) 11 STEAM GENERATOR FAULTS TO CONTAINMENT 7 C (BOP, SRO) LOSS OF CONTAINMENT COOLING
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 3 Op-Test No.: 2016301 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 30%, Boron Concentration at 1130 ppm, RCS temperature at 550°F, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 162 steps, Generator Power at 137 MW. Backup pressurizer heaters are ON. Two 40 GPM letdown orifices are in service.
11 RHR Pump is out of service. TS LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CLW Pump are PROTECTED. 121 Instrument Air Compressor is out of service.
Turnover:
Start 12 CC Pump and place 11 CC Pump in Standby per 1C14.
When directed by the Shift Manager, perform a load increase from 30% to 40%.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) SWAP COMPONENT COOLING WATER PUMPS I (ATC, SRO) CONTROLLING PRZR PRESSURE CHANNEL FAILS LOW 2
TS (SRO) (LCO 3.3.1 AND LCO 3.3.2)
R (ATC) 3 RAISE POWER FROM 30% TO 40%
N (SRO)
C (BOP, SRO) 4 FAILURE OF BUS 15 LOAD SEQUENCER (LCO 3.8.9)
TS (SRO)
REACTOR FAILS TO AUTOMATICALLY TRIP 5 C (ATC, SRO)
ON A LOSS OF FEEDWATER 6 M (ALL) LARGE BREAK LOCA (B LOOP HOT LEG) 7 C (BOP, SRO) LOSS OF COMPONENT COOLING
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 4 Op-Test No.: 2016301 Examiners: ______________________ Operators: __________________________
Initial Conditions:
Reactor Power at 1x10-8 amps, Boron Concentration at 1332 ppm, RCS temperature at 549°F, RCS pressure at 2235 psig, Xenon free prior to startup, Bank D rods at 140 steps, Generator Power at 0 MW. Backup pressurizer heaters are ON. Two 40 GPM letdown orifices are in service.
No equipment is out of service.
Turnover:
Raise reactor power to the point of adding heat.
Secure 12 MD AFW Pump.
Event Malf. Event Type* Event No. No. Description R (ATC) 1 RAISE POWER TO THE POAH N (SRO) 2 N (BOP) SECURE 12 MD AUXILIARY FEEDWATER PUMP C (BOP, SRO) 3 LOSS OF 11 CONTAINMENT FAN COIL UNIT TS (SRO)
I (ATC, SRO) CONTROLLING PRZR PRESSURE CHANNEL FAILS HIGH 4
TS (SRO) (LCO 3.3.1 AND LCO 3.3.2) 5 M (ALL) LARGE BREAK LOCA (A LOOP COLD LEG) 6 C (ATC, SRO) SI FAILS TO AUTOMATICALLY ACTUATE FEEDWATER COMPONENTS FAIL TO AUTOMATICALLY 7 C(BOP, SRO)
ALIGN AFTER SI SIGNAL 8 M (ALL) TRANSFER ECCS TO RECIRCULATION MODE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor