ML16111A125

From kanterella
Jump to navigation Jump to search
2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-1 and Form ES-301-2
ML16111A125
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/10/2016
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Northern States Power Company, Minnesota, Xcel Energy
References
Download: ML16111A125 (5)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: _June 210, 2016 Examination Level: RO Operating Test Number: 2016301 Administrative Topic Type Describe activity to be performed (see Note) Code*

RCS / STEAM GENERATOR TEMPERATURE Conduct of Operations M, R VERIFICATION Conduct of Operations D, R TURBINE STARTUP AND LOAD TIME Equipment Control D, R REMOVE AN ANNUNCIATOR FROM SERVICE Radiation Control N/A NOT APPLICABLE DETERMINE STEAM GENERATOR TUBE LEAK Emergency Procedures/Plan M, R ACTION LEVEL NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: June 10, 2016 Examination Level: SRO Operating Test Number: 2016301 Administrative Topic Type Describe activity to be performed (see Note) Code*

Conduct of Operations P, R REVIEW CONTROL ROOM LOG VERIFY TIME TO BOILING DURING REDUCED Conduct of Operations D, R INVENTORY Equipment Control N, R PERFORM SHUTDOWN SAFETY ASSESSMENT Radiation Control D, R AUTHORIZE WASTE GAS RELEASE Emergency Procedures/Plan N, R REVIEW EMERGENCY NOTIFICATION REPORT NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: June 10, 2016 Exam Level: RO Operating Test No.: 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function

a. CVCS / CHARGING PUMP TRIP A, D, S 2
b. ECCS / ESTABLISH RHR FLOW TO THE RX VESSEL N, L, EN, S 3
c. RCS / RCP THERMAL BARRIER HX LEAK A, M, S 4P
d. MFW / FWRV CONTROL FAILURE AND ATWS A, M, S 4S
e. CCS / ALTERNATE FAN COIL UNITS N, EN, S 5
f. AC / VOLTAGE REGULATOR FAILURE A, D, S 6
g. PRM / SECURE R11/12 IN CONTROL ROOM N, S 7
h. FPS / ALIGN SCREENWASH PUMP TO FIRE HEADER N, S 8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. SWS / LOCAL START/STOP OF 22 DDCLWP A, D, E 4S
j. EDG / RESET D1 DIESEL GENERATOR 86 RELAYS L, D, E 6
k. SFPCS / STOP SPENT FUEL POOL PUMPS D, E, R 8
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: June 10, 2016 Exam Level: SRO-I Operating Test No.: 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function

a. CVCS / CHARGING PUMP TRIP A, D, S 2
b. ECCS / ESTABLISH RHR FLOW TO THE RX VESSEL N, L, EN, S 3
c. RCS / RCP THERMAL BARRIER HX LEAK A, M, S 4P
d. MFW / FWRV CONTROL FAILURE AND ATWS A, M, S 4S
e. CCS / ALTERNATE FAN COIL UNITS N, EN, S 5
f. AC / VOLTAGE REGULATOR FAILURE A, D, S 6
g. N/A
h. FPS / ALIGN SCREENWASH PUMP TO FIRE HEADER N, S 8 In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. SWS / LOCAL START/STOP OF 22 DDCLWP A, D, E 4S
j. EDG / RESET D1 DIESEL GNERATOR 86 RELAYS L, D, E 6
k. SFPCS / STOP SPENT FUEL POOL PUMPS D, E, R 8
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: __PRAIRIE ISLAND_______________________ Date of Examination: June 10, 2016 Exam Level: SRO-U Operating Test No.: 2016301 Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System / JPM Title Type Code* Safety Function

a. N/A
b. ECCS / ESTABLISH RHR FLOW TO THE RX VESSEL N, L, EN, S 3
c. RCS / RCP THERMAL BARRIER HX LEAK A, M, S 4P
d. N/A
e. N/A
f. AC / VOLTAGE REGULATOR FAILURE A, D, S 6
g. N/A
h. N/A In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. SWS / LOCAL START/STOP OF 22 DDCLWP A, D, E 4S
j. N/A
k. SFPCS / STOP SPENT FUEL POOL PUMPS (SF-1) D, E, R 8
  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / 1 (control room system)

(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator