ML16110A089
| ML16110A089 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/18/2016 |
| From: | Alan Dahbur Engineering Branch 3 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2016008 | |
| Download: ML16110A089 (7) | |
See also: IR 05000254/2016008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
April 18, 2016
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - INFORMATION
REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND
10 CFR 50.59 BASELINE INSPECTION 05000254/2016008; 05000265/2016008
Dear Mr. Hanson:
On August 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Permanent Modifications and Title 10, Code of Federal Regulations (CFR), Part 50.59 Baseline
Inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection will be
performed in accordance with the NRC Baseline Inspection Procedure 71111.17T. The onsite
portion of the inspection will take place on August 8 - 12, 2016, and August 22 - 26, 2016.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
the site, and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups.
The first group of information is necessary to ensure that the inspection team is
adequately prepared for the inspection. This information should be made available
via compact disc and delivered to the regional office no later than June 3, 2016. The
inspection team will review this information and, by June 24, 2016, will request specific
items that should be provided for review in the regional office by July 22, 2016.
The second group of requested documents contains additional items that the team will
review, or need access to, during the inspection. Certain documents contained within
Group II (i.e., Item [1]), will be requested for review in the regional office prior to the
inspection by July 22, 2016, as identified above. The remaining documents should be
available by the first day of the onsite inspection, August 8, 2016.
The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to
the lead inspector as the information is generated during the inspection. It is important
that all of these documents are up-to-date and complete in order to minimize the number
of additional documents requested during the preparation and/or the onsite portions of
the inspection.
B. Hanson
-2-
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
contact for this inspection is Mr. T. Petersen of your organization. If there are any questions
about the inspection or the material requested, please contact the lead inspector at
630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Alan Dahbur, Senior Reactor Inspector
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-254; 50-265;72-053
Enclosure:
Request for Information - MOD/50.59 Inspection
cc: Distribution via LISTSERV
REQUEST FOR INFORMATION - MOD/50.59 INSPECTION
Enclosure
Inspection Report: 05000254/2016008; 05000265/2016008
Inspection Dates:
August 8 - 12, 2016
August 22 - 26, 2016
Inspection Procedure:
Inspection Procedure 71111.17T, Evaluations of Changes, Tests,
and Experiments and Permanent Plant Modifications
Lead Inspector:
630-829-9810
Alan.Dahbur@nrc.gov
I.
Information Requested for In-Office Preparation Week
The following information is requested by June 3, 2016, or sooner, to facilitate
the selection of specific items that will be reviewed during the onsite inspection week.
The inspection team will select specific items from the information requested below,
and submit a list to your staff by June 24, 2016. We will request that certain items
be made available to the regional office prior to the inspection by July 22, 2016. We
request that the remaining items selected from the lists be available and ready for review
on the first day of inspection. All requested information should identify the associated
system and cover the time frame from the receipt of information for the last MOD/50.59
inspection January 17, 2013, to the present.
The required information identified below should be provided on compact disc (CD).
Please provide three copies of each CD submitted (i.e., one for each inspector).
The preferred file format is a searchable pdf file. The CDs should be indexed and
hyper-linked to facilitate ease of use, if possible. If you have any questions regarding
this information, please call the inspection team leader as soon as possible.
1. List of permanent plant modifications to systems, structures or components
that are field work complete. (For the purpose of this inspection, permanent plant
modifications include permanent: plant changes, design changes, set point changes,
equivalency evaluations, suitability analyses, and commercial grade dedications.)
The list should contain the number of each document, the title, the revision (or date),
and the affected system. In addition to the list, please provide a description of each
modification and a list of associated calculations and affected procedures.
2. List of all Title 10, Code of Federal Regulations (CFR), Part 50.59 completed
evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the
facility (modifications); (d) non-routine operating configurations; or (e) departures in
methods of analyses. This list should include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that have
been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59
inspection;
REQUEST FOR INFORMATION - MOD/50.59 INSPECTION
2
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been issued.
The list should contain the number and title of each document, a brief description
of the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies). The list
should NOT include any evaluations in which prior U.S. Nuclear Regulatory
Commission approval was sought and obtained.
3. A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full
evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the
facility (modifications); (d) non-routine operating configurations; or (e) departures in
methods of analyses.
The list should contain the number and title of each document, a brief description of
the change, and the corresponding number and type of the affected document
(i.e., the modification or procedure to which the evaluation applies).
4. A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.
5. A list of calculation changes that have been issued for use.
6. A list of corrective action documents (open and closed) that address permanent plant
modifications or 10 CFR 50.59 issues, concerns, or processes. These documents
should also include the corrective action documents associated with the modification
and the 50.59 change implementation.
The list should contain the number, title and revision (or date) of each document, the
affected system and corresponding documentation (if applicable), and should be
sorted in order of significance.
7. Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,
and UFSAR updates.
8. UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies
of the complete submittal.
9. Copy of the UFSAR change log or a synopsis of the changes. This should include all
of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
10. Electronic copy of the UFSAR and Technical Specifications, if available.
11. Name(s) and phone number(s) for the regulatory and technical contacts.
12. Current management and engineering organizational chart.
REQUEST FOR INFORMATION - MOD/50.59 INSPECTION
3
II.
Information Requested to be Available Prior to Inspection. Requests will be Made
for Specific Item (1) Documents by June 24, 2016, for Availability of Requested
Item (1) Documents in Regional Office by July 22, 2016, and Items (2), (3), and (4)
Documents on First Day of Inspection (August 8, 2016)
1. Copies of all selected items from Section I. This includes copies of
associated documents such as calculations, post-modification test packages,
10 CFR 50.59 evaluations or screenings, and any corrective action documents.
2. Copies of these documents do not need to be solely available to the inspection team
as long as the inspectors have easy and unrestrained access to them.
a. UFSAR, if not previously provided;
b. Original Final Safety Analysis Report Volumes;
c. Original Safety Evaluation Reports and Supplements;
d. Final Safety Analysis Report Question and Answers;
e. Quality Assurance (QA) Plan;
f. Technical Specifications, if not previously provided;
g. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
h. Vendor Manuals; and
i.
The latest 10 CFR 50.59 UFSAR Update Submittal.
3. Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting
these documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
4. Assessment and Corrective Actions:
a. The most recent MOD/50.59 QA audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent MOD/50.59
QA audit and/or self-assessment.
REQUEST FOR INFORMATION - MOD/50.59 INSPECTION
4
III.
Information Requested to be provided throughout the inspection
1. Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provide daily during the inspection
to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
B. Hanson
-2-
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
contact for this inspection is Mr. T. Petersen of your organization. If there are any questions
about the inspection or the material requested, please contact the lead inspector at
630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
/RA/
Alan Dahbur, Senior Reactor Inspector
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-254; 50-265;72-053
Enclosure:
Request for Information - MOD/50.59 Inspection
cc: Distribution via LISTSERV
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMQuadCities Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML16110A089
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
RIII
RIII
RIII
NAME
ADahbur:cl
DATE
04/18/16
OFFICIAL RECORD COPY