Transmittal of Response to RAI Letter Number 6 Related to Chapter 9 for GE-Hitachi Nuclear Energy Advanced Boiling-Water Reactor Design Certification Rule Renewal Application - Supplement 1 of Revision 1 to GEH Response to RAI 09.05.01-1
ML16102A345
Person / Time
Site: 05200045
Issue date: 04/11/2016
From: Head J
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of New Reactors
Shared Package
ML16102A344 List:
References
MFN 15-064, Rev 1, Supplment 1
Download: ML16102A345 (2)


Text

GE Hitachi Nuclear Energy Jerald G. Head Senior Vice President, Regulatory Affairs 3901 Castle Hayne Road PO Box 780 M/C A-18 Wilmington, NC 28402-0780 USA T 910 819 5692 F 910 362 5692 jerald.head@ge.com MFN 15-064, Revision 1, Supplement 1 Docket number: 52-045 April 11, 2016 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Request for Additional Information (RAI) Letter Number 6 Related to Chapter 9 for GE-Hitachi Nuclear Energy Advanced Boiling-Water Reactor Design Certification Rule Renewal Application - Supplement 1 of Revision 1 to GEH Response to RAI 09.05.01-1

References:

1. Letter from USNRC to Jerald G. Head, GEH,

Subject:

Request for Additional Information Letter Number 6 Related to Chapter 9 for GE-Hitachi Nuclear Energy Advanced Boiling-Water Reactor Design Certification Rule Renewal Application, April 29, 2015

2. Letter from Jerald G. Head, GEH, to USNRC,

Subject:

Request for Additional Information Letter Number 6 Related to Chapter 9 for GE-Hitachi Nuclear Energy Advanced Boiling-Water Reactor Design Certification Rule Renewal Application - GEH Response to RAI 09.05.01-1, July 30, 2015

3. Letter from Jerald G. Head, GEH, to USNRC,

Subject:

Request for Additional Information Letter Number 6 Related to Chapter 9 for GE-Hitachi Nuclear Energy Advanced Boiling-Water Reactor Design Certification Rule Renewal Application -

Revision 1 to GEH Response to RAI 09.05.01-1, October 30, 2015 In regard to the Requests for Additional Information (RAI) transmitted in your April 29, 2015 letter, Reference 1, GEH initially responded to RAI 09.05.01-1 in Reference 2. After internal review by GEH Engineering, it was determined that clarification to our response in Reference 2 was required to eliminate any possible misconception concerning the level of analysis that GEH Engineering performed to address RAI 09.05.01-1. Reference 3 transmitted the revised response.

MFN 15-064, Revision 1, Supplement 1 Page 2 of 2 In a teleconference held between the US NRC Staff and GEH on January 19, 2016 GEHs response to RAI 09.05.01-1 was discussed. As part of this call, the Staff requested supplemental information for GEHs response to RAI 09.05.01-1 in Reference 3. of this letter contains GEHs complete response to RAI 09.05.01-1, including the supplemental information requested, while Enclosure 2 contains the Design Control Document Revision 6 markups associated with GEHs supplemental response.

If you have any questions concerning this letter, please contact Hugh Upton at 408-314-8499.

I declare under penalty of perjury that the foregoing information is true and correct to the best of my knowledge, information, and belief.

Sincerely, Jerald G. Head Senior Vice President, Regulatory Affairs Commitments: No additional commitments are made in this response.

Enclosures:

1. GEHs Revised Response and Supplemental Information to RAI 09.05.01-1
2. GEHs Supplemental Response to RAI 09.05.01 ABWR DCD Revision 6 Markups cc: Adrian Muniz, NRC David Sledzik, GEH Peter Yandow, GEH Patricia Campbell, GEH Doug McDonald, GEH Hugh A. Upton, GEH James A. Beard, GEH Erik Kirstein, GEH DBR - 0012107