Do~irtion Resources Services, Inc.
Innsbrook Technical Center Safeguards Information 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060.
Attention: Document Control Desk Director, Division of Security Policy, April 4, 2016 Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission.
One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 DOMINION NUCLEAR CONNECTICUT, INC.
VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1, 2, AND 3.
NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 AND ASSOCIATED ISFSls SUBMITTAL OF SECURITY PLAN, TRAINING 10 CFR 50.54 10 CFR 72.186 Serial No.:
16-114 NL&OS/MLW: R1 Docket Nos.:
50-245/336/423 50-338/339 50-280/281 72-2/16/4 7 /55/56 License Nos:: DPR-21/65 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSll SECURITY PROGRAM - REVISION 22 Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b), Revision 22 of the Millstone, North Anna and Surry Power Stations' Security Plan,* Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program is provided as Enclosure 1. This revision includes changes to the Millstone Power Station (MPS) active vehicle barrier system (AVBS). This plan became effective March 14, 2016. The changes that were made to the plan did not d~crease the safeguards effectiveness of the plan. contains Safeguards Information as defined by 1 O CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact Michael Whitlock at 804-273-3123.
Sincerely, o~~~
Daniel G. Stoddard Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: March 14 2016 Senior Vice.President - Nuclear Operations *..-------------------...
Dominion Nuclear Connecticut, Inc:
Virginia Electric and Power Company Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions
, NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION"
- AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information Serial No.16-114 Sec. Plan Submittal Rev. 22 Page 2_of 3
. Enclosure 1: Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingenqy Plan, and ISFSl Security Program, Revision 22 (SGI)
Commitments made by this letter: None cc:
U. S. Nuclear* Regulatory Commission, Region I Attn.: *Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, Penns.ylvania 19406-2713 U.S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission
- One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 J.M. Goshen (Without Enclosure)
NRC Project Manager U.S. Nuclear Regulatory Commission.
One White Flint North Marl Stop EBS-E3 02M 11555 Rockville Pike Rockville, MD 20852-2738 J. N. Nguyen (Without Enclosure)
Senior Project Manager U.S. Nuclear Regul~tory Commission Two White Flint North MailStop T4B34 11545 Rockville Pike Rockville, MD 20852 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENC,LOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information T. H. Carter (Without Enclosure)
NRC Senior Project Manager Millstone Unit 1 & Kewaunee Two White Flint North Mail Stop T-8 F5 11545 Rockviile Pike Rockville, MD 20852.:.2738 R. V. Guzman (Without Enclosure)
NRC Senior Proje~t Manager Millstone Units 2 & 3 U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852... 2738 K. R. Cotton Gross (Without Enclosure)
NRC Project Manager Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas (Without Enclosure)
NRC Project Manager North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman (Without Enclosure)
NRC Inspector 2100 Renaissance.Blvd.
Suite 100 King of Prussia, PA.19406-:,2713 NRC Senior Resident Inspector (Without Enclosure)
Millstone Power Station NRC Senior Resident Inspector (Without Enclosure)-
North Anna Power Station NRC Senior Resident lm;pector (Without Enclosure)
Surry Power Station Serial No.16-114 Sec. Plan Submittal Rev. 22
- Page 3 of 3 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information Serial No.16-114 ENCLOSURE 1 Millstone, North Anna and Surry Power Stations' Security Plan, Training and Q~alification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 22 Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: March 14 2016 Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS PAGE IS "DECONTROLLED."
- Safeguards Information
Do~irtion Resources Services, Inc.
Innsbrook Technical Center Safeguards Information 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060.
Attention: Document Control Desk Director, Division of Security Policy, April 4, 2016 Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission.
One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 DOMINION NUCLEAR CONNECTICUT, INC.
VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1, 2, AND 3.
NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 AND ASSOCIATED ISFSls SUBMITTAL OF SECURITY PLAN, TRAINING 10 CFR 50.54 10 CFR 72.186 Serial No.:
16-114 NL&OS/MLW: R1 Docket Nos.:
50-245/336/423 50-338/339 50-280/281 72-2/16/4 7 /55/56 License Nos:: DPR-21/65 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSll SECURITY PROGRAM - REVISION 22 Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b), Revision 22 of the Millstone, North Anna and Surry Power Stations' Security Plan,* Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program is provided as Enclosure 1. This revision includes changes to the Millstone Power Station (MPS) active vehicle barrier system (AVBS). This plan became effective March 14, 2016. The changes that were made to the plan did not d~crease the safeguards effectiveness of the plan. contains Safeguards Information as defined by 1 O CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact Michael Whitlock at 804-273-3123.
Sincerely, o~~~
Daniel G. Stoddard Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: March 14 2016 Senior Vice.President - Nuclear Operations *..-------------------...
Dominion Nuclear Connecticut, Inc:
Virginia Electric and Power Company Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions
, NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION"
- AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information Serial No.16-114 Sec. Plan Submittal Rev. 22 Page 2_of 3
. Enclosure 1: Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingenqy Plan, and ISFSl Security Program, Revision 22 (SGI)
Commitments made by this letter: None cc:
U. S. Nuclear* Regulatory Commission, Region I Attn.: *Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, Penns.ylvania 19406-2713 U.S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission
- One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 J.M. Goshen (Without Enclosure)
NRC Project Manager U.S. Nuclear Regulatory Commission.
One White Flint North Marl Stop EBS-E3 02M 11555 Rockville Pike Rockville, MD 20852-2738 J. N. Nguyen (Without Enclosure)
Senior Project Manager U.S. Nuclear Regul~tory Commission Two White Flint North MailStop T4B34 11545 Rockville Pike Rockville, MD 20852 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENC,LOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information T. H. Carter (Without Enclosure)
NRC Senior Project Manager Millstone Unit 1 & Kewaunee Two White Flint North Mail Stop T-8 F5 11545 Rockviile Pike Rockville, MD 20852.:.2738 R. V. Guzman (Without Enclosure)
NRC Senior Proje~t Manager Millstone Units 2 & 3 U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852... 2738 K. R. Cotton Gross (Without Enclosure)
NRC Project Manager Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas (Without Enclosure)
NRC Project Manager North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman (Without Enclosure)
NRC Inspector 2100 Renaissance.Blvd.
Suite 100 King of Prussia, PA.19406-:,2713 NRC Senior Resident Inspector (Without Enclosure)
Millstone Power Station NRC Senior Resident Inspector (Without Enclosure)-
North Anna Power Station NRC Senior Resident lm;pector (Without Enclosure)
Surry Power Station Serial No.16-114 Sec. Plan Submittal Rev. 22
- Page 3 of 3 NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Safeguards Information Serial No.16-114 ENCLOSURE 1 Millstone, North Anna and Surry Power Stations' Security Plan, Training and Q~alification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 22 Classified By:
Name: Roger Minner
Title:
COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: March 14 2016 Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company NOTE: THE ENCLOSURE TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS PAGE IS "DECONTROLLED."