MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22042, 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 72022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic 2024-04-12
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARL-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-098, And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 And Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-005, Response to Request for Additional Information for Seabrook Relief Request 4RA-22-0012023-01-26026 January 2023 Response to Request for Additional Information for Seabrook Relief Request 4RA-22-001 ML22307A1682022-11-0303 November 2022 Cover Memo and Response to C-10 Questions Regarding 2Q2022 Inspection Report - Corrected L-2022-157, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report2022-09-28028 September 2022 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report L-2022-106, Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-06-27027 June 2022 Revised Response to Request for Additional Information (RAI) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements ML22109A0342022-04-19019 April 2022 Cover Memo and Response to C-10 Questions Regarding 4Q2021 Inspection Report SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements ML21280A2622021-10-0707 October 2021 Response Letter to N. Treat (C-10 Research and Education Foundation) Regarding 2Q 2021 Integrated Inspection Report Questions SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20057, Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request2020-05-20020 May 2020 Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request SBK-L-19120, Response to Request for Additional Information Related to Seabrook Inverter Amendment2019-10-30030 October 2019 Response to Request for Additional Information Related to Seabrook Inverter Amendment SBK-L-18106, Response to Requests for Additional Information Related to License Renewal Application Environmental Review2018-06-14014 June 2018 Response to Requests for Additional Information Related to License Renewal Application Environmental Review SBK-L-18074, Response to Request for Additional Information Regarding License Amendment Request 16-032018-06-0707 June 2018 Response to Request for Additional Information Regarding License Amendment Request 16-03 L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations2018-04-0303 April 2018 Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations SBK-L-18028, 0 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - ASME Section XI, Subsection Iwl Program2018-02-28028 February 2018 0 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - ASME Section XI, Subsection Iwl Program SBK-L-18027, Supplement 59 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - 10 CFR 50 Appendix J Program2018-02-28028 February 2018 Supplement 59 - Response to Final Requests for Additional Information for the Safety Review of the Seabrook Station License Renewal Application - 10 CFR 50 Appendix J Program SBK-L-17202, Response to Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption2017-12-14014 December 2017 Response to Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption SBK-L-17204, Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007)2017-12-11011 December 2017 Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) SBK-L-17180, Supplement 58, Revised Alkali-Silica Reaction Aging Management Program2017-11-0303 November 2017 Supplement 58, Revised Alkali-Silica Reaction Aging Management Program SBK-L-17169, Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-171552017-10-17017 October 2017 Supplement 58 - Non-Proprietary Enclosure 1 to SBK-L-17155 SBK-L-17170, Non-Proprietary Enclosure 1 to SBK-L-171562017-10-17017 October 2017 Non-Proprietary Enclosure 1 to SBK-L-17156 SBK-L-17156, Response to Request for Additional Information Regarding License Amendment Request 16-03 Related to Alkali-Silica Reaction2017-10-0303 October 2017 Response to Request for Additional Information Regarding License Amendment Request 16-03 Related to Alkali-Silica Reaction SBK-L-17155, Supplement 58 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction2017-10-0303 October 2017 Supplement 58 - Response to Request for Additional Information for the Review of the License Renewal Application - Building Deformation Analyses Related to Concrete Alkali-Silica Reaction SBK-L-17133, Clarification to Supplement 55 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - Bolting Integrity Program2017-08-11011 August 2017 Clarification to Supplement 55 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - Bolting Integrity Program SBK-L-17103, Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program2017-06-20020 June 2017 Supplement 55 - Response to Request for Additional Information for the Review of the License Renewal Application - Bolting Integrity Program SBK-L-17087, Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components2017-05-25025 May 2017 Supplement 53 - Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 - Changes to Aging Management Guidance for Various Steam Generator Components SBK-L-17082, Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 -Changes to Aging Management Guidance for Various Steam Generator Components2017-05-19019 May 2017 Response to Request for Additional Information for the Review of the Seabrook Station License Renewal Application - LR-ISG-2016-01 -Changes to Aging Management Guidance for Various Steam Generator Components SBK-L-17063, Response to Request for Additional Information Regarding License Amendment Request 17-01 One-Time Exigent Change to the Seabrook Licensing Basis Regarding Service Water Cooling Tower Functionality2017-04-0808 April 2017 Response to Request for Additional Information Regarding License Amendment Request 17-01 One-Time Exigent Change to the Seabrook Licensing Basis Regarding Service Water Cooling Tower Functionality SBK-L-16205, Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency and EMCB-RAI-22016-12-30030 December 2016 Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency and EMCB-RAI-2 SBK-L-16196, Response to Request for Supplemental Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive...2016-12-15015 December 2016 Response to Request for Supplemental Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive... SBK-L-16186, Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations2016-11-23023 November 2016 Supplement 50, Response to Request for Additional Information for the Review of License Renewal Application Providing Changes to Buried and Underground Piping and Tank Recommendations SBK-L-16190, Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency2016-11-17017 November 2016 Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency ML16314D4272016-11-0707 November 2016 Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.1, Flooding - Submittal of Flooding Hazards Reevaluation Report, Revision 1 L-2016-188, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)2016-11-0303 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) SBK-L-16162, Response to Request for Additional Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2016-10-27027 October 2016 Response to Request for Additional Information Regarding License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors SBK-L-16170, Response to Request for Additional Information for the 04/22/2016 Steam Generator Tube Inspection Report2016-10-27027 October 2016 Response to Request for Additional Information for the 04/22/2016 Steam Generator Tube Inspection Report SBK-L-16165, Response to RAI Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency2016-10-27027 October 2016 Response to RAI Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency SBK-L-16156, Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations2016-10-0707 October 2016 Response to Issuance of LR-ISG-2015-01 Changes to Buried and Underground Piping and Tank Recommendations SBK-L-16134, Response to RAI Related to Severe Accident Mitigation Alternatives License Renewal Application2016-09-0606 September 2016 Response to RAI Related to Severe Accident Mitigation Alternatives License Renewal Application 2024-09-16
[Table view] |
Text
,,
N XTera ENERGY.~
SEABROOK March 28, 2016 SBK-L-16044 Docket No. 50-443 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to Request for Information Regarding the Seabrook Flooding Hazards Reevaluation Report
References:
- 1. NextEra Energy Seabrook Letter SBK-L-15181 to the U.S. Nuclear Regulatory Commission, "Response to NRC 10CFR50.54(f) Request for Information Regarding Near-Term Force Recommendation 2.1-Flooding- Submittal of Flooding Hazards Reevaluation Report," September 25, 2015 (ML15274A210)
- 2. NRC Letter, "Nuclear Regulatory Commission Plan for the Audit ofNextEra Energy Seabrook, LLC's Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Seabrook Station Unit 1," October 21, 2015 (ML15292A259)
- 3. NRC email from Anthony Minarik to Victoria Brown, "Seabrook Information Needs,"
March 17, 2016 Reference 1 provided the Flooding Hazards Reevaluation Report (FHRR) for NextEra Energy Seabrook, LLC. Reference 2 notified NextEra Energy Seabrook oftheypcciming audit activities pertaining to NextEra Energy Seabrook's FHRR. In Reference 3, the NRC requested that Seabrook provide additional information related to the Seabrook FHRR review. The NRC requested that Information Needs 1, 2 and 5 be responded to in a docketed response. The enclosure to this letter provides the responses to items 1, 2 and 5.
Information Need number 1 requested higher resolution images ofFHRR figures be provided on DVD. The requested figures are within the DVD accompanying this letter. A copy of the DVD was also provided to the Seabrook Project Manager NRR/JLD/JHMB.
This letter makes no new commitments or changes to any existing commitments.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK.:L-16044/Page 2 If you have any questions or require additional information, please contact me at (603) 773-7512.
Sincerely, Mich el Ossing Licensing Manager Enclosure cc: D. Dorman, NRC Region I Administrator, w/o DVD J.G. Lamb, NRC Project Manager, Project Directorate 1-2, w/o DVD P. Cataldo, NRC Senior Resident Inspector, w/o, DVD A. Minarik, Seabrook Project Manager NRR/JLD/JHMB, w/DVD
Enclosure to SBK-L-16044 Response to Request for Information Regarding the Seabrook Flooding Hazards Reevaluation Report
Information Need# 1: Figures
Background:
Figures contained in the FHRR lack visual clarity.
Requests: Provide (on the docket) standalone, high quality versions of the following figures for use in the NRC Staff Assessment:
a) FHRR Figure 4-8, Seabrook Manning's - n b) FHRR Figure 4-12, Maximum Flow Depths: East c) FHRR Figure 4-13, Maximum WSEL, East d) FHRR Figure 4-14, Maximum Flow Depths: West e) FHRRFigure 4-15, Maximum WSEL, West f) FHRR Figure 4-21, Example ofDifference Time-Distributed Hyetographs g) Figure 5-1 in Section 5.1 of Calculation No. FPL-081-CALC-012
Response
Electronic files for the requested figures are provided within the DVD accompanying this letter.
Information Need #2: All Flood Causing Mechanisms- Comparison of Reevaluated Flood Hazard with Current Design Basis
Background:
Recommendation 2.1 of the 50.54(£) letter provides instructions for the Flood Hazard Reevaluation Report (FHRR). Under Section 1, Hazard Reevaluation Report, Items c and d, licensees are requested to perform:
c) Comparison of current and reevaluated flood causing mechanisms at the site. Provide an assessment of the current design basis flood elevation to the reevaluated flood elevation for each flood causing mechanism. Include how the findings from Enclosure 4 of this letter (i.e.,
Recommendation 2.3 flooding walkdowns) support this determination. If the current design basis flood bounds the reevaluated hazard for all flood causing mechanisms, include how this finding was determined.
d) Interim evaluation and actions taken or planned to address any higher flooding hazards relative to the design basis, prior to completion of the integrated assessment described below, if necessary.
Section 3.0 of the Seabrook FHRR provides a description of the current licensing basis (CLB) for each flood hazard. The FHRR then provides comparisons of the reevaluated flood hazards with the CLB for each flood hazard mechanism.
Request: Clarify and, where necessary, correct the description and/or comparison of the reevaluated flood hazard to the current design basis (CDB).
Response
The current licensing basis (CLB) flooding information used for comparison in Section 5 is consistent with the current design basis (CDB) for flooding at Seabrook. The comparisons in Section 5 are not affected by the change in terminology and remain valid for a comparison of the FHRR to the CDB.
1
Information Need #5: Hazard Input to the Integrated Assessment- Flood Event Duration Parameters
Background:
The "Mitigating Strategies and Flooding Hazard Reevaluation Action Plan" (COMSECY-15-0019) requests the licensee to perform an additional assessment(s) of the plant's response to the reevaluated hazard if the reevaluated flood hazard is not bounded by the current design basis. Flood scenario parameters from the flood hazard reevaluation serve as the input to the focused evaluation and additional assessment. To support efficient and effective evaluations, staff will review flood scenario parameters as part of the flood hazard reevaluation and document results of the review as part of the staff assessment of the flood hazard reevaluation. While the FHRR does provide a partial set of flood duration parameters for LIP in FHRR Table 4-3 and for PMF in FHRR Table 4-21, some parameters (e.g., warning time and the period of site preparation) were not evaluated. The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the Mitigating Strategies Assessment consistent with the guidance, but may have some of that information available for evaluation at this time.
Request: lfNextEra seeks to have this information reviewed as part of the FHRR review for Seabrook and then referenced during the review of the Mitigating Strategies Assessment, provide the applicable flood event duration parameters (see definition and Figure 6 of the Guidance for Performing an Integrated Assessment, JLD-ISG-2012-05) associated with mechanisms that trigger an additional assessment using the results of the flood hazard reevaluation. This includes (as applicable) the warning time the site will have to prepare for the event (e.g., the time between notification of an impending flood event and arrival of floodwaters on site) and the period of time the site is inundated for the mechanisms that are not bounded by the current design basis. In addition, provide the basis or source of information for the flood event duration, which may include a description of relevant forecasting methods (e.g., products from local, regional, or national weather forecasting centers) and/or timing information derived from the hazard analysis. If the staff does not receive this information as part of the FHRR review, it should be expected to be submitted as part of the Mitigating Strategies Assessment and fully reviewed at that time in its entirety.
Response
The riverine and dam break flooding mechanisms do not result in site flooding, so event duration and warning time are not needed for these flooding mechanisms. The LIP event does result in site flooding, and duration and warning time will be addressed in the Mitigating Strategies Assessment.
2
N XTera ENERGY.~
SEABROOK March 28, 2016 SBK-L-16044 Docket No. 50-443 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Response to Request for Information Regarding the Seabrook Flooding Hazards Reevaluation Report
References:
- 1. NextEra Energy Seabrook Letter SBK-L-15181 to the U.S. Nuclear Regulatory Commission, "Response to NRC 10CFR50.54(f) Request for Information Regarding Near-Term Force Recommendation 2.1-Flooding- Submittal of Flooding Hazards Reevaluation Report," September 25, 2015 (ML15274A210)
- 2. NRC Letter, "Nuclear Regulatory Commission Plan for the Audit ofNextEra Energy Seabrook, LLC's Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Seabrook Station Unit 1," October 21, 2015 (ML15292A259)
- 3. NRC email from Anthony Minarik to Victoria Brown, "Seabrook Information Needs,"
March 17, 2016 Reference 1 provided the Flooding Hazards Reevaluation Report (FHRR) for NextEra Energy Seabrook, LLC. Reference 2 notified NextEra Energy Seabrook oftheypcciming audit activities pertaining to NextEra Energy Seabrook's FHRR. In Reference 3, the NRC requested that Seabrook provide additional information related to the Seabrook FHRR review. The NRC requested that Information Needs 1, 2 and 5 be responded to in a docketed response. The enclosure to this letter provides the responses to items 1, 2 and 5.
Information Need number 1 requested higher resolution images ofFHRR figures be provided on DVD. The requested figures are within the DVD accompanying this letter. A copy of the DVD was also provided to the Seabrook Project Manager NRR/JLD/JHMB.
This letter makes no new commitments or changes to any existing commitments.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK.:L-16044/Page 2 If you have any questions or require additional information, please contact me at (603) 773-7512.
Sincerely, Mich el Ossing Licensing Manager Enclosure cc: D. Dorman, NRC Region I Administrator, w/o DVD J.G. Lamb, NRC Project Manager, Project Directorate 1-2, w/o DVD P. Cataldo, NRC Senior Resident Inspector, w/o, DVD A. Minarik, Seabrook Project Manager NRR/JLD/JHMB, w/DVD
Enclosure to SBK-L-16044 Response to Request for Information Regarding the Seabrook Flooding Hazards Reevaluation Report
Information Need# 1: Figures
Background:
Figures contained in the FHRR lack visual clarity.
Requests: Provide (on the docket) standalone, high quality versions of the following figures for use in the NRC Staff Assessment:
a) FHRR Figure 4-8, Seabrook Manning's - n b) FHRR Figure 4-12, Maximum Flow Depths: East c) FHRR Figure 4-13, Maximum WSEL, East d) FHRR Figure 4-14, Maximum Flow Depths: West e) FHRRFigure 4-15, Maximum WSEL, West f) FHRR Figure 4-21, Example ofDifference Time-Distributed Hyetographs g) Figure 5-1 in Section 5.1 of Calculation No. FPL-081-CALC-012
Response
Electronic files for the requested figures are provided within the DVD accompanying this letter.
Information Need #2: All Flood Causing Mechanisms- Comparison of Reevaluated Flood Hazard with Current Design Basis
Background:
Recommendation 2.1 of the 50.54(£) letter provides instructions for the Flood Hazard Reevaluation Report (FHRR). Under Section 1, Hazard Reevaluation Report, Items c and d, licensees are requested to perform:
c) Comparison of current and reevaluated flood causing mechanisms at the site. Provide an assessment of the current design basis flood elevation to the reevaluated flood elevation for each flood causing mechanism. Include how the findings from Enclosure 4 of this letter (i.e.,
Recommendation 2.3 flooding walkdowns) support this determination. If the current design basis flood bounds the reevaluated hazard for all flood causing mechanisms, include how this finding was determined.
d) Interim evaluation and actions taken or planned to address any higher flooding hazards relative to the design basis, prior to completion of the integrated assessment described below, if necessary.
Section 3.0 of the Seabrook FHRR provides a description of the current licensing basis (CLB) for each flood hazard. The FHRR then provides comparisons of the reevaluated flood hazards with the CLB for each flood hazard mechanism.
Request: Clarify and, where necessary, correct the description and/or comparison of the reevaluated flood hazard to the current design basis (CDB).
Response
The current licensing basis (CLB) flooding information used for comparison in Section 5 is consistent with the current design basis (CDB) for flooding at Seabrook. The comparisons in Section 5 are not affected by the change in terminology and remain valid for a comparison of the FHRR to the CDB.
1
Information Need #5: Hazard Input to the Integrated Assessment- Flood Event Duration Parameters
Background:
The "Mitigating Strategies and Flooding Hazard Reevaluation Action Plan" (COMSECY-15-0019) requests the licensee to perform an additional assessment(s) of the plant's response to the reevaluated hazard if the reevaluated flood hazard is not bounded by the current design basis. Flood scenario parameters from the flood hazard reevaluation serve as the input to the focused evaluation and additional assessment. To support efficient and effective evaluations, staff will review flood scenario parameters as part of the flood hazard reevaluation and document results of the review as part of the staff assessment of the flood hazard reevaluation. While the FHRR does provide a partial set of flood duration parameters for LIP in FHRR Table 4-3 and for PMF in FHRR Table 4-21, some parameters (e.g., warning time and the period of site preparation) were not evaluated. The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the Mitigating Strategies Assessment consistent with the guidance, but may have some of that information available for evaluation at this time.
Request: lfNextEra seeks to have this information reviewed as part of the FHRR review for Seabrook and then referenced during the review of the Mitigating Strategies Assessment, provide the applicable flood event duration parameters (see definition and Figure 6 of the Guidance for Performing an Integrated Assessment, JLD-ISG-2012-05) associated with mechanisms that trigger an additional assessment using the results of the flood hazard reevaluation. This includes (as applicable) the warning time the site will have to prepare for the event (e.g., the time between notification of an impending flood event and arrival of floodwaters on site) and the period of time the site is inundated for the mechanisms that are not bounded by the current design basis. In addition, provide the basis or source of information for the flood event duration, which may include a description of relevant forecasting methods (e.g., products from local, regional, or national weather forecasting centers) and/or timing information derived from the hazard analysis. If the staff does not receive this information as part of the FHRR review, it should be expected to be submitted as part of the Mitigating Strategies Assessment and fully reviewed at that time in its entirety.
Response
The riverine and dam break flooding mechanisms do not result in site flooding, so event duration and warning time are not needed for these flooding mechanisms. The LIP event does result in site flooding, and duration and warning time will be addressed in the Mitigating Strategies Assessment.
2