CNL-16-063, Proposed Technical Specification Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 10, Response to Request for Additional Information

From kanterella
(Redirected from ML16096A411)
Jump to navigation Jump to search
Proposed Technical Specification Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplement 10, Response to Request for Additional Information
ML16096A411
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/05/2016
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-16-063
Download: ML16096A411 (6)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-16-063 April 5, 2016 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 10, Response to Request for Additional Information

References:

1. Letter from TVA to NRC, CNL-15-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU), dated September 21, 2015 (ML15282A152)
2. Letter from NRC to TVA, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos.

MF6741, MF6742, and MF6743), dated March 25, 2016 (ML16084A320)

By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts. During their technical review of the LAR, the Nuclear Regulatory Commission (NRC) identified the need for additional information. The Reference 2 letter provided an NRC Request for Additional Information (RAI) related to instrumentation and controls. The due date for the response to the NRC RAI provided by the Reference 2 letter is incorrectly stated as April 4, 2016. This due date was subsequently corrected by the NRC.

U.S. Nuclear Regulatory Commission CNL-16-063 Page 2 April 5, 2016 The corrected due date is April 8, 2016. The enclosure to this letter provides the response to the RAI included in the Reference 2 letter.

TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.

Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter to the Alabama State Department of Public Health.

There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Edward D. Schrull at (423) 751-3850.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 5th day of April 2016.

Respectfully, J. W. Shea Vice President, Nuclear Licensing

Enclosure:

Response to NRC Request for Additional Information EICB-RAI 1 cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US Date: 2016.04.05 16:02:33 -04'00'

ENCLOSURE Response to NRC Request for Additional Information EICB-RAI 1

E-1 EICB RAI 1 In Section 2.4.1.3.3, "APRM [Average Power Range Monitors] Flow Biased Simulated Thermal Power - High Scram," of Attachment 6,1 "NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate" (aka PUSAR), to the LAR, the licensee stated that the analytical limits (ALs) and allowable values (AVs) for this function were recalculated based on the revised rated thermal power (RTP) level.

In the PUSAR, Table 2.4-1, "Technical Specification Setpoint Information," the licensee proposed to revise the ALs for flow biased simulated thermal power high for two-loop operation from <0.66W2 + 68.0 percent RTP to <0.55W + 67.5 percent RTP. The proposed change also revises the AL for one-loop operation from 0.66(W

- W) + 68.0 percent RTP to 0.55 (W - W) + 67.5 percent RTP.

In Section 3.1.9.f of the enclosure to the LAR, the licensee proposed to revise the AVs for flow biased simulated thermal power high for two-loop operation from

<0.66W + 66.0 percent RTP to <0.55W+ 65.5 percent RTP. The proposed change also revises footnote (c) for one-loop operation from 0.66 (W - W) + 66.0 percent RTP to 0.55 (W - W) + 65.5 percent RTP.

Provide a summary of the calculation used to calculate the AVs from the revised ALs.

1 Attachment 7, "NED0-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate," contains a non-proprietary version of Attachment 6.

2 W is the recirculation drive flow in percent of rated flow. W is the difference between the dual-loop operation and single-loop operation drive flow at the same core flow. The current value of W is 10 percent and is not changed.

E-2 TVA Response The following is a summary of the calculation used to determine the Average Power Range Monitor (APRM) Simulated Thermal Power - High Allowable Values (AVs) from the revised Analytical Limits (ALs). This information was previously provided to the NRC Staff in the Reference 1 response to NRC RAI Part (b) during the review of BFN license amendment request (LAR) TS-453 (Reference 2) concerning the BFN instrument setpoint program. The NRC approved the TS-453 LAR in Reference 3.

Error Terms APRM/Trip/Local Power Range Monitor (LPRM) Accuracy (A) = +/- 1.48% power flow biased Channel Calibration Accuracy (C) = +/- 0.94% power Channel Instrument Drift (D) = +/- 0.86% power flow biased Primary Element Accuracy (DPEA) = 0.82% power bias (APEA) = +/- 0.23% power random Process Measurement Accuracy (PMA) = +/- 1.15% power flow biased APRM Flow Biased Simulated Thermal Power - High AL = 0.55W + 67.5% power Where W = recirculation pump drive flow, percent of rated The Nominal Trip Setpoint (NTSP) is calculated as follows:

NTSP = AL - [1.645/2] * [SQRT(A^2+C^2+PMA^2+APEA^2+D^2)+DPEA]

NTSP = 0.55W + 67.5 - [1.645/2]*[SQRT(1.48 2 + 0.94 2 + 1.15 2 + 0.23 2

+ 0.86 2

) + 0.82]

= 0.55W + 67.5 - 2.548

= 0.55W + 64.95

= 0.55W + 64.68 (for margin to chosen AV) let NTSP (two loop operation) = 0.55W + 64.5% power For single loop operation, the W term is applied to the above NTSP for two-loop operation.

The W term does not change for EPU.

NTSP (single loop operation) = 0.55(W-W) + 64.5% power

E-3 The AV is calculated as follows:

AV

= AL - [1.645/2] * [SQRT(A^2+C^2+PMA^2+APEA^2)]

AV

= 0.55W + 67.5 - [1.645/2] * [SQRT(1.48 2 + 0.94 2 + 1.15 2 + 0.23 2

)]

= 0.55W + 67.5 - 1.735

= 0.55W + 65.77 let AV = 0.55W + 65.5% power For single loop operation, the W term is applied to the above AV for two-loop operation.

The W term does not change for EPU.

AV (single loop operation) = 0.55(W-W) + 65.5% power References

1.

Letter TVA to NRC, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Response to NRC Request for Additional Information (RAI) Related to Technical Specifications (TS) Change No. TS-453 - Instrument Setpoint Program (TAC Nos.

MC9518, MC9519, and MC9520), dated August 1, 2006. (ML062130245).

2.

Letter TVA to NRC, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Technical Specifications (TS) Change No. TS-453 - Instrument Setpoint Program, dated January 10, 2006 (ML060180452).

3.

Letter NRC to TVA, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Issuance of Amendments Regarding the Instrument Setpoint Program (TAC Nos.

MC9518, MC9519, and MC9520) (TS-453), dated September 14, 2006 (ML061680008).

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-16-063 April 5, 2016 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 10, Response to Request for Additional Information

References:

1. Letter from TVA to NRC, CNL-15-169, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU), dated September 21, 2015 (ML15282A152)
2. Letter from NRC to TVA, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos.

MF6741, MF6742, and MF6743), dated March 25, 2016 (ML16084A320)

By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed thermal power of 3458 megawatts to 3952 megawatts. During their technical review of the LAR, the Nuclear Regulatory Commission (NRC) identified the need for additional information. The Reference 2 letter provided an NRC Request for Additional Information (RAI) related to instrumentation and controls. The due date for the response to the NRC RAI provided by the Reference 2 letter is incorrectly stated as April 4, 2016. This due date was subsequently corrected by the NRC.

U.S. Nuclear Regulatory Commission CNL-16-063 Page 2 April 5, 2016 The corrected due date is April 8, 2016. The enclosure to this letter provides the response to the RAI included in the Reference 2 letter.

TVA has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the supplemental information in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed license amendment.

Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter to the Alabama State Department of Public Health.

There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Edward D. Schrull at (423) 751-3850.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 5th day of April 2016.

Respectfully, J. W. Shea Vice President, Nuclear Licensing

Enclosure:

Response to NRC Request for Additional Information EICB-RAI 1 cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US Date: 2016.04.05 16:02:33 -04'00'

ENCLOSURE Response to NRC Request for Additional Information EICB-RAI 1

E-1 EICB RAI 1 In Section 2.4.1.3.3, "APRM [Average Power Range Monitors] Flow Biased Simulated Thermal Power - High Scram," of Attachment 6,1 "NEDC-33860P, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate" (aka PUSAR), to the LAR, the licensee stated that the analytical limits (ALs) and allowable values (AVs) for this function were recalculated based on the revised rated thermal power (RTP) level.

In the PUSAR, Table 2.4-1, "Technical Specification Setpoint Information," the licensee proposed to revise the ALs for flow biased simulated thermal power high for two-loop operation from <0.66W2 + 68.0 percent RTP to <0.55W + 67.5 percent RTP. The proposed change also revises the AL for one-loop operation from 0.66(W

- W) + 68.0 percent RTP to 0.55 (W - W) + 67.5 percent RTP.

In Section 3.1.9.f of the enclosure to the LAR, the licensee proposed to revise the AVs for flow biased simulated thermal power high for two-loop operation from

<0.66W + 66.0 percent RTP to <0.55W+ 65.5 percent RTP. The proposed change also revises footnote (c) for one-loop operation from 0.66 (W - W) + 66.0 percent RTP to 0.55 (W - W) + 65.5 percent RTP.

Provide a summary of the calculation used to calculate the AVs from the revised ALs.

1 Attachment 7, "NED0-33860, Safety Analysis Report for Browns Ferry Nuclear Plant Units 1, 2, and 3 Extended Power Uprate," contains a non-proprietary version of Attachment 6.

2 W is the recirculation drive flow in percent of rated flow. W is the difference between the dual-loop operation and single-loop operation drive flow at the same core flow. The current value of W is 10 percent and is not changed.

E-2 TVA Response The following is a summary of the calculation used to determine the Average Power Range Monitor (APRM) Simulated Thermal Power - High Allowable Values (AVs) from the revised Analytical Limits (ALs). This information was previously provided to the NRC Staff in the Reference 1 response to NRC RAI Part (b) during the review of BFN license amendment request (LAR) TS-453 (Reference 2) concerning the BFN instrument setpoint program. The NRC approved the TS-453 LAR in Reference 3.

Error Terms APRM/Trip/Local Power Range Monitor (LPRM) Accuracy (A) = +/- 1.48% power flow biased Channel Calibration Accuracy (C) = +/- 0.94% power Channel Instrument Drift (D) = +/- 0.86% power flow biased Primary Element Accuracy (DPEA) = 0.82% power bias (APEA) = +/- 0.23% power random Process Measurement Accuracy (PMA) = +/- 1.15% power flow biased APRM Flow Biased Simulated Thermal Power - High AL = 0.55W + 67.5% power Where W = recirculation pump drive flow, percent of rated The Nominal Trip Setpoint (NTSP) is calculated as follows:

NTSP = AL - [1.645/2] * [SQRT(A^2+C^2+PMA^2+APEA^2+D^2)+DPEA]

NTSP = 0.55W + 67.5 - [1.645/2]*[SQRT(1.48 2 + 0.94 2 + 1.15 2 + 0.23 2

+ 0.86 2

) + 0.82]

= 0.55W + 67.5 - 2.548

= 0.55W + 64.95

= 0.55W + 64.68 (for margin to chosen AV) let NTSP (two loop operation) = 0.55W + 64.5% power For single loop operation, the W term is applied to the above NTSP for two-loop operation.

The W term does not change for EPU.

NTSP (single loop operation) = 0.55(W-W) + 64.5% power

E-3 The AV is calculated as follows:

AV

= AL - [1.645/2] * [SQRT(A^2+C^2+PMA^2+APEA^2)]

AV

= 0.55W + 67.5 - [1.645/2] * [SQRT(1.48 2 + 0.94 2 + 1.15 2 + 0.23 2

)]

= 0.55W + 67.5 - 1.735

= 0.55W + 65.77 let AV = 0.55W + 65.5% power For single loop operation, the W term is applied to the above AV for two-loop operation.

The W term does not change for EPU.

AV (single loop operation) = 0.55(W-W) + 65.5% power References

1.

Letter TVA to NRC, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Response to NRC Request for Additional Information (RAI) Related to Technical Specifications (TS) Change No. TS-453 - Instrument Setpoint Program (TAC Nos.

MC9518, MC9519, and MC9520), dated August 1, 2006. (ML062130245).

2.

Letter TVA to NRC, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Technical Specifications (TS) Change No. TS-453 - Instrument Setpoint Program, dated January 10, 2006 (ML060180452).

3.

Letter NRC to TVA, Browns Ferry Nuclear Plant (BFN) - Units 1, 2, and 3 -

Issuance of Amendments Regarding the Instrument Setpoint Program (TAC Nos.

MC9518, MC9519, and MC9520) (TS-453), dated September 14, 2006 (ML061680008).