Closure Notification - Cyber Security Violations Documented in Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report
ML16084A074
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/24/2016
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation, NRC/RGN-III
Shared Package
ML16084A072 List:
References
PNP 2016-013 IR 2015407
Download: ML16084A074 (2)


Text

~Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2016-013 March 24, 2016 US NRC Region III ATTN: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352

SUBJECT:

Closure Notification - Cyber Security Violations Documented in Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-20

Reference:

1. NRC letter to Entergy Nuclear Operations, Inc., Palisades Nuclear Plant, Unit 1 Inspection of Temporary Instruction 22011004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7" Inspection Report 0500025512015407, dated October 14, 2015 (ADAMS Accession No. ML15289A409).

Dear Sir or Madam:

The purpose of this letter is to notify the U.S. Nuclear Regulatory Commission (NRC) Region III that Entergy Nuclear Operations, Inc. (ENO) Palisades Nuclear Plant (PNP) has completed the corrective actions for the violations listed in Inspection Report 05000255/2015407, Inspection of Implementation of Interim Cyber Security Milestones 1-7 (Reference 1).

As documented in the inspection report, on September 17, 2015, the NRC completed an inspection at the PNP that covered the interim cyber security Milestones 1-7 of the security cornerstone. The inspection identified three non-cited violations that were subsequently reviewed by the Security Issues Forum (SIF) Panel which concluded that enforcement discretion is applicable to the three violations.

Additionally, the inspection report requested ENO to provide written notification to the NRC's regional office as to the method and date of closure for the identified issues. The attachment to this letter provides the requested closure information.

ENO requests that the attachment to this letter, which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

Please feel free to contact Jim Miksa with any questions regarding the information provided in this letter at 269-764-2945 or via email at jmiksa@entergy.com

PNP 2016-013 Page 2 of 2 This letter identifies no new commitments and no revisions to existing commitments.

JAH/jpm

Attachment:

Cyber Security Inspection Report Violation Closure Notification (contains SRI) cc: Document Control Desk, USNRC Project Manager, USNRC Resident Inspector, Palisades, USNRC State of Michigan (w/o Attachment)

~Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2016-013 March 24, 2016 US NRC Region III ATTN: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352

SUBJECT:

Closure Notification - Cyber Security Violations Documented in Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-20

Reference:

1. NRC letter to Entergy Nuclear Operations, Inc., Palisades Nuclear Plant, Unit 1 Inspection of Temporary Instruction 22011004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7" Inspection Report 0500025512015407, dated October 14, 2015 (ADAMS Accession No. ML15289A409).

Dear Sir or Madam:

The purpose of this letter is to notify the U.S. Nuclear Regulatory Commission (NRC) Region III that Entergy Nuclear Operations, Inc. (ENO) Palisades Nuclear Plant (PNP) has completed the corrective actions for the violations listed in Inspection Report 05000255/2015407, Inspection of Implementation of Interim Cyber Security Milestones 1-7 (Reference 1).

As documented in the inspection report, on September 17, 2015, the NRC completed an inspection at the PNP that covered the interim cyber security Milestones 1-7 of the security cornerstone. The inspection identified three non-cited violations that were subsequently reviewed by the Security Issues Forum (SIF) Panel which concluded that enforcement discretion is applicable to the three violations.

Additionally, the inspection report requested ENO to provide written notification to the NRC's regional office as to the method and date of closure for the identified issues. The attachment to this letter provides the requested closure information.

ENO requests that the attachment to this letter, which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

Please feel free to contact Jim Miksa with any questions regarding the information provided in this letter at 269-764-2945 or via email at jmiksa@entergy.com

PNP 2016-013 Page 2 of 2 This letter identifies no new commitments and no revisions to existing commitments.

JAH/jpm

Attachment:

Cyber Security Inspection Report Violation Closure Notification (contains SRI) cc: Document Control Desk, USNRC Project Manager, USNRC Resident Inspector, Palisades, USNRC State of Michigan (w/o Attachment)