ML16068A388

From kanterella
Jump to navigation Jump to search

Memo Ico Staff Review of V.C. Summer Nuclear Station Physical Security Plan Rev. 15 (NS113625) for Verification of ASM Order (EA-13-228) Implementation (CAC L25088)
ML16068A388
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 03/09/2016
From: Tim Mossman
Division of Security Policy
To: Patricia Silva
NRC/NMSS/DSFM/IOB
Garner, Douglas
References
CAC L25088, EA-13-228
Download: ML16068A388 (2)


Text

March 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/

Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF VIRGIL C. SUMMER NUCLEAR STATION PHYSICAL SECURITY PLAN REVISION 15 FOR THE VERFICATION OF ASM (EA-13-228) IMPLEMENTATION CAC NO. L25088 The staff has completed its review of the Virgil C. Summer Nuclear Station (V.C. Summer)

Physical Security Plan (PSP) Rev. 15 which was submitted by the South Carolina Electric and Gas Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated March 3, 2016.

Based on our review, we find the submitted PSP to be acceptable and the V.C. Summer PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the additional security measures imposed by NRC Order EA-13-228.

A physical security inspection (IR 07201038/2016401) was completed on March 3, 2016, which verified the PSP successfully meets the objectives outlined in Inspection Procedure 81311. Based on staffs observations, the V.C. Summer PSP (Rev. 15) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the additional security measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov Docket Nos. 50-395, 72-1038 CONTACT: Douglas Garner NSIR/DSP 301-287-0929

March 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/

Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF VIRGIL C. SUMMER NUCLEAR STATION PHYSICAL SECURITY PLAN REVISION 15 FOR THE VERFICATION OF ASM (EA-13-228) IMPLEMENTATION CAC NO. L25088 The staff has completed its review of the Virgil C. Summer Nuclear Station (V.C. Summer)

Physical Security Plan (PSP) Rev. 15 which was submitted by the South Carolina Electric and Gas Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated March 3, 2016.

Based on our review, we find the submitted PSP to be acceptable and the V.C. Summer PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the additional security measures imposed by NRC Order EA-13-228.

A physical security inspection (IR 07201038/2016401) was completed on March 3, 2016, which verified the PSP successfully meets the objectives outlined in Inspection Procedure 81311. Based on staffs observations, the V.C. Summer PSP (Rev. 15) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the additional security measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov Docket Nos. 50-395, 72-1038 CONTACT: Douglas Garner NSIR/DSP 301-287-0929 DISTRIBUTION:

DSP r/f ADAMS ACCESSION NO.: ML16068A388 OFFICE DSP/MWSB DSP/MWSB:BC NAME D. Garner T. Mossman DATE 03/09/16 03/09/16 OFFICIAL RECORD COPY

March 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/

Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF VIRGIL C. SUMMER NUCLEAR STATION PHYSICAL SECURITY PLAN REVISION 15 FOR THE VERFICATION OF ASM (EA-13-228) IMPLEMENTATION CAC NO. L25088 The staff has completed its review of the Virgil C. Summer Nuclear Station (V.C. Summer)

Physical Security Plan (PSP) Rev. 15 which was submitted by the South Carolina Electric and Gas Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated March 3, 2016.

Based on our review, we find the submitted PSP to be acceptable and the V.C. Summer PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the additional security measures imposed by NRC Order EA-13-228.

A physical security inspection (IR 07201038/2016401) was completed on March 3, 2016, which verified the PSP successfully meets the objectives outlined in Inspection Procedure 81311. Based on staffs observations, the V.C. Summer PSP (Rev. 15) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the additional security measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov Docket Nos. 50-395, 72-1038 CONTACT: Douglas Garner NSIR/DSP 301-287-0929

March 09, 2016 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Timothy Mossman, Chief /RA/

Materials and Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response

SUBJECT:

STAFF REVIEW OF VIRGIL C. SUMMER NUCLEAR STATION PHYSICAL SECURITY PLAN REVISION 15 FOR THE VERFICATION OF ASM (EA-13-228) IMPLEMENTATION CAC NO. L25088 The staff has completed its review of the Virgil C. Summer Nuclear Station (V.C. Summer)

Physical Security Plan (PSP) Rev. 15 which was submitted by the South Carolina Electric and Gas Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated March 3, 2016.

Based on our review, we find the submitted PSP to be acceptable and the V.C. Summer PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.55, and the additional security measures imposed by NRC Order EA-13-228.

A physical security inspection (IR 07201038/2016401) was completed on March 3, 2016, which verified the PSP successfully meets the objectives outlined in Inspection Procedure 81311. Based on staffs observations, the V.C. Summer PSP (Rev. 15) has met the performance objectives and general requirements outlined in 10 CFR, Section 73.55 and the additional security measures imposed by the NRC.

If you have any questions, please contact Douglas Garner, at 301-287-0929, douglas.garner@nrc.gov Docket Nos. 50-395, 72-1038 CONTACT: Douglas Garner NSIR/DSP 301-287-0929 DISTRIBUTION:

DSP r/f ADAMS ACCESSION NO.: ML16068A388 OFFICE DSP/MWSB DSP/MWSB:BC NAME D. Garner T. Mossman DATE 03/09/16 03/09/16 OFFICIAL RECORD COPY