UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 February 23, 2016 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000298/2016002) AND REQUEST FOR INFORMATION

Dear Mr. Limpias:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Cooper Nuclear Station from April 4-8 and April 18-22, 2016.

The inspection will consist of three reactor inspectors from the NRCs Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by March 28, 2016. Upon review of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Dave Van Der Kamp of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at robert.latta@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number-3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the

O. Limpias requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 05-298 License: DPR-46

Enclosure:

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to Cooper Nuclear Station

Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Cooper Nuclear Station Inspection Report: 05000298/2016002 Inspection Dates: Onsite - April 4-8, 2016, and April 18-22, 2016 Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Lead Inspector: Robert Latta, Senior Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by March 28, 2016, to the attention of Robert Latta. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
7. Procedure(s) for implementing permanent plant modifications.

Enclosure

8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Robert Latta Shiattin Makor Lindsay Brandt Senior Reactor Inspector Reactor Inspector Project Engineer 817-200-1532 817-200-1507 817-200-1463 robert.latta@nrc.gov shiattin.makor@nrc.gov lindsay.brandt@nrc.gov Mailing Address:

U.S. NRC, Region IV Attn: Robert Latta 1600 East Lamar Blvd.

Arlington, TX 76011-4125

ML16054A718 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: RML Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DRS/EB1/SRI: C:

NAME RLatta TFarnholtz SIGNATURE /RA/ /RA/

DATE 2/23/16 2/23/16 Letter to Oscar A. Limpias from Thomas R. Farnholtz dated February 23, 2016

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000298/2016002) AND REQUEST FOR INFORMATION Distribution Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Patricia.Voss@nrc.gov)

Resident Inspector (Christopher.Henderson@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Thomas.Wengert@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 February 23, 2016 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000298/2016002) AND REQUEST FOR INFORMATION

Dear Mr. Limpias:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Cooper Nuclear Station from April 4-8 and April 18-22, 2016.

The inspection will consist of three reactor inspectors from the NRCs Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by March 28, 2016. Upon review of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Dave Van Der Kamp of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Latta, by telephone at 817-200-1532 or by e-mail at robert.latta@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number-3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the

O. Limpias requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 05-298 License: DPR-46

Enclosure:

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to Cooper Nuclear Station

Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Cooper Nuclear Station Inspection Report: 05000298/2016002 Inspection Dates: Onsite - April 4-8, 2016, and April 18-22, 2016 Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Lead Inspector: Robert Latta, Senior Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by March 28, 2016, to the attention of Robert Latta. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
7. Procedure(s) for implementing permanent plant modifications.

Enclosure

8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Robert Latta Shiattin Makor Lindsay Brandt Senior Reactor Inspector Reactor Inspector Project Engineer 817-200-1532 817-200-1507 817-200-1463 robert.latta@nrc.gov shiattin.makor@nrc.gov lindsay.brandt@nrc.gov Mailing Address:

U.S. NRC, Region IV Attn: Robert Latta 1600 East Lamar Blvd.

Arlington, TX 76011-4125

ML16054A718 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: RML Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DRS/EB1/SRI: C:

NAME RLatta TFarnholtz SIGNATURE /RA/ /RA/

DATE 2/23/16 2/23/16 Letter to Oscar A. Limpias from Thomas R. Farnholtz dated February 23, 2016

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000298/2016002) AND REQUEST FOR INFORMATION Distribution Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Patricia.Voss@nrc.gov)

Resident Inspector (Christopher.Henderson@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Thomas.Wengert@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)