W0FCREEK 'NUCLEAR OPERATING CORPORATION Jaime H. McCoy Vice President Engineering January 19, 2016 ET 16-0003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter dated March 12, 2012 from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident"
Subject:
Docket No. 50-482: Wolf Creek Nuclear Operating Corporation's Flood Hazard Reevaluation Report, Revision 1 Gentlemen:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to Wolf Creek Nuclear Operating Corporation (WCNOC). Enclosure 2 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Near-Term Task Force Recommendation 2.1, Flooding. The enclosure of Reference 2 provides WCNOC's Flood Hazard Reevaluation Report (FHRR), Revision 0.
Significant changes have occurred to the site since the time of the preparation and review of the initial FHRR. The enclosure to this letter provides WCNOC's FHRR, Revision 1. Changes to the FHRR will be represented by revision bars present in the margin.
The FHRR, Revision 1, was previously submitted as an enclosure to Reference 4 on October 27, 2015. The supporting calculation did not conform to the NRC's Electronic v1U~
~c?~
P.O. Box 411 I Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
ET 16-0003 Page 2 of 3 Information Exchange (EIE) guidance, and was rejected by the Document Control Desk. Based upon discussions with Anthony Minarik, USNRC, only Revision 1 of the FHRR is provided in this letter. This letter supercedes Reference 4. The enclosure to this letter provides WCNOC's FHRR, Revision 1. Changes to the FHRR will be represented by revision bars present in the margin.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine (620) 364-4204.
Sincerely, Jaime H. McCoy J HM/rlt
Enclosure:
Wolf Creek Nuclear Operating Corporation Flood Hazard Reevaluation Report, Revision 1 cc: M. L. Dapas (NRC), w/e C. F. Lyon (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e
ET 16-0003 Page 3 of 3 STATE OF KANSAS )5 COUNTY OF COFFEY Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
B .4A-"A-t)
\/$ reidn Engineering L/
SUBSCRIBED and sworn to before me this / q~day of ,-)"l,'-J ,2016.
Expiration Date [/,*/*d/*ri/
Enclosure to ET 16-0003 Enclosure to ET 16-0003 Wolf Creek Nuclear Operating Corporation Flood Hazard Reevaluation Report, Revision I (105 pages)
W0FCREEK 'NUCLEAR OPERATING CORPORATION Jaime H. McCoy Vice President Engineering January 19, 2016 ET 16-0003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter dated March 12, 2012 from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident"
Subject:
Docket No. 50-482: Wolf Creek Nuclear Operating Corporation's Flood Hazard Reevaluation Report, Revision 1 Gentlemen:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to Wolf Creek Nuclear Operating Corporation (WCNOC). Enclosure 2 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Near-Term Task Force Recommendation 2.1, Flooding. The enclosure of Reference 2 provides WCNOC's Flood Hazard Reevaluation Report (FHRR), Revision 0.
Significant changes have occurred to the site since the time of the preparation and review of the initial FHRR. The enclosure to this letter provides WCNOC's FHRR, Revision 1. Changes to the FHRR will be represented by revision bars present in the margin.
The FHRR, Revision 1, was previously submitted as an enclosure to Reference 4 on October 27, 2015. The supporting calculation did not conform to the NRC's Electronic v1U~
~c?~
P.O. Box 411 I Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
ET 16-0003 Page 2 of 3 Information Exchange (EIE) guidance, and was rejected by the Document Control Desk. Based upon discussions with Anthony Minarik, USNRC, only Revision 1 of the FHRR is provided in this letter. This letter supercedes Reference 4. The enclosure to this letter provides WCNOC's FHRR, Revision 1. Changes to the FHRR will be represented by revision bars present in the margin.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine (620) 364-4204.
Sincerely, Jaime H. McCoy J HM/rlt
Enclosure:
Wolf Creek Nuclear Operating Corporation Flood Hazard Reevaluation Report, Revision 1 cc: M. L. Dapas (NRC), w/e C. F. Lyon (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e
ET 16-0003 Page 3 of 3 STATE OF KANSAS )5 COUNTY OF COFFEY Jaime H. McCoy, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
B .4A-"A-t)
\/$ reidn Engineering L/
SUBSCRIBED and sworn to before me this / q~day of ,-)"l,'-J ,2016.