MONTHYEARML16026A5872015-12-0909 December 2015 NRR E-mail Capture - South Texas Project Unit 1 Draft Request for Additional Information Project stage: Draft RAI ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) Project stage: Approval ML16029A2722016-03-15015 March 2016 12/7-8/2015 Audit Summary, Audit Conducted to Support License Amendment Request to Revise TS 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) Project stage: Other 2015-12-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18190A5002018-07-0909 July 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Unit 1 Relief Request - Relief Request RR-ENG-3-16 (L-2018-LLR-0097) ML18121A0322018-04-30030 April 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Technical Specification Change for Standby Diesel Generator Surveillance Requirements Acceptance Criteria (L-2018-LLA-0078) ML18060A3062018-03-0101 March 2018 NRR E-mail Capture - Acceptance Review Results for South Texas Project Relief Request to Extend the Timeframe for Volumetric Exams of B-A and B-D Reactor Vessel Welds (L-2018-LLR-0010) ML18016A1542018-01-16016 January 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Relief Request to Use Ultrasonic Examination Techniques in Lieu of Radiography (L-2017-LLR-0154) 2023-09-21
[Table view] |
Text
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, December 09, 2015 9:47 AM To: Richards, Drew (amrichards@STPEGS.COM); Brost, Wendy (webrost@STPEGS.COM)
Cc: Michael Murray; Sterling, Lance (lsterling@STPEGS.COM); cralbury@stpegs.com
Subject:
Additional STP RAI for Emergency CR Amendment
- Drew, As discussed, here is one additional questions to be answered on the docket so that the staff can complete its review of your emergency request for an amendment date December 3, 2015.
- 7. On page 19 of 22 of your December 3, 2015, emergency amendment request, you state that 10 CFR 50.62(c)(3) concerning an alternate rod injection system as stated in Standard Review Plan, Section 4.6 are for boiling water reactors and do not apply to the South Texas Project Unit 1. The staff agrees that the BWR portion of the Anticipated Transient Without Scram (ATWS) rule, 10 CFR 50.62(c)(3), does not apply; however, the remainder of the ATWS rule, 10 CFR 50.62, should be considered by STP since it does apply to pressurized water reactors. Provide the impact on ATWS for STP considering the removal of control rod D6
- Thanks, Lisa Lisa Regner Sr. PM NRR/DORL/LPL4-1 301-415-1906 O8D08 1
Hearing Identifier: NRR_PMDA Email Number: 2620 Mail Envelope Properties (8aa2982b0d2b4caca27aa1404d28016e)
Subject:
Additional STP RAI for Emergency CR Amendment Sent Date: 12/9/2015 9:47:13 AM Received Date: 12/9/2015 9:47:00 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Michael Murray" <mpmurray@STpegs.com>
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Tracking Status: None "cralbury@stpegs.com" <cralbury@stpegs.com>
Tracking Status: None "Richards, Drew (amrichards@STPEGS.COM)" <amrichards@STPEGS.COM>
Tracking Status: None "Brost, Wendy (webrost@STPEGS.COM)" <webrost@STPEGS.COM>
Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 912 12/9/2015 9:47:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Wednesday, December 09, 2015 9:47 AM To: Richards, Drew (amrichards@STPEGS.COM); Brost, Wendy (webrost@STPEGS.COM)
Cc: Michael Murray; Sterling, Lance (lsterling@STPEGS.COM); cralbury@stpegs.com
Subject:
Additional STP RAI for Emergency CR Amendment
- Drew, As discussed, here is one additional questions to be answered on the docket so that the staff can complete its review of your emergency request for an amendment date December 3, 2015.
- 7. On page 19 of 22 of your December 3, 2015, emergency amendment request, you state that 10 CFR 50.62(c)(3) concerning an alternate rod injection system as stated in Standard Review Plan, Section 4.6 are for boiling water reactors and do not apply to the South Texas Project Unit 1. The staff agrees that the BWR portion of the Anticipated Transient Without Scram (ATWS) rule, 10 CFR 50.62(c)(3), does not apply; however, the remainder of the ATWS rule, 10 CFR 50.62, should be considered by STP since it does apply to pressurized water reactors. Provide the impact on ATWS for STP considering the removal of control rod D6
- Thanks, Lisa Lisa Regner Sr. PM NRR/DORL/LPL4-1 301-415-1906 O8D08 1
Hearing Identifier: NRR_PMDA Email Number: 2620 Mail Envelope Properties (8aa2982b0d2b4caca27aa1404d28016e)
Subject:
Additional STP RAI for Emergency CR Amendment Sent Date: 12/9/2015 9:47:13 AM Received Date: 12/9/2015 9:47:00 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Michael Murray" <mpmurray@STpegs.com>
Tracking Status: None "Sterling, Lance (lsterling@STPEGS.COM)" <lsterling@STPEGS.COM>
Tracking Status: None "cralbury@stpegs.com" <cralbury@stpegs.com>
Tracking Status: None "Richards, Drew (amrichards@STPEGS.COM)" <amrichards@STPEGS.COM>