Submission of 10 CFR 72.48 Cask Design, and for Any Tests, Experiments or Procedure Changes Report
ML16019A330
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 01/18/2016
From: Gardner P
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
L -MT-16-008
Download: ML16019A330 (1)


Text

(l Xcel Energy Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 January 18, 2016 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263,72-058 Renewed Facility Operating License No. DPR-22 L -MT 008 10 CFR 72.48 Submission of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)

In accordance with 10 CFR 72.48(d), the Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy Nuclear is submitting a report for any changes related to the facility or independent spent fuel storage installation (ISFSI) cask design, and for any tests, experiments or procedure changes related to 10 CFR 72.48(c)(1), at MNGP.

For the time period from December 6, 2014 to December 31, 2015, there were no 10 CFR 72.48 evaluations performed.

Summary of Commitments:

This letter makes no new commitments or changes to any existing commitments.

7~~

Peter A Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota cc:

Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Senior Resident Inspector, Monticello, USNRC

(l Xcel Energy Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 January 18, 2016 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263,72-058 Renewed Facility Operating License No. DPR-22 L -MT 008 10 CFR 72.48 Submission of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)

In accordance with 10 CFR 72.48(d), the Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy Nuclear is submitting a report for any changes related to the facility or independent spent fuel storage installation (ISFSI) cask design, and for any tests, experiments or procedure changes related to 10 CFR 72.48(c)(1), at MNGP.

For the time period from December 6, 2014 to December 31, 2015, there were no 10 CFR 72.48 evaluations performed.

Summary of Commitments:

This letter makes no new commitments or changes to any existing commitments.

7~~

Peter A Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota cc:

Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Senior Resident Inspector, Monticello, USNRC