ML16015A400

From kanterella
Jump to navigation Jump to search
Official Exhibit - FPL-014C-00-BD01 - 2012 FPL Comprehensive Pre-Uprate Monitoring Report - Pages 2-93 to 2-139
ML16015A400
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/2012
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28497, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA
Download: ML16015A400 (47)


Text

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-93 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-014C-00-BD01 1/4/2016 1/4/2016 FPL-014C

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-94 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-95 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-96 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.

0 10000 20000 30000 40000 50000 60000 70000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B 0

10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-97 Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

0 5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1T TPSWC-2T TPSWC-3T 0

5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1B TPSWC-2B TPSWC-3B 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1T TPSWC-2T TPSWC-3T 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWC-2B TPSWC-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-98 Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

0 10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWID-1T TPSWID-2T TPSWID-3T 0

10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWID-1B TPSWID-2B TPSWID-3B 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWID-1T TPSWID-2T TPSWID-3T 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWID-1B TPSWID-2B TPSWID-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-99 Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1B TPSWCCS-1B TPSWID-1B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWCCS-1B TPSWID-1B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-100 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-2B TPSWCCS-7B TPSWID-2B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWCCS-1B TPSWID-1B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-101 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 0

10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-3B TPSWCCS-3B TPSWID-3B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-3B TPSWCCS-3B TPSWID-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-102 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.

Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.

5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 12 16 20 24 28 32 36 40 44 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-103 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.

Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.

5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6

-10

-5 0

5 10 15 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-104 Figure 2.3-1. TPGW-1 Water Elevations.

Figure 2.3-2. TPGW-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-105 Figure 2.3-3. TPGW-3 Water Elevations.

Figure 2.3-4. TPGW-4 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-106 Figure 2.3-5. TPGW-5 Water Elevations.

Figure 2.3-6. TPGW-6 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-107 Figure 2.3-7. TPGW-7 Water Elevations.

Figure 2.3-8. TPGW-8 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-108 Figure 2.3-9. TPGW-9 Water Elevations.

Figure 2.3-10. TPGW-10 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-109 Figure 2.3-11. TPGW-11 Water Elevations.

Figure 2.3-12. TPGW-12 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-110 Figure 2.3-13. TPGW-13 Water Elevations.

Figure 2.3-14. TPGW-14 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-111 Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-14S TPGW-13S TPGW-5S TPGW-7S

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-14S TPGW-9S TPGW-4S

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-112 Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-3S TPGW-13S TPGW-12S

-2.5

-1.5

-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-10S TPGW-11S TPGW-13S TPGW-14S

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-113 Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-13S TPSWCCS-2B

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-114 Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

Figure 2.3-22. TPBBSW-10 Water Elevations.

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-11S TPBBSW-3B

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-115 Figure 2.3-23. TPBBSW-3 Water Elevations.

Figure 2.3-24. TPBBSW-14 Water Elevations.

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-116 Figure 2.3-25. TPSWC-1 Water Elevations.

Figure 2.3-26. TPSWC-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-117 Figure 2.3-27. TPSWC-3 Water Elevations.

Figure 2.3-28. TPSWC-4 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-118 Figure 2.3-29. TPSWC-5 Water Elevations.

Figure 2.3-30. TPSWCCS-1 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-119 Figure 2.3-31. TPSWCCS-2 Water Elevations.

Figure 2.3-32. TPSWCCS-3 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-120 Figure 2.3-33. TPSWCCS-4 Water Elevations.

Figure 2.3-34. TPSWCCS-5 Water Elevations.

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-121 Figure 2.3-35. TPSWCCS-6 Water Elevations.

Figure 2.3-36. TPSWCCS-7 Water Elevations.

-4.0

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-122 Figure 2.3-37. TPSWID-1 Water Elevations.

Figure 2.3-38. TPSWID-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-123 Figure 2.3-39. TPSWID-3 Water Elevations.

2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.5

-1.5

-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-124 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-125 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.

-3.0

-2.0

-1.0 0.0 1.0 2.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 Water Elevation (ft, NAVD 88)

TPSWCCS-5 TPBBSW-3 TPSWC-3

-3.0

-2.0

-1.0 0.0 1.0 2.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 Water Elevation (ft, NAVD 88)

TPSWCCS-5 TPBBSW-3 TPSWC-3

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-126 Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-127 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-128 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-129 Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.

-2.0

-1.5

-1.0

-0.5 0.0 0.5 1.0 1.5 2.0 10 20 30 40 50 60 70 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Rainfall (inch)

Temperature (°Celcius)

Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 Temperature Rainfall 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.03 1.04 30 40 50 60 70 80 90 100 110 120 130 140 150 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Barometric Pressure (mm Hg)

Relative Humidity (%)

Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 Relative Humidity Barometric Pressurel

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-130 Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.

-80

-70

-60

-50

-40

-30

-20

-10 0

10 20 30 0

20 40 60 80 100 120 140 160 180 200 220 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Lull Wind Speed (mph)

Gust Wind Speed (mph)

Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Gust Wind Speed Lull Wind Speed

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-131 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.

0 200 400 600 800 1000 1200 1400 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Photosynthetic Radiation (µmols m-2 s-1)

Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-132 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.

9.0 13.5 2.3 5.5 0.5 3.5 0.2 1.6 1.9 2.4 1.6 10.6 9.2 6.9 13.3 0.3 0.6 1.5 5.9 1.0 12.5 9.4 8.9 0

2 4

6 8

10 12 14 16 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total Monthly Rainfall (inches)

Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-133 Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.

WRPLOT View - Lakes Environmental Software WIND ROW PLOT: July 2010-June 2012 COMMENTS:

COMPANY NAME:

MODELER:

DATE:

8/21/2012 PROJECT NO.:

NORTH SOUTH WEST EAST 4%

8%

12%

16%

20%

WIND SPEED (Knots)

>= 22 17 - 21 11 - 17 7 - 11 4 - 7 1 - 4 Calms: 0.01%

TOTAL COUNT:

16698 hrs.

CALM WINDS:

0.01%

DATA PERIOD:

Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 AVG. WIND SPEED:

8.57 Knots DISPLAY:

Wind Speed Direction (blowing from)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-134 Figure 2.4-8. Wind Speed (Class) Frequency Distribution.

0.0 7.0 25.7 44.5 21.8 0.9 0.1 0

10 20 30 40 50 Calm 1-4 4-7 7-11 11-17 17-21

>21 Percentage (%)

Wind Speed (m/s) Class Frequency Distribution

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-135 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-136 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).

0 0.5 1

1.5 2

2.5 3

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Velocity (ft/s) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Flow (ft3/s)

TPFM-1 TPFM-2

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-137 Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.

Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.

FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 R² = 0.8708 0.0 500.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 4000.0 4500.0 0

1000 2000 3000 4000 5000 Flow at South of Canal (TPFM-2 Flow, ft3/s)

Discharge into Canal (TPFM-1 Flow, ft3/s)

-1000.0

-500.0 0.0 500.0 1000.0 1500.0 2000.0 0

1000 2000 3000 4000 5000 Flow Loss (TPFM-1 minus TPFM-2, ft3/s)

Discharge into Canal (TPFM-1 Flow, ft3/s)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-138 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).

0 500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Flow (ft3/s)

TPFM-1 TPFM-2 0

500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Flow (ft3/s)

TPFM-1 TPFM-2

-3

-2.5

-2

-1.5

-1

-0.5 0

1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Water Elevation (ft, NAVD 88)

TPBBSW-3

-3

-2.5

-2

-1.5

-1

-0.5 0

1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Water Elevation (ft, NAVD 88)

TPBBSW-3

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-139 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).

0 500 1000 1500 2000 2500 3000 3500 4000 4500 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Flow (ft3/s)

TPFM-1 TPFM-2 0

500 1000 1500 2000 2500 3000 3500 4000 4500 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Flow (ft3/s)

TPFM-1 TPFM-2

-3

-2.5

-2

-1.5

-1

-0.5 0

3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Water Elevation (ft, NAVD 88)

TPBBSW-3

-3

-2.5

-2

-1.5

-1

-0.5 0

3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Water Elevation (ft, NAVD 88)

TPBBSW-3

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-93 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-014C-00-BD01 1/4/2016 1/4/2016 FPL-014C

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-94 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-95 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-96 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.

0 10000 20000 30000 40000 50000 60000 70000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B 0

10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-97 Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

0 5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1T TPSWC-2T TPSWC-3T 0

5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1B TPSWC-2B TPSWC-3B 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1T TPSWC-2T TPSWC-3T 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWC-2B TPSWC-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-98 Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

0 10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWID-1T TPSWID-2T TPSWID-3T 0

10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWID-1B TPSWID-2B TPSWID-3B 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWID-1T TPSWID-2T TPSWID-3T 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWID-1B TPSWID-2B TPSWID-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-99 Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-1B TPSWCCS-1B TPSWID-1B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWCCS-1B TPSWID-1B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-100 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-2B TPSWCCS-7B TPSWID-2B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-1B TPSWCCS-1B TPSWID-1B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-101 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 0

10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)

TPSWC-3B TPSWCCS-3B TPSWID-3B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWC-3B TPSWCCS-3B TPSWID-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-102 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.

Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.

5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 12 16 20 24 28 32 36 40 44 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)

TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-103 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.

Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.

5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6

-10

-5 0

5 10 15 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)

TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-104 Figure 2.3-1. TPGW-1 Water Elevations.

Figure 2.3-2. TPGW-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-105 Figure 2.3-3. TPGW-3 Water Elevations.

Figure 2.3-4. TPGW-4 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-106 Figure 2.3-5. TPGW-5 Water Elevations.

Figure 2.3-6. TPGW-6 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-107 Figure 2.3-7. TPGW-7 Water Elevations.

Figure 2.3-8. TPGW-8 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-108 Figure 2.3-9. TPGW-9 Water Elevations.

Figure 2.3-10. TPGW-10 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-109 Figure 2.3-11. TPGW-11 Water Elevations.

Figure 2.3-12. TPGW-12 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-110 Figure 2.3-13. TPGW-13 Water Elevations.

Figure 2.3-14. TPGW-14 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

Shallow Intermediate Deep

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-111 Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-14S TPGW-13S TPGW-5S TPGW-7S

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-14S TPGW-9S TPGW-4S

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-112 Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-3S TPGW-13S TPGW-12S

-2.5

-1.5

-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-10S TPGW-11S TPGW-13S TPGW-14S

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-113 Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-13S TPSWCCS-2B

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-114 Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

Figure 2.3-22. TPBBSW-10 Water Elevations.

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPGW-11S TPBBSW-3B

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-115 Figure 2.3-23. TPBBSW-3 Water Elevations.

Figure 2.3-24. TPBBSW-14 Water Elevations.

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-116 Figure 2.3-25. TPSWC-1 Water Elevations.

Figure 2.3-26. TPSWC-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-117 Figure 2.3-27. TPSWC-3 Water Elevations.

Figure 2.3-28. TPSWC-4 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-118 Figure 2.3-29. TPSWC-5 Water Elevations.

Figure 2.3-30. TPSWCCS-1 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-119 Figure 2.3-31. TPSWCCS-2 Water Elevations.

Figure 2.3-32. TPSWCCS-3 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-120 Figure 2.3-33. TPSWCCS-4 Water Elevations.

Figure 2.3-34. TPSWCCS-5 Water Elevations.

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-121 Figure 2.3-35. TPSWCCS-6 Water Elevations.

Figure 2.3-36. TPSWCCS-7 Water Elevations.

-4.0

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-122 Figure 2.3-37. TPSWID-1 Water Elevations.

Figure 2.3-38. TPSWID-2 Water Elevations.

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-123 Figure 2.3-39. TPSWID-3 Water Elevations.

2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

-2.5

-1.5

-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-124 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations

-3.0

-2.0

-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-125 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.

-3.0

-2.0

-1.0 0.0 1.0 2.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 Water Elevation (ft, NAVD 88)

TPSWCCS-5 TPBBSW-3 TPSWC-3

-3.0

-2.0

-1.0 0.0 1.0 2.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 Water Elevation (ft, NAVD 88)

TPSWCCS-5 TPBBSW-3 TPSWC-3

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-126 Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.

-3.0

-2.0

-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)

TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-127 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-128 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-129 Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.

-2.0

-1.5

-1.0

-0.5 0.0 0.5 1.0 1.5 2.0 10 20 30 40 50 60 70 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Rainfall (inch)

Temperature (°Celcius)

Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 Temperature Rainfall 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.03 1.04 30 40 50 60 70 80 90 100 110 120 130 140 150 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Barometric Pressure (mm Hg)

Relative Humidity (%)

Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 Relative Humidity Barometric Pressurel

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-130 Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.

-80

-70

-60

-50

-40

-30

-20

-10 0

10 20 30 0

20 40 60 80 100 120 140 160 180 200 220 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Lull Wind Speed (mph)

Gust Wind Speed (mph)

Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Gust Wind Speed Lull Wind Speed

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-131 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.

0 200 400 600 800 1000 1200 1400 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Photosynthetic Radiation (µmols m-2 s-1)

Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-132 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.

9.0 13.5 2.3 5.5 0.5 3.5 0.2 1.6 1.9 2.4 1.6 10.6 9.2 6.9 13.3 0.3 0.6 1.5 5.9 1.0 12.5 9.4 8.9 0

2 4

6 8

10 12 14 16 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total Monthly Rainfall (inches)

Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-133 Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.

WRPLOT View - Lakes Environmental Software WIND ROW PLOT: July 2010-June 2012 COMMENTS:

COMPANY NAME:

MODELER:

DATE:

8/21/2012 PROJECT NO.:

NORTH SOUTH WEST EAST 4%

8%

12%

16%

20%

WIND SPEED (Knots)

>= 22 17 - 21 11 - 17 7 - 11 4 - 7 1 - 4 Calms: 0.01%

TOTAL COUNT:

16698 hrs.

CALM WINDS:

0.01%

DATA PERIOD:

Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 AVG. WIND SPEED:

8.57 Knots DISPLAY:

Wind Speed Direction (blowing from)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-134 Figure 2.4-8. Wind Speed (Class) Frequency Distribution.

0.0 7.0 25.7 44.5 21.8 0.9 0.1 0

10 20 30 40 50 Calm 1-4 4-7 7-11 11-17 17-21

>21 Percentage (%)

Wind Speed (m/s) Class Frequency Distribution

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-135 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-136 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).

0 0.5 1

1.5 2

2.5 3

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Velocity (ft/s) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Flow (ft3/s)

TPFM-1 TPFM-2

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-137 Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.

Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.

FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 R² = 0.8708 0.0 500.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 4000.0 4500.0 0

1000 2000 3000 4000 5000 Flow at South of Canal (TPFM-2 Flow, ft3/s)

Discharge into Canal (TPFM-1 Flow, ft3/s)

-1000.0

-500.0 0.0 500.0 1000.0 1500.0 2000.0 0

1000 2000 3000 4000 5000 Flow Loss (TPFM-1 minus TPFM-2, ft3/s)

Discharge into Canal (TPFM-1 Flow, ft3/s)

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-138 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).

0 500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Flow (ft3/s)

TPFM-1 TPFM-2 0

500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Flow (ft3/s)

TPFM-1 TPFM-2

-3

-2.5

-2

-1.5

-1

-0.5 0

1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Water Elevation (ft, NAVD 88)

TPBBSW-3

-3

-2.5

-2

-1.5

-1

-0.5 0

1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Water Elevation (ft, NAVD 88)

TPBBSW-3

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-139 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).

0 500 1000 1500 2000 2500 3000 3500 4000 4500 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Flow (ft3/s)

TPFM-1 TPFM-2 0

500 1000 1500 2000 2500 3000 3500 4000 4500 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Flow (ft3/s)

TPFM-1 TPFM-2

-3

-2.5

-2

-1.5

-1

-0.5 0

3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Water Elevation (ft, NAVD 88)

TPBBSW-3

-3

-2.5

-2

-1.5

-1

-0.5 0

3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Water Elevation (ft, NAVD 88)

TPBBSW-3