ML16015A400
| ML16015A400 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/31/2012 |
| From: | Florida Power & Light Co |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 28497, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA | |
| Download: ML16015A400 (47) | |
Text
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-93 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-014C-00-BD01 1/4/2016 1/4/2016 FPL-014C
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-94 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-95 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-96 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.
Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.
0 10000 20000 30000 40000 50000 60000 70000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B 0
10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-97 Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.
0 5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1T TPSWC-2T TPSWC-3T 0
5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1B TPSWC-2B TPSWC-3B 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1T TPSWC-2T TPSWC-3T 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWC-2B TPSWC-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-98 Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.
0 10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWID-1T TPSWID-2T TPSWID-3T 0
10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWID-1B TPSWID-2B TPSWID-3B 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWID-1T TPSWID-2T TPSWID-3T 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWID-1B TPSWID-2B TPSWID-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-99 Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1B TPSWCCS-1B TPSWID-1B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWCCS-1B TPSWID-1B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-100 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-2B TPSWCCS-7B TPSWID-2B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWCCS-1B TPSWID-1B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-101 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 0
10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-3B TPSWCCS-3B TPSWID-3B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-3B TPSWCCS-3B TPSWID-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-102 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.
Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.
5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 12 16 20 24 28 32 36 40 44 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-103 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.
Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.
5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6
-10
-5 0
5 10 15 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-104 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-105 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-106 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-107 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-108 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-109 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-110 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-111 Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-13S TPGW-5S TPGW-7S
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-9S TPGW-4S
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-112 Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-3S TPGW-13S TPGW-12S
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-10S TPGW-11S TPGW-13S TPGW-14S
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-113 Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-13S TPSWCCS-2B
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-114 Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
Figure 2.3-22. TPBBSW-10 Water Elevations.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-11S TPBBSW-3B
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-115 Figure 2.3-23. TPBBSW-3 Water Elevations.
Figure 2.3-24. TPBBSW-14 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-116 Figure 2.3-25. TPSWC-1 Water Elevations.
Figure 2.3-26. TPSWC-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-117 Figure 2.3-27. TPSWC-3 Water Elevations.
Figure 2.3-28. TPSWC-4 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-118 Figure 2.3-29. TPSWC-5 Water Elevations.
Figure 2.3-30. TPSWCCS-1 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-119 Figure 2.3-31. TPSWCCS-2 Water Elevations.
Figure 2.3-32. TPSWCCS-3 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-120 Figure 2.3-33. TPSWCCS-4 Water Elevations.
Figure 2.3-34. TPSWCCS-5 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-121 Figure 2.3-35. TPSWCCS-6 Water Elevations.
Figure 2.3-36. TPSWCCS-7 Water Elevations.
-4.0
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-122 Figure 2.3-37. TPSWID-1 Water Elevations.
Figure 2.3-38. TPSWID-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-123 Figure 2.3-39. TPSWID-3 Water Elevations.
2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-124 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-125 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.
-3.0
-2.0
-1.0 0.0 1.0 2.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 Water Elevation (ft, NAVD 88)
TPSWCCS-5 TPBBSW-3 TPSWC-3
-3.0
-2.0
-1.0 0.0 1.0 2.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 Water Elevation (ft, NAVD 88)
TPSWCCS-5 TPBBSW-3 TPSWC-3
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-126 Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-127 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-128 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-129 Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.
-2.0
-1.5
-1.0
-0.5 0.0 0.5 1.0 1.5 2.0 10 20 30 40 50 60 70 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Rainfall (inch)
Temperature (°Celcius)
Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 Temperature Rainfall 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.03 1.04 30 40 50 60 70 80 90 100 110 120 130 140 150 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Barometric Pressure (mm Hg)
Relative Humidity (%)
Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 Relative Humidity Barometric Pressurel
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-130 Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.
-80
-70
-60
-50
-40
-30
-20
-10 0
10 20 30 0
20 40 60 80 100 120 140 160 180 200 220 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Lull Wind Speed (mph)
Gust Wind Speed (mph)
Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Gust Wind Speed Lull Wind Speed
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-131 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.
0 200 400 600 800 1000 1200 1400 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Photosynthetic Radiation (µmols m-2 s-1)
Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-132 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.
9.0 13.5 2.3 5.5 0.5 3.5 0.2 1.6 1.9 2.4 1.6 10.6 9.2 6.9 13.3 0.3 0.6 1.5 5.9 1.0 12.5 9.4 8.9 0
2 4
6 8
10 12 14 16 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total Monthly Rainfall (inches)
Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-133 Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.
WRPLOT View - Lakes Environmental Software WIND ROW PLOT: July 2010-June 2012 COMMENTS:
COMPANY NAME:
MODELER:
DATE:
8/21/2012 PROJECT NO.:
NORTH SOUTH WEST EAST 4%
8%
12%
16%
20%
WIND SPEED (Knots)
>= 22 17 - 21 11 - 17 7 - 11 4 - 7 1 - 4 Calms: 0.01%
TOTAL COUNT:
16698 hrs.
CALM WINDS:
0.01%
DATA PERIOD:
Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 AVG. WIND SPEED:
8.57 Knots DISPLAY:
Wind Speed Direction (blowing from)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-134 Figure 2.4-8. Wind Speed (Class) Frequency Distribution.
0.0 7.0 25.7 44.5 21.8 0.9 0.1 0
10 20 30 40 50 Calm 1-4 4-7 7-11 11-17 17-21
>21 Percentage (%)
Wind Speed (m/s) Class Frequency Distribution
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-135 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-136 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).
0 0.5 1
1.5 2
2.5 3
7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Velocity (ft/s) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Flow (ft3/s)
TPFM-1 TPFM-2
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-137 Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.
Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.
FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 R² = 0.8708 0.0 500.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 4000.0 4500.0 0
1000 2000 3000 4000 5000 Flow at South of Canal (TPFM-2 Flow, ft3/s)
Discharge into Canal (TPFM-1 Flow, ft3/s)
-1000.0
-500.0 0.0 500.0 1000.0 1500.0 2000.0 0
1000 2000 3000 4000 5000 Flow Loss (TPFM-1 minus TPFM-2, ft3/s)
Discharge into Canal (TPFM-1 Flow, ft3/s)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-138 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).
0 500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Flow (ft3/s)
TPFM-1 TPFM-2 0
500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Flow (ft3/s)
TPFM-1 TPFM-2
-3
-2.5
-2
-1.5
-1
-0.5 0
1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Water Elevation (ft, NAVD 88)
TPBBSW-3
-3
-2.5
-2
-1.5
-1
-0.5 0
1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Water Elevation (ft, NAVD 88)
TPBBSW-3
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-139 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).
0 500 1000 1500 2000 2500 3000 3500 4000 4500 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Flow (ft3/s)
TPFM-1 TPFM-2 0
500 1000 1500 2000 2500 3000 3500 4000 4500 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Flow (ft3/s)
TPFM-1 TPFM-2
-3
-2.5
-2
-1.5
-1
-0.5 0
3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Water Elevation (ft, NAVD 88)
TPBBSW-3
-3
-2.5
-2
-1.5
-1
-0.5 0
3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Water Elevation (ft, NAVD 88)
TPBBSW-3
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-93 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-014C-00-BD01 1/4/2016 1/4/2016 FPL-014C
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-94 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-95 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-96 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.
Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.
0 10000 20000 30000 40000 50000 60000 70000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B 0
10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-97 Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.
0 5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1T TPSWC-2T TPSWC-3T 0
5000 10000 15000 20000 25000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1B TPSWC-2B TPSWC-3B 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1T TPSWC-2T TPSWC-3T 14 18 22 26 30 34 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWC-2B TPSWC-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-98 Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.
0 10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWID-1T TPSWID-2T TPSWID-3T 0
10000 20000 30000 40000 50000 60000 70000 80000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWID-1B TPSWID-2B TPSWID-3B 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWID-1T TPSWID-2T TPSWID-3T 16 20 24 28 32 36 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWID-1B TPSWID-2B TPSWID-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-99 Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-1B TPSWCCS-1B TPSWID-1B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWCCS-1B TPSWID-1B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-100 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-2B TPSWCCS-7B TPSWID-2B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-1B TPSWCCS-1B TPSWID-1B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-101 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 0
10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Specific Conductance (µS/cm)
TPSWC-3B TPSWCCS-3B TPSWID-3B 14 18 22 26 30 34 38 42 46 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWC-3B TPSWCCS-3B TPSWID-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-102 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.
Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.
5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 12 16 20 24 28 32 36 40 44 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Temperature (oC)
TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-103 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.
Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.
5 10 15 20 25 30 35 40 45 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6
-10
-5 0
5 10 15 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Temperature (oC)
TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-104 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-105 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-106 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-107 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-108 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-109 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-110 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
Shallow Intermediate Deep
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-111 Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-13S TPGW-5S TPGW-7S
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-9S TPGW-4S
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-112 Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-3S TPGW-13S TPGW-12S
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-10S TPGW-11S TPGW-13S TPGW-14S
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-113 Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-13S TPSWCCS-2B
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-114 Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
Figure 2.3-22. TPBBSW-10 Water Elevations.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-11S TPBBSW-3B
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-115 Figure 2.3-23. TPBBSW-3 Water Elevations.
Figure 2.3-24. TPBBSW-14 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-116 Figure 2.3-25. TPSWC-1 Water Elevations.
Figure 2.3-26. TPSWC-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-117 Figure 2.3-27. TPSWC-3 Water Elevations.
Figure 2.3-28. TPSWC-4 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-118 Figure 2.3-29. TPSWC-5 Water Elevations.
Figure 2.3-30. TPSWCCS-1 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-119 Figure 2.3-31. TPSWCCS-2 Water Elevations.
Figure 2.3-32. TPSWCCS-3 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-120 Figure 2.3-33. TPSWCCS-4 Water Elevations.
Figure 2.3-34. TPSWCCS-5 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-121 Figure 2.3-35. TPSWCCS-6 Water Elevations.
Figure 2.3-36. TPSWCCS-7 Water Elevations.
-4.0
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-122 Figure 2.3-37. TPSWID-1 Water Elevations.
Figure 2.3-38. TPSWID-2 Water Elevations.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-123 Figure 2.3-39. TPSWID-3 Water Elevations.
2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-124 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations
-3.0
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-125 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.
-3.0
-2.0
-1.0 0.0 1.0 2.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 Water Elevation (ft, NAVD 88)
TPSWCCS-5 TPBBSW-3 TPSWC-3
-3.0
-2.0
-1.0 0.0 1.0 2.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 Water Elevation (ft, NAVD 88)
TPSWCCS-5 TPBBSW-3 TPSWC-3
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-126 Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-127 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-128 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-129 Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.
-2.0
-1.5
-1.0
-0.5 0.0 0.5 1.0 1.5 2.0 10 20 30 40 50 60 70 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Rainfall (inch)
Temperature (°Celcius)
Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 Temperature Rainfall 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1.00 1.01 1.02 1.03 1.04 30 40 50 60 70 80 90 100 110 120 130 140 150 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Barometric Pressure (mm Hg)
Relative Humidity (%)
Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 Relative Humidity Barometric Pressurel
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-130 Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.
-80
-70
-60
-50
-40
-30
-20
-10 0
10 20 30 0
20 40 60 80 100 120 140 160 180 200 220 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Lull Wind Speed (mph)
Gust Wind Speed (mph)
Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Gust Wind Speed Lull Wind Speed
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-131 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.
0 200 400 600 800 1000 1200 1400 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Photosynthetic Radiation (µmols m-2 s-1)
Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-132 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.
9.0 13.5 2.3 5.5 0.5 3.5 0.2 1.6 1.9 2.4 1.6 10.6 9.2 6.9 13.3 0.3 0.6 1.5 5.9 1.0 12.5 9.4 8.9 0
2 4
6 8
10 12 14 16 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total Monthly Rainfall (inches)
Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-133 Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.
WRPLOT View - Lakes Environmental Software WIND ROW PLOT: July 2010-June 2012 COMMENTS:
COMPANY NAME:
MODELER:
DATE:
8/21/2012 PROJECT NO.:
NORTH SOUTH WEST EAST 4%
8%
12%
16%
20%
WIND SPEED (Knots)
>= 22 17 - 21 11 - 17 7 - 11 4 - 7 1 - 4 Calms: 0.01%
TOTAL COUNT:
16698 hrs.
CALM WINDS:
0.01%
DATA PERIOD:
Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 AVG. WIND SPEED:
8.57 Knots DISPLAY:
Wind Speed Direction (blowing from)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-134 Figure 2.4-8. Wind Speed (Class) Frequency Distribution.
0.0 7.0 25.7 44.5 21.8 0.9 0.1 0
10 20 30 40 50 Calm 1-4 4-7 7-11 11-17 17-21
>21 Percentage (%)
Wind Speed (m/s) Class Frequency Distribution
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-135 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-136 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).
0 0.5 1
1.5 2
2.5 3
7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Velocity (ft/s) 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 Flow (ft3/s)
TPFM-1 TPFM-2
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-137 Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.
Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.
FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 R² = 0.8708 0.0 500.0 1000.0 1500.0 2000.0 2500.0 3000.0 3500.0 4000.0 4500.0 0
1000 2000 3000 4000 5000 Flow at South of Canal (TPFM-2 Flow, ft3/s)
Discharge into Canal (TPFM-1 Flow, ft3/s)
-1000.0
-500.0 0.0 500.0 1000.0 1500.0 2000.0 0
1000 2000 3000 4000 5000 Flow Loss (TPFM-1 minus TPFM-2, ft3/s)
Discharge into Canal (TPFM-1 Flow, ft3/s)
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-138 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).
0 500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Flow (ft3/s)
TPFM-1 TPFM-2 0
500 1000 1500 2000 2500 3000 3500 4000 4500 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Flow (ft3/s)
TPFM-1 TPFM-2
-3
-2.5
-2
-1.5
-1
-0.5 0
1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 Water Elevation (ft, NAVD 88)
TPBBSW-3
-3
-2.5
-2
-1.5
-1
-0.5 0
1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 Water Elevation (ft, NAVD 88)
TPBBSW-3
FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2-139 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).
0 500 1000 1500 2000 2500 3000 3500 4000 4500 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Flow (ft3/s)
TPFM-1 TPFM-2 0
500 1000 1500 2000 2500 3000 3500 4000 4500 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Flow (ft3/s)
TPFM-1 TPFM-2
-3
-2.5
-2
-1.5
-1
-0.5 0
3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 Water Elevation (ft, NAVD 88)
TPBBSW-3
-3
-2.5
-2
-1.5
-1
-0.5 0
3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 Water Elevation (ft, NAVD 88)
TPBBSW-3