ML16015A400

From kanterella
Jump to navigation Jump to search
Official Exhibit - FPL-014C-00-BD01 - 2012 FPL Comprehensive Pre-Uprate Monitoring Report - Pages 2-93 to 2-139
ML16015A400
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/2012
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28497, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA
Download: ML16015A400 (47)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL-014C FPL Turkey Point Semi-Annual Monitoring Report Docket #: 05000250 & 05000251 for Units 3 & 4 Uprate Project - October 2012 Exhibit #: FPL-014C-00-BD01 Identified: 1/4/2016 Section 2 Admitted: 1/4/2016 Withdrawn:

Rejected: Stricken:

Other:

Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

2-93

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.

2-94

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

2-95

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 Specific Conductance (µS/cm) 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.

2-96

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 25000 25000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 20000 20000 15000 15000 10000 10000 5000 5000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1T TPSWC-2T TPSWC-3T TPSWC-1B TPSWC-2B TPSWC-3B 34 34 30 30 (oC)

Temperature (oC) 26 26 Temperature 22 22 18 18 14 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1T TPSWC-2T TPSWC-3T TPSWC-1B TPSWC-2B TPSWC-3B Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

2-97

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 80000 80000 70000 70000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWID-1T TPSWID-2T TPSWID-3T TPSWID-1B TPSWID-2B TPSWID-3B 36 36 32 32 Temperature (oC)

(oC) 28 28 Temperature 24 24 20 20 16 16 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWID-1T TPSWID-2T TPSWID-3T TPSWID-1B TPSWID-2B TPSWID-3B Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

2-98

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

2-99

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-2B TPSWCCS-7B TPSWID-2B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

2-100

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-3B TPSWCCS-3B TPSWID-3B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-3B TPSWCCS-3B TPSWID-3B Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 2-101

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 45 40 35 Temperature (oC) 30 25 20 15 10 5

2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.

44 40 36 Temperature (oC) 32 28 24 20 16 12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.

2-102

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 45 40 35 Temperature (oC) 30 25 20 15 10 5

2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.

15 10 Temperature (oC) 5 0

-5

-10 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2 Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.

2-103

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-1. TPGW-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-2. TPGW-2 Water Elevations.

2-104

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-3. TPGW-3 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-4. TPGW-4 Water Elevations.

2-105

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-5. TPGW-5 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-6. TPGW-6 Water Elevations.

2-106

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-7. TPGW-7 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-8. TPGW-8 Water Elevations.

2-107

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-9. TPGW-9 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-10. TPGW-10 Water Elevations.

2-108

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-11. TPGW-11 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-12. TPGW-12 Water Elevations.

2-109

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-13. TPGW-13 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-14. TPGW-14 Water Elevations.

2-110

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

2-111

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

2-112

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

2-113

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.

2-114

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.

2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.

2-115

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-25. TPSWC-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-26. TPSWC-2 Water Elevations.

2-116

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-27. TPSWC-3 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-28. TPSWC-4 Water Elevations.

2-117

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-29. TPSWC-5 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-30. TPSWCCS-1 Water Elevations.

2-118

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-31. TPSWCCS-2 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-32. TPSWCCS-3 Water Elevations.

2-119

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-33. TPSWCCS-4 Water Elevations.

1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-34. TPSWCCS-5 Water Elevations.

2-120

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 0.0 Water Elevation (ft, NAVD 88)

-1.0

-2.0

-3.0

-4.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-35. TPSWCCS-6 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-36. TPSWCCS-7 Water Elevations.

2-121

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-37. TPSWID-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-38. TPSWID-2 Water Elevations.

2-122

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-39. TPSWID-3 Water Elevations.

1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T 2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5 2-123

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 0.0 Water Elevation (ft, NAVD 88)

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations 2-124

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 TPSWCCS-5 TPBBSW-3 TPSWC-3 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 TPSWCCS-5 TPBBSW-3 TPSWC-3 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.

2-125

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.

2-126

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.

2-127

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.

2-128

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 70 2.0 1.5 60 Rainfall (inch) 1.0 50 0.5 40 0.0

-0.5 Temperature (°Celcius) 30

-1.0 20

-1.5 10 -2.0 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Temperature Rainfall Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 150 1.04 Barometric Pressure (mm Hg) 140 1.03 130 1.02 120 1.01 110 1.00 100 0.99 90 0.98 80 0.97 Relative Humidity (%)

70 0.96 60 0.95 50 0.94 40 0.93 30 0.92 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Relative Humidity Barometric Pressurel Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.

2-129

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Lull Wind Speed (mph) 220 30 200 20 180 10 160 0 140 -10 120 -20 100 -30 Gust Wind Speed (mph) 80 -40 60 -50 40 -60 20 -70 0 -80 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Gust Wind Speed Lull Wind Speed Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.

2-130

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012 1400 1200 1000 Photosynthetic Radiation (µmols m-2 s-1) 800 600 400 200 0

6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.

2-131

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012 16 14 13.5 13.3 12.5 12 10.6 Total Monthly Rainfall (inches) 10 9.2 9.4 9.0 8.9 8

6.9 5.9 6 5.5 4 3.5 2.3 2.4 2 1.6 1.9 1.6 1.5 1.0 0.5 0.2 0.3 0.6 0

Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.

2-132

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 WIND ROW PLOT: July 2010-June 2012 DISPLAY:

Wind Speed Direction (blowing from)

NORTH 20%

16%

12%

8%

4%

WEST EAST WIND SPEED (Knots)

>= 22 17 - 21 11 - 17 SOUTH 7 - 11 4-7 1-4 Calms: 0.01%

COMMENTS: DATA PERIOD: COMPANY NAME:

Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 MODELER:

CALM WINDS: TOTAL COUNT:

0.01% 16698 hrs.

AVG. WIND SPEED: DATE: PROJECT NO.:

8.57 Knots 8/21/2012 WRPLOT View - Lakes Environmental Software Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.

2-133

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 50 44.5 40 30 Percentage (%)

25.7 21.8 20 10 7.0 0.0 0.9 0.1 0

Calm 1-4 4-7 7-11 11-17 17-21 >21 Wind Speed (m/s) Class Frequency Distribution Figure 2.4-8. Wind Speed (Class) Frequency Distribution.

2-134

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.

2-135

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 3

2.5 2

Velocity (ft/s) 1.5 1

0.5 0

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 5000 4500 4000 3500 Flow (ft3/s) 3000 2500 2000 1500 1000 500 0

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 TPFM-1 TPFM-2 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).

2-136

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500.0 Flow at South of Canal (TPFM-2 Flow, ft3/s) 4000.0 3500.0 3000.0 2500.0 2000.0 1500.0 1000.0 FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 500.0 R² = 0.8708 0.0 0 1000 2000 3000 4000 5000 Discharge into Canal (TPFM-1 Flow, ft3/s)

Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.

2000.0 Flow Loss (TPFM-1 minus TPFM-2, ft3/s) 1500.0 1000.0 500.0 0.0 0 1000 2000 3000 4000 5000

-500.0

-1000.0 Discharge into Canal (TPFM-1 Flow, ft3/s)

Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.

2-137

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500 4500 4000 4000 3500 3500 3000 3000 Flow (ft3/s) Flow (ft3/s) 2500 2500 2000 2000 1500 1500 1000 1000 500 500 0 0 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 TPFM-1 TPFM-2 TPFM-1 TPFM-2 0 0 Water Elevation (ft, NAVD 88) Water Elevation (ft, NAVD 88)

-0.5 -0.5

-1 -1

-1.5 -1.5

-2 -2

-2.5 -2.5

-3 -3 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 TPBBSW-3 TPBBSW-3 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).

2-138

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500 4500 4000 4000 3500 3500 3000 3000 Flow (ft3/s) Flow (ft3/s) 2500 2500 2000 2000 1500 1500 1000 1000 500 500 0 0 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 TPFM-1 TPFM-2 TPFM-1 TPFM-2 0 0 Water Elevation (ft, NAVD 88) Water Elevation (ft, NAVD 88)

-0.5 -0.5

-1 -1

-1.5 -1.5

-2 -2

-2.5 -2.5

-3 -3 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 TPBBSW-3 TPBBSW-3 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).

2-139

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL-014C FPL Turkey Point Semi-Annual Monitoring Report Docket #: 05000250 & 05000251 for Units 3 & 4 Uprate Project - October 2012 Exhibit #: FPL-014C-00-BD01 Identified: 1/4/2016 Section 2 Admitted: 1/4/2016 Withdrawn:

Rejected: Stricken:

Other:

Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

2-93

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelcius) for Surface Water Stations.

2-94

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

2-95

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 Specific Conductance (µS/cm) 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPBBSW-14B Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-3B TPBBSW-5B TPSWCCS-5T Figure 2.2-28. Comparison of Specific Conductance and Temperature in CCS and Biscayne Bay Surface Water Stations.

2-96

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 25000 25000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 20000 20000 15000 15000 10000 10000 5000 5000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1T TPSWC-2T TPSWC-3T TPSWC-1B TPSWC-2B TPSWC-3B 34 34 30 30 (oC)

Temperature (oC) 26 26 Temperature 22 22 18 18 14 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1T TPSWC-2T TPSWC-3T TPSWC-1B TPSWC-2B TPSWC-3B Figure 2.2-29. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

2-97

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 80000 80000 70000 70000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWID-1T TPSWID-2T TPSWID-3T TPSWID-1B TPSWID-2B TPSWID-3B 36 36 32 32 Temperature (oC)

(oC) 28 28 Temperature 24 24 20 20 16 16 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWID-1T TPSWID-2T TPSWID-3T TPSWID-1B TPSWID-2B TPSWID-3B Figure 2.2-30. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

2-98

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B Figure 2.2-31. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

2-99

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-2B TPSWCCS-7B TPSWID-2B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-1B TPSWCCS-1B TPSWID-1B Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

2-100

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-3B TPSWCCS-3B TPSWID-3B 46 42 38 Temperature (oC) 34 30 26 22 18 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWC-3B TPSWCCS-3B TPSWID-3B Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations 2-101

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 45 40 35 Temperature (oC) 30 25 20 15 10 5

2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Ambient TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 Figure 2.2-34. Biscayne Bay and CCS Water Temperatures and Ambient Air Temperature.

44 40 36 Temperature (oC) 32 28 24 20 16 12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B Figure 2.2-35. Comparison of Temperature in CCS Surface Water Stations.

2-102

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 45 40 35 Temperature (oC) 30 25 20 15 10 5

2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 Ambient Daily Max Ambient Daily Min SFWMD BBCW-10 TPBBSW-2 TPBBSW-4 TPSWCCS-1 TPSWCCS-6 Figure 2.2-36. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values) Time Series Plots.

15 10 Temperature (oC) 5 0

-5

-10 2/1/11 2/21/11 3/13/11 4/2/11 4/22/11 5/12/11 6/1/11 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 TPSWCCS TPBBSW-4 TPSWCCS SFWMD BBCW10 TPSWCCS TPBBSW-2 Ambient - TPBBSW-4 Ambient - SFWMD BBCW10 Ambient - TPBBSW-2 Figure 2.2-37. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.

2-103

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-1. TPGW-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-2. TPGW-2 Water Elevations.

2-104

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-3. TPGW-3 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-4. TPGW-4 Water Elevations.

2-105

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-5. TPGW-5 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-6. TPGW-6 Water Elevations.

2-106

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-7. TPGW-7 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-8. TPGW-8 Water Elevations.

2-107

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-9. TPGW-9 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-10. TPGW-10 Water Elevations.

2-108

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-11. TPGW-11 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-12. TPGW-12 Water Elevations.

2-109

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-13. TPGW-13 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.3-14. TPGW-14 Water Elevations.

2-110

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.

2-111

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.

1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.

2-112

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.

1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 and TPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.

2-113

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.

2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.

2-114

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.

2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.

2-115

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-25. TPSWC-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-26. TPSWC-2 Water Elevations.

2-116

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-27. TPSWC-3 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-28. TPSWC-4 Water Elevations.

2-117

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-29. TPSWC-5 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-30. TPSWCCS-1 Water Elevations.

2-118

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-31. TPSWCCS-2 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-32. TPSWCCS-3 Water Elevations.

2-119

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-33. TPSWCCS-4 Water Elevations.

1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-34. TPSWCCS-5 Water Elevations.

2-120

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 0.0 Water Elevation (ft, NAVD 88)

-1.0

-2.0

-3.0

-4.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-35. TPSWCCS-6 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-36. TPSWCCS-7 Water Elevations.

2-121

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-37. TPSWID-1 Water Elevations.

2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-38. TPSWID-2 Water Elevations.

2-122

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0

-1.0

-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-39. TPSWID-3 Water Elevations.

1.5 Water Elevation (ft, NAVD 88) 0.5

-0.5

-1.5

-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-3B TPBBSW-10B TPBBSW-14B TPSWC-5T 2.3-40 Comparison of Time Series Surface Water Elevations in Tidal Stations TPBBSW-3, TPBBSW-10, TPBBSW-14, and TPSWC-5 2-123

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 1.0 0.0 Water Elevation (ft, NAVD 88)

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-1B TPSWCCS-2B TPSWCCS-3B TPSWCCS-4T TPSWCCS-5T TPSWCCS-6T TPSWCCS-7B 2.3-41 Comparison of Time Series Surface Water Elevations in CCS Stations 2-124

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 12/24/11 0:00 12/24/11 6:00 12/24/11 12:00 12/24/11 18:00 12/25/11 0:00 TPSWCCS-5 TPBBSW-3 TPSWC-3 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 3/9/12 0:00 3/9/12 6:00 3/9/12 12:00 3/9/12 18:00 3/10/12 0:00 TPSWCCS-5 TPBBSW-3 TPSWC-3 Figure 2.3-42. Lack of Tidal Response in CCS and L-31E Surface Water.

2-125

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0

-1.0

-2.0

-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPSWCCS-5T TPSWCCS-7 TPSWC-2T TPBBSW-3B Figure 2.3-43. Comparison of Time Series Surface Water Elevations in CCS, L-31E, and Biscayne Bay.

2-126

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.4-1. Locations of Meteorological Stations and Rainfall Gauges.

2-127

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.4-2. Photos of the Meteorological Station and Rainfall Collector.

2-128

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Temperature and Rainfall Time Series at TPM-1 July 2010 - June 2012 70 2.0 1.5 60 Rainfall (inch) 1.0 50 0.5 40 0.0

-0.5 Temperature (°Celcius) 30

-1.0 20

-1.5 10 -2.0 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Temperature Rainfall Relative Humidity and Barometric Pressure Time Series at TPM-1 July 2010 - June 2012 150 1.04 Barometric Pressure (mm Hg) 140 1.03 130 1.02 120 1.01 110 1.00 100 0.99 90 0.98 80 0.97 Relative Humidity (%)

70 0.96 60 0.95 50 0.94 40 0.93 30 0.92 6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Relative Humidity Barometric Pressurel Figure 2.4-3. Time Series Rainfall, Temperature, Relative Humidity, and Barometric Pressure at TPM-1.

2-129

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Gust Wind Speed and Lull Wind Speed Time Series at TPM-1 July 2010 - June 2012 Lull Wind Speed (mph) 220 30 200 20 180 10 160 0 140 -10 120 -20 100 -30 Gust Wind Speed (mph) 80 -40 60 -50 40 -60 20 -70 0 -80 06/29/10 08/29/10 10/29/10 12/29/10 02/28/11 04/30/11 06/30/11 08/30/11 10/30/11 12/30/11 02/29/12 04/30/12 06/30/12 Gust Wind Speed Lull Wind Speed Figure 2.4-4. Time Series Wind Direction, Wind Speed, Wind Gusts, and Wind Speed at Lull for TPM-1.

2-130

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Photosynthetic Radiation Time Series at TPM-1 July 2010 - June 2012 1400 1200 1000 Photosynthetic Radiation (µmols m-2 s-1) 800 600 400 200 0

6/29/10 8/29/10 10/29/10 12/29/10 2/28/11 4/30/11 6/30/11 8/30/11 10/30/11 12/30/11 2/29/12 4/30/12 6/30/12 Figure 2.4-5. Time Series Photosynthetically Active Radiation (PAR) for TPM-1.

2-131

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Monthly Rainfall at TPM-1 Aug 2010 - Jun 2012 16 14 13.5 13.3 12.5 12 10.6 Total Monthly Rainfall (inches) 10 9.2 9.4 9.0 8.9 8

6.9 5.9 6 5.5 4 3.5 2.3 2.4 2 1.6 1.9 1.6 1.5 1.0 0.5 0.2 0.3 0.6 0

Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Figure 2.4-6. Monthly Rainfall at TPM-1 from August 2010 through June 2012.

2-132

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 WIND ROW PLOT: July 2010-June 2012 DISPLAY:

Wind Speed Direction (blowing from)

NORTH 20%

16%

12%

8%

4%

WEST EAST WIND SPEED (Knots)

>= 22 17 - 21 11 - 17 SOUTH 7 - 11 4-7 1-4 Calms: 0.01%

COMMENTS: DATA PERIOD: COMPANY NAME:

Start Date: 7/26/2010 - 00:00 End Date: 6/30/2012 - 23:00 MODELER:

CALM WINDS: TOTAL COUNT:

0.01% 16698 hrs.

AVG. WIND SPEED: DATE: PROJECT NO.:

8.57 Knots 8/21/2012 WRPLOT View - Lakes Environmental Software Figure 2.4-7. Wind Row Plot Indicating Wind Speed and Direction.

2-133

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 50 44.5 40 30 Percentage (%)

25.7 21.8 20 10 7.0 0.0 0.9 0.1 0

Calm 1-4 4-7 7-11 11-17 17-21 >21 Wind Speed (m/s) Class Frequency Distribution Figure 2.4-8. Wind Speed (Class) Frequency Distribution.

2-134

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Figure 2.5-1. Acoustic Doppler Flow Meter Measurement Setup within the Water Column.

2-135

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 3

2.5 2

Velocity (ft/s) 1.5 1

0.5 0

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 5000 4500 4000 3500 Flow (ft3/s) 3000 2500 2000 1500 1000 500 0

7/26/10 11/3/10 2/11/11 5/22/11 8/30/11 12/8/11 3/17/12 6/25/12 TPFM-1 TPFM-2 Figure 2.5-2. Indexed Velocity and Flow Rates for Flow Meter Stations TPFM-1 (Outflow from Plant) and TPFM-2 (South of CCS).

2-136

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500.0 Flow at South of Canal (TPFM-2 Flow, ft3/s) 4000.0 3500.0 3000.0 2500.0 2000.0 1500.0 1000.0 FlowTPFM-2 = 0.8113(FlowTPFM-1) + 134.27 500.0 R² = 0.8708 0.0 0 1000 2000 3000 4000 5000 Discharge into Canal (TPFM-1 Flow, ft3/s)

Figure 2.5-3. Flow Rates at TPFM-1 Compared to TPFM-2.

2000.0 Flow Loss (TPFM-1 minus TPFM-2, ft3/s) 1500.0 1000.0 500.0 0.0 0 1000 2000 3000 4000 5000

-500.0

-1000.0 Discharge into Canal (TPFM-1 Flow, ft3/s)

Figure 2.5-4. Flow Rates at TPFM-1 Compared to the Flow Loss of Water Traveling from North to South.

2-137

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500 4500 4000 4000 3500 3500 3000 3000 Flow (ft3/s) Flow (ft3/s) 2500 2500 2000 2000 1500 1500 1000 1000 500 500 0 0 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 TPFM-1 TPFM-2 TPFM-1 TPFM-2 0 0 Water Elevation (ft, NAVD 88) Water Elevation (ft, NAVD 88)

-0.5 -0.5

-1 -1

-1.5 -1.5

-2 -2

-2.5 -2.5

-3 -3 1/23/11 1/24/11 1/25/11 1/26/11 1/27/11 1/28/11 1/29/11 1/30/11 1/23/11 0:00 1/23/11 6:00 1/23/11 12:00 1/23/11 18:00 1/24/11 0:00 TPBBSW-3 TPBBSW-3 Figure 2.5-5. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (January 23-30, 2011).

2-138

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 4500 4500 4000 4000 3500 3500 3000 3000 Flow (ft3/s) Flow (ft3/s) 2500 2500 2000 2000 1500 1500 1000 1000 500 500 0 0 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 TPFM-1 TPFM-2 TPFM-1 TPFM-2 0 0 Water Elevation (ft, NAVD 88) Water Elevation (ft, NAVD 88)

-0.5 -0.5

-1 -1

-1.5 -1.5

-2 -2

-2.5 -2.5

-3 -3 3/23/11 3/24/11 3/25/11 3/26/11 3/27/11 3/28/11 3/29/11 3/30/11 3/24/11 0:00 3/24/11 6:00 3/24/11 12:00 3/24/11 18:00 3/25/11 0:00 TPBBSW-3 TPBBSW-3 Figure 2.5-6. Flow Rates at TPFM-1 and TPFM-2 Compared to the Tidal Amplitude at TPBBSW-3 (March 23-30, 2011).

2-139