Official Exhibit - FPL-014B-00-BD01 - 2012 FPL Comprehensive Pre-Uprate Monitoring Report - Pages 2-63 to 2-92
ML16015A399
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/2012
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28497, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA
Download: ML16015A399 (30)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report Docket #: 05000250 & 05000251 Exhibit #: FPL-014B-00-BD01 Identified: 1/4/2016 for Units 3 & 4 Uprate Project - October 2012 Admitted: 1/4/2016 Withdrawn: Section 2 Rejected: Stricken:

Other:

100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-14S TPGW-10D TPGW-11D TPGW-14D 28 28 27 27 (oC)

Temperature (oC) 26 26 Temperature 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-14S TPGW-10D TPGW-11D TPGW-14D Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.

2-63

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-3S TPGW-13S TPGW-5S TPGW-7S TPGW-14D TPGW-3D TPGW-13D TPGW-5D TPGW-7D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-3S TPGW-13S TPGW-5S TPGW-7S TPGW-14D TPGW-3D TPGW-13D TPGW-5D TPGW-7D Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.

2-64

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-2S TPGW-4S TPGW-9S TPGW-11D TPGW-13D TPGW-2D TPGW-4D TPGW-9D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-2S TPGW-4S TPGW-9S TPGW-11D TPGW-13D TPGW-2D TPGW-4D TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.

2-65

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-1S TPGW-6S TPGW-11D TPGW-13D TPGW-1D TPGW-6D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-1S TPGW-6S TPGW-11D TPGW-13D TPGW-1D TPGW-6D Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.

2-66

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-12S TPGW-13S TPGW-6S TPGW-10D TPGW-12D TPGW-13D TPGW-6D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-12S TPGW-13S TPGW-6S TPGW-10D TPGW-12D TPGW-13D TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.

2-67

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPGW-3S TPGW-10S TPGW-1D TPGW-2D TPGW-3D TPGW-10D TPGW-11S TPGW-12S TPGW-13S TPGW-14S TPGW-11D TPGW-12D TPGW-13D TPGW-14D 31 31 30 30 29 29 (oC)

Temperature (oC) 28 28 Temperature 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPGW-3S TPGW-10S TPGW-1D TPGW-2D TPGW-3D TPGW-10D TPGW-11S TPGW-12S TPGW-13S TPGW-14S TPGW-11D TPGW-12D TPGW-13D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS - TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.

2-68

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPGW-10S TPGW-14S TPBBSW-5B TPBBSW-10B TPGW-10D TPGW-14D 34 34 30 30 (oC)

Temperature (oC) 26 26 Temperature 22 22 18 18 14 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPGW-10S TPGW-14S TPBBSW-5B TPBBSW-10B TPGW-10D TPGW-14D Figure 2.1-25. Comparison of Specific Conductance and Temperature in Biscayne Bay Surface Water and Biscayne Bay Shallow and Deep Wells TPGW-10 and TPGW-14.

2-69

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Typical automated station in the CCS. Close-up photo of automated station panel.

Top view of probes in stilling well. Biscayne Bay non-telemetry setup.

Figure 2.2-1. Automated Surface Water Stations.

2-70

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-2. TPBBSW-1 Specific Conductance, Temperature, and Salinity.

2-71

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-3. TPBBSW-2 Specific Conductance, Temperature, and Salinity.

2-72

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-4. TPBBSW-3 Specific Conductance, Temperature, and Salinity.

2-73

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-5. TPBBSW-4 Specific Conductance, Temperature, and Salinity.

2-74

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-6. TPBBSW-5 Specific Conductance, Temperature, and Salinity.

2-75

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-7. TPBBSW-10 Specific Conductance, Temperature, and Salinity.

2-76

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-8. TPBBSW-14 Specific Conductance, Temperature, and Salinity.

2-77

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 8000 7000 Specific Conductance (µS/cm) 6000 5000 4000 3000 2000 1000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 4 16 3

Salinity (PSS-78) 2 1

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-9. TPSWC-1 Specific Conductance, Temperature, and Salinity.

2-78

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 8000 7000 Specific Conductance (µS/cm) 6000 5000 4000 3000 2000 1000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 4 16 3

Salinity (PSS-78) 2 1

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-10. TPSWC-2 Specific Conductance, Temperature, and Salinity.

2-79

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 25000 Specific Conductance (µS/cm) 20000 15000 10000 5000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 16 16 12 Salinity (PSS-78) 8 4

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-11. TPSWC-3 Specific Conductance, Temperature, and Salinity.

2-80

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 28 27 Temperature (oC) 26 25 24 80 23 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.2-12. TPSWC-4 Specific Conductance, Temperature, and Salinity .

2-81

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 28 27 Temperature (oC) 26 25 24 80 23 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.2-13. TPSWC-5 Specific Conductance, Temperature, and Salinity.

2-82

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-14. TPSWCCS-1 Specific Conductance, Temperature, and Salinity.

2-83

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-15. TPSWCCS-2 Specific Conductance, Temperature, and Salinity.

2-84

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-16. TPSWCCS-3 Specific Conductance, Temperature, and Salinity.

2-85

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-17. TPSWCCS-4 Specific Conductance, Temperature, and Salinity.

2-86

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-18. TPSWCCS-5 Specific Conductance, Temperature, and Salinity.

2-87

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-19. TPSWCCS-6 Specific Conductance, Temperature, and Salinity.

2-88

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-20. TPSWCCS-7 Specific Conductance, Temperature, and Salinity.

2-89

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-21. TPSWID-1 Specific Conductance, Temperature, and Salinity.

2-90

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-22. TPSWID-2 Specific Conductance, Temperature, and Salinity.

2-91

FPL-014B FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-23. TPSWID-3 Specific Conductance, Temperature, and Salinity.

2-92

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report Docket #: 05000250 & 05000251 Exhibit #: FPL-014B-00-BD01 Identified: 1/4/2016 for Units 3 & 4 Uprate Project - October 2012 Admitted: 1/4/2016 Withdrawn: Section 2 Rejected: Stricken:

Other:

100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-14S TPGW-10D TPGW-11D TPGW-14D 28 28 27 27 (oC)

Temperature (oC) 26 26 Temperature 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-14S TPGW-10D TPGW-11D TPGW-14D Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.

2-63

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-3S TPGW-13S TPGW-5S TPGW-7S TPGW-14D TPGW-3D TPGW-13D TPGW-5D TPGW-7D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-3S TPGW-13S TPGW-5S TPGW-7S TPGW-14D TPGW-3D TPGW-13D TPGW-5D TPGW-7D Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.

2-64

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-2S TPGW-4S TPGW-9S TPGW-11D TPGW-13D TPGW-2D TPGW-4D TPGW-9D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-2S TPGW-4S TPGW-9S TPGW-11D TPGW-13D TPGW-2D TPGW-4D TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.

2-65

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-1S TPGW-6S TPGW-11D TPGW-13D TPGW-1D TPGW-6D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPGW-13S TPGW-1S TPGW-6S TPGW-11D TPGW-13D TPGW-1D TPGW-6D Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.

2-66

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-12S TPGW-13S TPGW-6S TPGW-10D TPGW-12D TPGW-13D TPGW-6D 31 31 30 30 29 29 Temperature (oC) Temperature (oC) 28 28 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-12S TPGW-13S TPGW-6S TPGW-10D TPGW-12D TPGW-13D TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.

2-67

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPGW-3S TPGW-10S TPGW-1D TPGW-2D TPGW-3D TPGW-10D TPGW-11S TPGW-12S TPGW-13S TPGW-14S TPGW-11D TPGW-12D TPGW-13D TPGW-14D 31 31 30 30 29 29 (oC)

Temperature (oC) 28 28 Temperature 27 27 26 26 25 25 24 24 23 23 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPGW-3S TPGW-10S TPGW-1D TPGW-2D TPGW-3D TPGW-10D TPGW-11S TPGW-12S TPGW-13S TPGW-14S TPGW-11D TPGW-12D TPGW-13D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS - TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.

2-68

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 100000 90000 90000 Specific Conductance (µS/cm) Specific Conductance (µS/cm) 80000 80000 70000 70000 60000 60000 50000 50000 40000 40000 30000 30000 20000 20000 10000 10000 0 0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPGW-10S TPGW-14S TPBBSW-5B TPBBSW-10B TPGW-10D TPGW-14D 34 34 30 30 (oC)

Temperature (oC) 26 26 Temperature 22 22 18 18 14 14 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-1B TPBBSW-2B TPBBSW-3B TPBBSW-4B TPBBSW-5B TPBBSW-10B TPGW-10S TPGW-14S TPBBSW-5B TPBBSW-10B TPGW-10D TPGW-14D Figure 2.1-25. Comparison of Specific Conductance and Temperature in Biscayne Bay Surface Water and Biscayne Bay Shallow and Deep Wells TPGW-10 and TPGW-14.

2-69

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 Typical automated station in the CCS. Close-up photo of automated station panel.

Top view of probes in stilling well. Biscayne Bay non-telemetry setup.

Figure 2.2-1. Automated Surface Water Stations.

2-70

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-2. TPBBSW-1 Specific Conductance, Temperature, and Salinity.

2-71

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-3. TPBBSW-2 Specific Conductance, Temperature, and Salinity.

2-72

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-4. TPBBSW-3 Specific Conductance, Temperature, and Salinity.

2-73

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-5. TPBBSW-4 Specific Conductance, Temperature, and Salinity.

2-74

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-6. TPBBSW-5 Specific Conductance, Temperature, and Salinity.

2-75

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-7. TPBBSW-10 Specific Conductance, Temperature, and Salinity.

2-76

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 70000 60000 Specific Conductance (µS/cm) 50000 40000 30000 20000 10000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 50 16 40 Salinity (PSS-78) 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-8. TPBBSW-14 Specific Conductance, Temperature, and Salinity.

2-77

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 8000 7000 Specific Conductance (µS/cm) 6000 5000 4000 3000 2000 1000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 4 16 3

Salinity (PSS-78) 2 1

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-9. TPSWC-1 Specific Conductance, Temperature, and Salinity.

2-78

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 8000 7000 Specific Conductance (µS/cm) 6000 5000 4000 3000 2000 1000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 4 16 3

Salinity (PSS-78) 2 1

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-10. TPSWC-2 Specific Conductance, Temperature, and Salinity.

2-79

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 25000 Specific Conductance (µS/cm) 20000 15000 10000 5000 0 34 32 30 Temperature (oC) 28 26 24 22 20 18 16 16 12 Salinity (PSS-78) 8 4

0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-11. TPSWC-3 Specific Conductance, Temperature, and Salinity.

2-80

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 28 27 Temperature (oC) 26 25 24 80 23 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.2-12. TPSWC-4 Specific Conductance, Temperature, and Salinity .

2-81

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 28 27 Temperature (oC) 26 25 24 80 23 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Shallow Intermediate Deep Figure 2.2-13. TPSWC-5 Specific Conductance, Temperature, and Salinity.

2-82

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-14. TPSWCCS-1 Specific Conductance, Temperature, and Salinity.

2-83

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-15. TPSWCCS-2 Specific Conductance, Temperature, and Salinity.

2-84

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-16. TPSWCCS-3 Specific Conductance, Temperature, and Salinity.

2-85

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-17. TPSWCCS-4 Specific Conductance, Temperature, and Salinity.

2-86

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-18. TPSWCCS-5 Specific Conductance, Temperature, and Salinity.

2-87

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-19. TPSWCCS-6 Specific Conductance, Temperature, and Salinity.

2-88

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Bottom Figure 2.2-20. TPSWCCS-7 Specific Conductance, Temperature, and Salinity.

2-89

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-21. TPSWID-1 Specific Conductance, Temperature, and Salinity.

2-90

FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-22. TPSWID-2 Specific Conductance, Temperature, and Salinity.

2-91

FPL-014B FPL Turkey Point Semi-Annual Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 2 100000 90000 Specific Conductance (µS/cm) 80000 70000 60000 50000 40000 30000 20000 10000 0 44 40 36 Temperature (oC) 32 28 24 20 80 16 70 60 Salinity (PSS-78) 50 40 30 20 10 0

6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Top Bottom Figure 2.2-23. TPSWID-3 Specific Conductance, Temperature, and Salinity.

2-92