ML16015A397

From kanterella
Jump to navigation Jump to search
Official Exhibit - FPL-013-00-BD01 - United States Geologic Survey Saltwater Intrusion Lines from 1951 Through 2008 (Figure from 2012 Comprehensive Pre-Uprate Monitoring Report)
ML16015A397
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/2012
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28497, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA
Download: ML16015A397 (1)


Text

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 5 5-111 Figure 5.2-23. USGS Saltwater Intrusion Lines from 1951 through 2008.

FPL-013 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-013-00-BD01 1/4/2016 1/4/2016

FPL Turkey Point Comprehensive Pre-Uprate Monitoring Report for Units 3 & 4 Uprate Project - October 2012 Section 5 5-111 Figure 5.2-23. USGS Saltwater Intrusion Lines from 1951 through 2008.

FPL-013 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-013-00-BD01 1/4/2016 1/4/2016