ML16015A190

From kanterella
Jump to navigation Jump to search
Official Exhibit - FPL-024F-00-BD01 - Turkey Point Plant; Annual Post-Uprate Monitoring Report, Units 3&4 Uprate Project (August 2014) - Pages 3-56 to 3-64
ML16015A190
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250 -LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28503
Download: ML16015A190 (9)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL-024F FP L Turk ey P oint Annual P ost-Uprate M onitoring Report Docket #: 05000250 & 05000251 Exhibit #: FPL-024F-00-BD01 Identified: 1/4/2016 for Units 3 & 4 Uprate P roject - August 2014 Admitted: 1/4/2016 Withdrawn: Section 3 Rejected: Stricken:

Other:

Figure 3.1-8. Cross Section C-C Showing Quarterly Groundwater Chloride Concentrations from June/July 2010 through June 2014.

3-56

FPL-024F FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Legend:

TPGW-1, -2, -3, -12, -14 =

TPGW-4, -5, -6 =

TPGW-7, -8, -9 =

TPGW-10, -11 =

TPGW-13 =

TPGW-L3, -L5, -G21, -G28, -G35 =

Figure 3.1-9. Tri-linear Diagram of Pre and Post-Uprate Groundwater Ionic Concentrations.

3-57

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.

3-58

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).

3-59

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).

3-60

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance

(µS/cm).

3-61

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Legend: TPBBSW = , TPSWC = , TPSWID = , TPSWCCS =

Figure 3.2-4. Tri-Linear Diagram of Surface Water Ionic Concentrations.

3-62

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-5. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Nutrients.

3-63

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-6. Nutrient Concentrations (average +/- standard error) in the BBSW, ID, SWC, and CCS for the Pre-Uprate to Post-Uprate Periods.

3-64

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 FPL-024F FP L Turk ey P oint Annual P ost-Uprate M onitoring Report Docket #: 05000250 & 05000251 Exhibit #: FPL-024F-00-BD01 Identified: 1/4/2016 for Units 3 & 4 Uprate P roject - August 2014 Admitted: 1/4/2016 Withdrawn: Section 3 Rejected: Stricken:

Other:

Figure 3.1-8. Cross Section C-C Showing Quarterly Groundwater Chloride Concentrations from June/July 2010 through June 2014.

3-56

FPL-024F FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Legend:

TPGW-1, -2, -3, -12, -14 =

TPGW-4, -5, -6 =

TPGW-7, -8, -9 =

TPGW-10, -11 =

TPGW-13 =

TPGW-L3, -L5, -G21, -G28, -G35 =

Figure 3.1-9. Tri-linear Diagram of Pre and Post-Uprate Groundwater Ionic Concentrations.

3-57

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.

3-58

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).

3-59

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).

3-60

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance

(µS/cm).

3-61

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Legend: TPBBSW = , TPSWC = , TPSWID = , TPSWCCS =

Figure 3.2-4. Tri-Linear Diagram of Surface Water Ionic Concentrations.

3-62

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-5. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Nutrients.

3-63

FP L Turk ey P oint Annual P ost-Uprate M onitoring Report for Units 3 & 4 Uprate P roject - August 2014 Section 3 Figure 3.2-6. Nutrient Concentrations (average +/- standard error) in the BBSW, ID, SWC, and CCS for the Pre-Uprate to Post-Uprate Periods.

3-64