ML16015A190
| ML16015A190 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/31/2014 |
| From: | Florida Power & Light Co |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| 50-250 -LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28503 | |
| Download: ML16015A190 (9) | |
Text
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-56 Figure 3.1-8. Cross Section C-C Showing Quarterly Groundwater Chloride Concentrations from June/July 2010 through June 2014.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-024F-00-BD01 1/4/2016 1/4/2016 FPL-024F
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-57 Legend:
TPGW-1, -2, -3, -12, -14 =
TPGW-4, -5, -6 =
TPGW-7, -8, -9 =
TPGW-10, -11 =
TPGW-13 =
TPGW-L3, -L5, -G21, -G28, -G35 =
Figure 3.1-9. Tri-linear Diagram of Pre and Post-Uprate Groundwater Ionic Concentrations.
FPL-024F
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-58 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-59 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-60 Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-61 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance
(µS/cm).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-62 Legend: TPBBSW =
, TPSWC =
, TPSWID =
, TPSWCCS =
Figure 3.2-4. Tri-Linear Diagram of Surface Water Ionic Concentrations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-63 Figure 3.2-5. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Nutrients.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-64 Figure 3.2-6. Nutrient Concentrations (average +/- standard error) in the BBSW, ID, SWC, and CCS for the Pre-Uprate to Post-Uprate Periods.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-56 Figure 3.1-8. Cross Section C-C Showing Quarterly Groundwater Chloride Concentrations from June/July 2010 through June 2014.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-024F-00-BD01 1/4/2016 1/4/2016 FPL-024F
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-57 Legend:
TPGW-1, -2, -3, -12, -14 =
TPGW-4, -5, -6 =
TPGW-7, -8, -9 =
TPGW-10, -11 =
TPGW-13 =
TPGW-L3, -L5, -G21, -G28, -G35 =
Figure 3.1-9. Tri-linear Diagram of Pre and Post-Uprate Groundwater Ionic Concentrations.
FPL-024F
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-58 Figure 3.1-10. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Groundwater Nutrient Samples from the Shallow (S) and Deep (D) Wells.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-59 Figure 3.2-1. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Chloride (mg/L).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-60 Figure 3.2-2. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Sodium (mg/L).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-61 Figure 3.2-3. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Specific Conductance
(µS/cm).
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-62 Legend: TPBBSW =
, TPSWC =
, TPSWID =
, TPSWCCS =
Figure 3.2-4. Tri-Linear Diagram of Surface Water Ionic Concentrations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-63 Figure 3.2-5. Range (pre-Uprate) and Results (post-Uprate) of Quarterly Surface Water Samples for Nutrients.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 3 3-64 Figure 3.2-6. Nutrient Concentrations (average +/- standard error) in the BBSW, ID, SWC, and CCS for the Pre-Uprate to Post-Uprate Periods.