Official Exhibit - FPL-024B-00-BD01 - Turkey Point Plant; Annual Post-Uprate Monitoring Report, Units 3 & 4 Uprate Project (August 2014)- Pages 2-60 to 2-94
ML16015A185
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28503
Download: ML16015A185 (35)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-60 Figure 2.2-2. TPBBSW-1 Specific Conductance and Temperature.

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-024B-00-BD01 1/4/2016 1/4/2016 FPL-024B

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-61 Figure 2.2-3. TPBBSW-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-62 Figure 2.2-4. TPBBSW-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-63 Figure 2.2-5. TPBBSW-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-64 Figure 2.2-6. TPBBSW-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-65 Figure 2.2-7. TPBBSW-10 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-66 Figure 2.2-8. TPBBSW-14 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-67 Figure 2.2-9. TPSWC-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-68 Figure 2.2-10. TPSWC-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-69 Figure 2.2-11. TPSWC-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-70 Figure 2.2-12. TPSWC-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-71 Figure 2.2-13. TPSWC-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-72 Figure 2.2-14. TPSWCCS-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-73 Figure 2.2-15. TPSWCCS-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-74 Figure 2.2-16. TPSWCCS-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-75 Figure 2.2-17. TPSWCCS-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-76 Figure 2.2-18. TPSWCCS-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-77 Figure 2.2-19. TPSWCCS-6 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-78 Figure 2.2-20. TPSWCCS-7 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-79 Figure 2.2-21. TPSWID-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-80 Figure 2.2-22. TPSWID-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-81 Figure 2.2-23. TPSWID-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-82 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-83 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelsius) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-84 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-85 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-86 Figure 2.2-28. Comparison of Specific Conductance in CCS and Biscayne Bay Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-87 Figure 2.2-29. Comparison of CCS and Biscayne Bay Specific Conductance - Pre-and Post-Uprate.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-88 Figure 2.2-30. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-89 Figure 2.2-31. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-90 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-91 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-92 Figure 2.2-34. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-93 Figure 2.2-35. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values).

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-94 Figure 2.2-36. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-60 Figure 2.2-2. TPBBSW-1 Specific Conductance and Temperature.

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)

ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

FPL-024B-00-BD01 1/4/2016 1/4/2016 FPL-024B

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-61 Figure 2.2-3. TPBBSW-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-62 Figure 2.2-4. TPBBSW-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-63 Figure 2.2-5. TPBBSW-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-64 Figure 2.2-6. TPBBSW-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-65 Figure 2.2-7. TPBBSW-10 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-66 Figure 2.2-8. TPBBSW-14 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-67 Figure 2.2-9. TPSWC-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-68 Figure 2.2-10. TPSWC-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-69 Figure 2.2-11. TPSWC-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-70 Figure 2.2-12. TPSWC-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-71 Figure 2.2-13. TPSWC-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-72 Figure 2.2-14. TPSWCCS-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-73 Figure 2.2-15. TPSWCCS-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-74 Figure 2.2-16. TPSWCCS-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-75 Figure 2.2-17. TPSWCCS-4 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-76 Figure 2.2-18. TPSWCCS-5 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-77 Figure 2.2-19. TPSWCCS-6 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-78 Figure 2.2-20. TPSWCCS-7 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-79 Figure 2.2-21. TPSWID-1 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-80 Figure 2.2-22. TPSWID-2 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-81 Figure 2.2-23. TPSWID-3 Specific Conductance and Temperature.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-82 Figure 2.2-24. Average and Standard Deviation of Specific Conductance Values (in µS/cm) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-83 Figure 2.2-25. Average and Standard Deviation of Temperature (in oCelsius) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-84 Figure 2.2-26. Average and Standard Deviation of Salinity (in PSS-78) for Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-85 Figure 2.2-27. Comparison of Specific Conductance in Biscayne Bay Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-86 Figure 2.2-28. Comparison of Specific Conductance in CCS and Biscayne Bay Surface Water Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-87 Figure 2.2-29. Comparison of CCS and Biscayne Bay Specific Conductance - Pre-and Post-Uprate.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-88 Figure 2.2-30. Comparison of Specific Conductance and Temperature in L-31E Canal for Top and Bottom Locations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-89 Figure 2.2-31. Comparison of Specific Conductance and Temperature in Interceptor Ditch Stations for Top and Bottom Locations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-90 Figure 2.2-32. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect A Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-91 Figure 2.2-33. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect C Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-92 Figure 2.2-34. Comparison of Specific Conductance and Temperature at the Bottom of Interceptor Ditch Operation Transect E Stations.

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-93 Figure 2.2-35. Biscayne Bay Surface Water Temperatures (24-Hour Averages) and Ambient Air Temperature (Maximum and Minimum Values).

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-94 Figure 2.2-36. Differences among Ambient Air, CCS, and Biscayne Bay Water Temperatures.