ML16011A024

From kanterella
Jump to navigation Jump to search
Comment (31) of Anonymous Individual Opposing DTE Electric Company; Fermi 2 Nuclear Power Plant; Issuance of Draft Environmental Impact Statement Extension for 20 Years
ML16011A024
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/20/2015
From:
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
80FR68881 00031, NRC-2014-0109
Download: ML16011A024 (1)


Text

Page 1 of 1 As of: 1/6/16 1:04 PM Received:

December 20, 2015 PUBLC S BMISIONStatus:

PendingPost Tracking No. ljz-8mx7-iswt Comments Due: December 28, 2015 Submission Type: Web Docket: NRC-2014-0109 License Renewal Application; Fermi 2 (!./Comment On: NRC-2014-0109-0033 DTE Electric Company; Fermi 2 Nuclear Power Plant; Issuance of Draft Environmental Impact Statement Document:

NRC-2014-0109-DRAFT-0043 Comment on FR Doc # 20 15-28265 Submitter Information Name: Anonymous Anonymous

...... .':,:'-... ... .... ...I -General Comment t =I urge you to reject the proposed extension of the license to operate Fermi 2 (Monroe, MI), is set to expire in 2025.Actual demand for electricity in Michigan has declined, not grown, since 2007. Michigan does not need electricity from Fermi 2, nor from the proposed Fermi 3 reactor.The GELS is flawed in a number of ways. It dismisses any viable alternative to nuclear reactors; the outdated GELS ignores recent advances in renewable energy and the potential for increased efficiency in the residential, commercial and industrial-sectors.

The extension would put at risk the shallow, warmest part of the Great Lakes, western Lake Erie, with thermal and radioactive discharges.

In addition, the GE Mark 1 Boiling Water Reactor (BWR), of which Fermi 2 is one example, has serious design flaws which increase the probability of catastrophic failure. Emergency planning for regional evacuation is completely inadequate.

A 50-mile evacuation zone should be the basis of planning, as evidenced by NRC evaluation of the Fukushima disaster.

The lessons of the Fukushima nuclear disaster (according to the NRC task force on this issue) have not been applied to Fermi 2, and there are no plans to apply those lessons.SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 file :///C:/Users/CAG/Documents/XPMigratedFolders/PRM-20-28/NRC-20 14-01 09-DRAFT-0043 .html 10621 01/06/2016 Page 1 of 1 As of: 1/6/16 1:04 PM Received:

December 20, 2015 PUBLC S BMISIONStatus:

PendingPost Tracking No. ljz-8mx7-iswt Comments Due: December 28, 2015 Submission Type: Web Docket: NRC-2014-0109 License Renewal Application; Fermi 2 (!./Comment On: NRC-2014-0109-0033 DTE Electric Company; Fermi 2 Nuclear Power Plant; Issuance of Draft Environmental Impact Statement Document:

NRC-2014-0109-DRAFT-0043 Comment on FR Doc # 20 15-28265 Submitter Information Name: Anonymous Anonymous

...... .':,:'-... ... .... ...I -General Comment t =I urge you to reject the proposed extension of the license to operate Fermi 2 (Monroe, MI), is set to expire in 2025.Actual demand for electricity in Michigan has declined, not grown, since 2007. Michigan does not need electricity from Fermi 2, nor from the proposed Fermi 3 reactor.The GELS is flawed in a number of ways. It dismisses any viable alternative to nuclear reactors; the outdated GELS ignores recent advances in renewable energy and the potential for increased efficiency in the residential, commercial and industrial-sectors.

The extension would put at risk the shallow, warmest part of the Great Lakes, western Lake Erie, with thermal and radioactive discharges.

In addition, the GE Mark 1 Boiling Water Reactor (BWR), of which Fermi 2 is one example, has serious design flaws which increase the probability of catastrophic failure. Emergency planning for regional evacuation is completely inadequate.

A 50-mile evacuation zone should be the basis of planning, as evidenced by NRC evaluation of the Fukushima disaster.

The lessons of the Fukushima nuclear disaster (according to the NRC task force on this issue) have not been applied to Fermi 2, and there are no plans to apply those lessons.SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 file :///C:/Users/CAG/Documents/XPMigratedFolders/PRM-20-28/NRC-20 14-01 09-DRAFT-0043 .html 10621 01/06/2016