MONTHYEARAEP-NRC-2024-62, Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask2024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring IR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump 2024-08-08
[Table view] |
Text
INDIA NA MICHIGAN POWER°A unit of American Electric Power December 17, 2015 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 IndianaMichiga nPower.oom AEP-N RC-2015-1 18 10 CFR 50.4 Docket No.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC, 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Correction of Commitment Language
Reference:
Letter from J. P. Gebbie, Indiana Michigan Power, to U. S. Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, License Amendment Request to Adopt TSTF-425-A, Revision 3, 'Relocate Surveillance Frequencies to Licensee Control -Risk Informed Technical Specification Task Force (RITSTF) Initiative 5B'," dated November 19, 2015.In the above referenced letter, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant, introduced an erroneous reference to an enclosure in the Regulatory Commitment Table (Enclosure 11). Specifically, the first commitment states: "Implement the resolution for the following Supporting Requirements from Enclosure 9, .." The commitment should state: "Implement the resolution for the following Supporting Requirements from Enclosure 3,...Enclosure 1 to this letter provides an affirmation.
Enclosure 2 provides a revised Enclosure 11 to the referenced letter which supersedes the previous Enclosure 11 in its entirety.Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely, Joel P. Gebbie Site Vice President DB/ams
Enclosures:
- 1. Affirmation
- 2. Revision to Enclosure 11 to AEP-NRC-2015-46 U. S. Nuclear Regulatory Commission.
AEP-NRC-2015-1 18 Page 2 c: R. J. Ancona, MPSC A. W. Dietrich, NRC Washington DC MDEQ- RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson
-AEP Ft. Wayne, wlo enclosures Enclosure I to AEP-NRC-2015-118 AFFIRMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS \-\ DAY My Commission Expires N-%'k \DANIELLE BURGOYNE Notary Public. State of Michigan county of Berrien My commission Expires 04-04-2018 Acting In the County of Enclosure 2 to AEP-NRC-2015-118 Revision to Enclosure 11 to AEP-NRC-2015-46 REGULATORY COMMITMENTS The following table identifies an action committed to by Indiana Michigan Power Company (I&M)in this document.
Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the U. S. Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
All commitments discussed in this table are one-time commitments.
Commitment Scheduled Completion Date (if applicable)
Implement the resolution for the following Supporting Requirements Prior to program from Enclosure 3, Technical Adequacy Justification Table: implementation SY-B10, HR-G4, DA-C15, IFSN-A16, IFSN-A17, IFEV-A8, and IFQU-A3 Re-integrated the Fire Probabilistic Risk Assessment (PRA) model Prior to program with the Internal Events PRA model. implementation The Computer Aided Fault Tree Analysis (CAFTA) platform will be Prior to program implemented for the Internal Events PRA Model of Record, implementation INDIA NA MICHIGAN POWER°A unit of American Electric Power December 17, 2015 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 IndianaMichiga nPower.oom AEP-N RC-2015-1 18 10 CFR 50.4 Docket No.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC, 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Correction of Commitment Language
Reference:
Letter from J. P. Gebbie, Indiana Michigan Power, to U. S. Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2, License Amendment Request to Adopt TSTF-425-A, Revision 3, 'Relocate Surveillance Frequencies to Licensee Control -Risk Informed Technical Specification Task Force (RITSTF) Initiative 5B'," dated November 19, 2015.In the above referenced letter, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant, introduced an erroneous reference to an enclosure in the Regulatory Commitment Table (Enclosure 11). Specifically, the first commitment states: "Implement the resolution for the following Supporting Requirements from Enclosure 9, .." The commitment should state: "Implement the resolution for the following Supporting Requirements from Enclosure 3,...Enclosure 1 to this letter provides an affirmation.
Enclosure 2 provides a revised Enclosure 11 to the referenced letter which supersedes the previous Enclosure 11 in its entirety.Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely, Joel P. Gebbie Site Vice President DB/ams
Enclosures:
- 1. Affirmation
- 2. Revision to Enclosure 11 to AEP-NRC-2015-46 U. S. Nuclear Regulatory Commission.
AEP-NRC-2015-1 18 Page 2 c: R. J. Ancona, MPSC A. W. Dietrich, NRC Washington DC MDEQ- RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson
-AEP Ft. Wayne, wlo enclosures Enclosure I to AEP-NRC-2015-118 AFFIRMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS \-\ DAY My Commission Expires N-%'k \DANIELLE BURGOYNE Notary Public. State of Michigan county of Berrien My commission Expires 04-04-2018 Acting In the County of Enclosure 2 to AEP-NRC-2015-118 Revision to Enclosure 11 to AEP-NRC-2015-46 REGULATORY COMMITMENTS The following table identifies an action committed to by Indiana Michigan Power Company (I&M)in this document.
Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the U. S. Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.
All commitments discussed in this table are one-time commitments.
Commitment Scheduled Completion Date (if applicable)
Implement the resolution for the following Supporting Requirements Prior to program from Enclosure 3, Technical Adequacy Justification Table: implementation SY-B10, HR-G4, DA-C15, IFSN-A16, IFSN-A17, IFEV-A8, and IFQU-A3 Re-integrated the Fire Probabilistic Risk Assessment (PRA) model Prior to program with the Internal Events PRA model. implementation The Computer Aided Fault Tree Analysis (CAFTA) platform will be Prior to program implemented for the Internal Events PRA Model of Record, implementation