Commitment to Maintain Severe Accident Management Guidelines
ML15351A453
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 12/17/2015
From: O'Connor T
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-XE-15-019
Download: ML15351A453 (4)


Text

414 Nicollet Mall - MP4 Minneapolis, MN 55401 December 17, 2015 L-XE-15-019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282 and 50-306 Renewed License No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Commitment to Maintain Severe Accident Management Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, commitments related to SAMGs for the Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP). These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

It is expected that NRC staff personnel will conduct periodic inspections of the MNGP and PINGP SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. NSPM also understands that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.

Should you have any questions concerning the content of this letter, please contact John Callahan, Manager - Emergency Preparedness, (612) 330-2879.

Document Control Desk Page 2 Summary of Commitments The new SAMG co rliftments  ;

are listed in Enclosures 1 and 2.

JJ .* /

?/~ ..:i///

/

. ~ jA /

"VJ / i[(!~~~*-l y;.d. O'Connor Seni~~;x/ice President and Chief Nuclear Officer t

North~rn States Power Company-Minnesota Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC

ENCLOSURE 1 LIST OF REGULATORY COMMITMENTS - PRAIRIE ISLAND NUCLEAR GENERATING PLANT The following table identifies those actions committed to by Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, for the Prairie Island Nuclear Generating Plant (PINGP). Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One)

SCHEDULED COMMITMENT ONE- COMPLETION CONTINUING DATE TIME COMPLIANCE ACTION NSPM will consider the PINGP X October 31, 2016 SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.

NSPM will update the PINGP X Within 2 refueling SAMGs to future revisions of the outages or 3 years of Pressurized Water Reactor Owners the publication date Group generic severe accident of the guidelines, technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.

ENCLOSURE 2 LIST OF REGULATORY COMMITMENTS - MONTICELLO NUCLEAR GENERATING PLANT The following table identifies those actions committed to by Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, for the Monticello Nuclear Generating Plant (MNGP) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One)

SCHEDULED COMMITMENT ONE- COMPLETION CONTINUING DATE TIME COMPLIANCE ACTION NSPM will consider the MNGP X October 31, 2016 SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.

NSPM will update the MNGP X June 30, 2017 SAMGs to revision 3 of the Boiling Water Reactor Owners Group (BWROG) generic severe accident guidelines (published February, 2013).

NSPM will update the MNGP X Within 2 refueling SAMGs to future revisions of the outages or 3 years BWROG generic severe accident of the publication technical guidelines, and the date of the SAMGs will be integrated with other guidelines, emergency response guideline sets whichever is greater and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.1 1 - Use of NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.

414 Nicollet Mall - MP4 Minneapolis, MN 55401 December 17, 2015 L-XE-15-019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282 and 50-306 Renewed License No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Commitment to Maintain Severe Accident Management Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, commitments related to SAMGs for the Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant (PINGP). These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.

It is expected that NRC staff personnel will conduct periodic inspections of the MNGP and PINGP SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. NSPM also understands that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.

Should you have any questions concerning the content of this letter, please contact John Callahan, Manager - Emergency Preparedness, (612) 330-2879.

Document Control Desk Page 2 Summary of Commitments The new SAMG co rliftments  ;

are listed in Enclosures 1 and 2.

JJ .* /

?/~ ..:i///

/

. ~ jA /

"VJ / i[(!~~~*-l y;.d. O'Connor Seni~~;x/ice President and Chief Nuclear Officer t

North~rn States Power Company-Minnesota Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC

ENCLOSURE 1 LIST OF REGULATORY COMMITMENTS - PRAIRIE ISLAND NUCLEAR GENERATING PLANT The following table identifies those actions committed to by Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, for the Prairie Island Nuclear Generating Plant (PINGP). Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One)

SCHEDULED COMMITMENT ONE- COMPLETION CONTINUING DATE TIME COMPLIANCE ACTION NSPM will consider the PINGP X October 31, 2016 SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.

NSPM will update the PINGP X Within 2 refueling SAMGs to future revisions of the outages or 3 years of Pressurized Water Reactor Owners the publication date Group generic severe accident of the guidelines, technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.

ENCLOSURE 2 LIST OF REGULATORY COMMITMENTS - MONTICELLO NUCLEAR GENERATING PLANT The following table identifies those actions committed to by Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, for the Monticello Nuclear Generating Plant (MNGP) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One)

SCHEDULED COMMITMENT ONE- COMPLETION CONTINUING DATE TIME COMPLIANCE ACTION NSPM will consider the MNGP X October 31, 2016 SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.

NSPM will update the MNGP X June 30, 2017 SAMGs to revision 3 of the Boiling Water Reactor Owners Group (BWROG) generic severe accident guidelines (published February, 2013).

NSPM will update the MNGP X Within 2 refueling SAMGs to future revisions of the outages or 3 years BWROG generic severe accident of the publication technical guidelines, and the date of the SAMGs will be integrated with other guidelines, emergency response guideline sets whichever is greater and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.1 1 - Use of NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.