MONTHYEARML16021A1952015-12-29029 December 2015 Official Exhibit - NRC-002-R-MA-CM01 - Shine Medical Technologies, Inc., Medical Isotope Production Facility Draft Construction Permit ML16021A1942015-12-29029 December 2015 Official Exhibit - NRC-014-MA-CM01 - NRC Staff Responses to Post-Hearing Questions ML16021A1932015-12-22022 December 2015 Official Exhibit - SHN-030-MA-CM01 - Shine Response to Commission Post Hearing Questions ML15351A2812015-12-15015 December 2015 Official Exhibit - SHN-026-MA-CM01 - Shine Overview Panel Presentation ML15351A2822015-12-15015 December 2015 Official Exhibit - SHN-027-MA-CM01 - Shine Presentation Slides: Safety Panel 1 ML15351A2842015-12-15015 December 2015 Official Exhibit - SHN-028-MA-CM01 - Shine Presentation Slides: Safety Panel 2 ML15351A2512015-12-11011 December 2015 Official Exhibit - NRC-012-R-MA-CM01 - Staff Presentation Slides - Safety Panel 2 (December 8, 2015, Corrected Exhibit Filed December 11, 2015) ML15351A2492015-12-0808 December 2015 Official Exhibit - NRC-006R-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Environmental Report, (PSAR) Chapter 19, Figure 19.5.2-6 Through Figure 19.5.2-9 (August 27, 2015) ML15351A2242015-12-0808 December 2015 Official Exhibit - NRC-004-R-MA-CM01 - NRC Staff Responses to Commission Pre-Hearing Questions, (Originally Filed on November 24, 2015), (Revised December 8, 2015) ML15351A2372015-12-0808 December 2015 Official Exhibit - NRC-006L-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Environmental Report, (PSAR) Chapter 19, Figure 19.3.2-1 Through Figure 19.3.2-36 (August 27, 2015) ML15351A2302015-12-0808 December 2015 Official Exhibit - NRC-008-MA-CM01 - Safety Evaluation Report Related to Shine Medical Technologies, Inc. Construction Permit Application for a Medial Radioisotope Production Facility, (Revised December 8, 2015) ML15351A2272015-12-0808 December 2015 Official Exhibit - NRC-002-MA-CM01 - Draft Construction Permit for Shine Medical Technologies, Inc. (December 8, 2015) ML15351A2532015-12-0808 December 2015 Official Exhibit - SHN-002-MA-CM01 - Shine Medical Technologies, Inc.'S Responses to Commission'S Public Pre-Hearing Questions ML15351A2552015-12-0808 December 2015 Official Exhibit - SHN-004-MA-CM01 - Statement of Qualifications of Joseph M. Aldieri ML15351A2562015-12-0808 December 2015 Official Exhibit - SHN-005-MA-CM01 - Statement of Qualifications of Jeffrey M. Bartelme ML15351A2572015-12-0808 December 2015 Official Exhibit - SHN-014-MA-CM01 - Statement of Qualifications of James W. Mcintyre ML15351A2582015-12-0808 December 2015 Official Exhibit - SHN-015-MA-CM01 - Statement of Qualifications of John B. Mclean ML15351A2592015-12-0808 December 2015 Official Exhibit - SHN-016-MA-CM01 - Statement of Qualifications of William D. Newmyer ML15351A2602015-12-0808 December 2015 Official Exhibit - SHN-017-MA-CM01 - Statement of Qualifications of Greg Piefer ML15351A2622015-12-0808 December 2015 Official Exhibit - SHN-018-MA-CM01 - Statement of Qualifications of Katrina M. Pitas ML15351A2632015-12-0808 December 2015 Official Exhibit - SHN-019-MA-CM01 - Statement of Qualifications of Erwin T. Prater ML15351A2642015-12-0808 December 2015 Official Exhibit - SHN-020-MA-CM01 - Statement of Qualifications of Louis Restrepo ML15351A2652015-12-0808 December 2015 Official Exhibit - SHN-021-MA-CM01 - Statement of Qualifications of Eric N. Van Abel ML15351A2782015-12-0808 December 2015 Official Exhibit - SHN-011-MA-CM01 - Statement of Qualifications of Timothy P. Krause ML15351A2912015-12-0808 December 2015 Official Exhibit - NRC-010-MA-CM01 - Staff Presentation Slides - Overview (December 8, 2015) ML15351A2922015-12-0808 December 2015 Official Exhibit - NRC-011-MA-CM01 - Staff Presentation Slides - Safety Panel 1( December 8, 2015) ML15351A2932015-12-0808 December 2015 Official Exhibit - NRC-013-MA-CM01 - Staff Presentation Slides - Environmental Panel (December 8, 2015) ML15351A2852015-12-0808 December 2015 Official Exhibit - SHN-029-MA-CM01 - Shine Presentation Slides: Environmental Panel ML15351A2662015-12-0808 December 2015 Official Exhibit - SHN-022-MA-CM01 - Statement of Qualifications of George F. Vandergrift ML15351A2802015-12-0808 December 2015 Official Exhibit - SHN-013-MA-CM01 - Statement of Qualifications of C. Michael Launi ML15351A2792015-12-0808 December 2015 Official Exhibit - SHN-012-MA-CM01 - Statement of Qualifications of Thomas Krzewinski ML15351A2772015-12-0808 December 2015 Official Exhibit - SHN-010-MA-CM01 - Statement of Qualifications of Catherine Kolb ML15351A2752015-12-0808 December 2015 Official Exhibit - SHN-009-MA-CM01 - Statement of Qualifications of Alan Hull ML15351A2742015-12-0808 December 2015 Official Exhibit - SHN-008-MA-CM01 - Statement of Qualifications of William Hennessy ML15351A2732015-12-0808 December 2015 Official Exhibit - SHN-007-MA-CM01 - Statement of Qualifications of James Costedio ML15351A2722015-12-0808 December 2015 Official Exhibit - SHN-025-MA-CM01 - Statement of Qualifications of Steven L. Zander ML15351A2712015-12-0808 December 2015 Official Exhibit - SHN-024-MA-CM01 - Statement of Qualifications of Ernest Wright ML15351A2702015-12-0808 December 2015 Official Exhibit - SHN-006-MA-CM01 - Statement of Qualifications of Richard Vann Bynum ML15351A2692015-12-0808 December 2015 Official Exhibit - SHN-023-MA-CM01 - Statement of Qualifications of Tamela B. Wheeler ML15351A2522015-11-24024 November 2015 Official Exhibit - SHN-001-MA-CM01 - Applicant'S Pre-Filed Testimony of James Costedio for the Mandatory Hearing on Uncontested Issues for the Shine Medical Technologies, Inc. Medical Radioisotope Production Facility ML15351A2282015-11-17017 November 2015 Official Exhibit - NRC-003-MA-CM01 - Draft Record of Decision for Shine Medical Technologies, Inc. Construction Permit Application (November 17, 2015) ML15351A2312015-10-31031 October 2015 Official Exhibit - NRC-009-MA-CM01 - NUREG-2183, Final Environmental Impact Statement for the Construction Permit for the Shine Medical Radioisotope Production Facility (October 16, 2015) ML15351A2262015-10-22022 October 2015 Official Exhibit - NRC-001-MA-CM01 - SECY-15-0130, Staff Statement in Support of the Uncontested Hearing for Issuance of Construction Permit for the Shine Medical Technologies, Inc. Medical Radioisotope Production Facility (October 22, 2015 ML15351A2412015-09-16016 September 2015 Official Exhibit - NRC-006B-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Updated General Information (September 16, 2015) ML15351A2442015-08-27027 August 2015 Official Exhibit - NRC-006E-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application, (Psar), Chapter 2, Figure 2.5-1 Through Figure 2.5-6 (August 27, 2015) ML15351A2432015-08-27027 August 2015 Official Exhibit - NRC-006D-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - (Psar), Chapter 2, Figure 2.4-1 Through Figure 2.4-11 (August 27, 2015) ML15351A2452015-08-27027 August 2015 Official Exhibit - NRC-006N-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Environmental Report, Chapter 19 Figure 19.3.4-1 to Chapter 19 Figure 19.3.4-8 (August 27, 2015) ML15351A2392015-08-27027 August 2015 Official Exhibit - NRC-006M-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Environmental Report, (PSAR) Chapter 19, Figure 19.3.3-1 Through Figure 19.3.3-7 (August 27, 2015) ML15351A2462015-08-27027 August 2015 Official Exhibit - NRC-006O-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application, Environmental Report, (PSAR) Chapter 19 Figure 19.3.5-1 Through Figure 19.3.8-2 (August 27, 2015) ML15351A2352015-08-27027 August 2015 Official Exhibit - NRC-006K-MA-CM01 - Shine Medical Technologies, Inc., Construction Permit Application - Environmental Report, (PSAR) Chapter 19 Figure 19.3.1-7 Through Figure 19.3.1-9 (August 27, 2015) 2015-09-16
[Table view] |
Text
Exhibit SHN-004 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: SHINE MEDICAL TECHNOLOGIES, INC.
(Medical Radioisotope Production Facility)
Joseph M. Aldieri Commission Mandatory Hearing Senior Consultant - Fire Protection Docket #: 05000608 Exhibit #: SHN-004-MA-CM01 Identified: 12/15/2015 Sargent & Lundy, LLC Admitted: 12/15/2015 Withdrawn:
Rejected: Stricken:
Other:
Education:
Lowell Technological Institute, B.S. Nuclear Engineering - 1974 Hartford State Technical College, A.A.S., Nuclear Engineering - 1971 Mr. Aldieri has over 35 years of experience in fire protection at both nuclear and fossil power plants. He is the head of the S&L fire protection group and has been involved in NFPA 805 analysis (lead the S&L effort at Palisades), fire protection modification packages (fire detection and suppression modification and replacement, fire main piping replacement, fire seal installation and other fire barrier modification and installation, and fire protection design at new nuclear facilities (South Texas, PBMR) and various fossil power plants, and substations. He has also been involved in inspection of fire protection programs and development and revision of fire protection program procedures.
Exhibit SHN-004 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: SHINE MEDICAL TECHNOLOGIES, INC.
(Medical Radioisotope Production Facility)
Joseph M. Aldieri Commission Mandatory Hearing Senior Consultant - Fire Protection Docket #: 05000608 Exhibit #: SHN-004-MA-CM01 Identified: 12/15/2015 Sargent & Lundy, LLC Admitted: 12/15/2015 Withdrawn:
Rejected: Stricken:
Other:
Education:
Lowell Technological Institute, B.S. Nuclear Engineering - 1974 Hartford State Technical College, A.A.S., Nuclear Engineering - 1971 Mr. Aldieri has over 35 years of experience in fire protection at both nuclear and fossil power plants. He is the head of the S&L fire protection group and has been involved in NFPA 805 analysis (lead the S&L effort at Palisades), fire protection modification packages (fire detection and suppression modification and replacement, fire main piping replacement, fire seal installation and other fire barrier modification and installation, and fire protection design at new nuclear facilities (South Texas, PBMR) and various fossil power plants, and substations. He has also been involved in inspection of fire protection programs and development and revision of fire protection program procedures.