ISFSI - Notification of Inspection and Request for Information
ML15350A386
Person / Time
Site: Summer, 07201038  South Carolina Electric & Gas Company icon.png
Issue date: 12/16/2015
From: Sandra Walker
NRC/RGN-II/DRS/EB3
To: Gatlin T
South Carolina Electric & Gas Co
Linda Gruhler 404-997-4633
References
Download: ML15350A386 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 16, 2015 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 (Mail Code 800)

Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Gatlin:

From January 25 through April 4, 2016, the U.S. Nuclear Regulatory Commission (NRC) will perform an inspection of the independent spent fuel storage installation (ISFSI) Dry Run activities at the Virgil C. Summer Nuclear Station, Unit 1, using NRC Inspection Procedures 60854, 60855, 60856, and 60857. Experience has shown that this inspection is resource-intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents identify the information which the inspectors will need upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Ms. Beth Dalick of your licensing organization. Our inspection dates are subject to change based on changes to your schedule for ISFSI activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Carrion at 404-997-4522 (Robert.Carrion@nrc.gov).

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Agency Rules of Practice and Procedure, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS)

T. Gatlin 2

component of NRC's Agencywide Documents Access and Management System (ADAMS);

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Shakur A. Walker, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-395 and 072-1038 License No. NPF-12

Enclosure:

Pre-Inspection Document Request cc: Distribution via Listserv

ML15350A386 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/EB3 RII:DRS/EB3 SIGNATURE RPC1 SAW4 NAME R. Carrion S. Walker DATE 12/ 11 /2015 12/ 16 /2015 E-MAIL COPY YES NO YES NO

Enclosure PRE-INSPECTION DOCUMENT REQUEST Inspection Dates:

January 25-27, 2016 (Monday - Wednesday)

Welding/NDE Demonstration - Dry Run February 9-12, 2016 (Tuesday - Friday)

MPC Fluid Ops and Cask Drying Operations - Dry Run March 1-3, 2016 (Tuesday - Thursday)

Outside Pad Operations - Dry Run March 15-17, 2016 (Tuesday - Thursday)

Wet Operations - Dry Run March 21-April 4, 2016 (Monday - Monday)

Initial Loading Campaign Dry Run Demonstration Inspection Procedures:

IP 60854, Preoperational Testing of an Independent Spent Fuel Storage Installation IP 60856, Review of 10 CFR 72.212(b) Evaluations IP 60857, Review of 10 CFR 72.48 Evaluations Initial Loading Campaign:

IP 60855, Operation of an Independent Spent Fuel Storage Installation The following information should be made available to the Region II office by January 15, 2016, to facilitate the selection of specific items that will be reviewed during the onsite inspection weeks. The inspectors will select specific items from the information requested. We understand that any proprietary information reviewed by the inspectors will be appropriately protected against being released to the public. If the requested documents are large and only hard copy formats are available, please inform the lead inspector, Robert Carrion, and provide the subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call Robert Carrion, as soon as possible.

Information Requested for the In-Office Preparation Week Updated Schedules for Independent Spent Fuel Storage Installation Activities Procedures and Programs Independent Spent Fuel Storage Installation (ISFSI) Operational Procedures (Welding, non-destructive examination (NDE), Loading, De-watering, Backfilling, etc.)

Leak Testing Procedure for Canister Transient Combustible and Flammable Substances Program Specifically for welding/NDE:

  • Project Specific Welding Implementing Procedures

2

  • Automated Welding System Operations and Maintenance Manual
  • Welding Procedure Specifications and associated Procedure Qualifications Record for both manual and automated welding
  • Welding Personnel Certifications (for both manual and automated welding)
  • Procedure for material control
  • Drawings
  • NDE Procedures (visual examination procedure, penetrant testing Procedure, etc.)
  • NDE Personnel Certifications
  • Filler Material Procurement Specifications ISFSI-Related Evaluations Fire Hazards Evaluation for ISFSI Cask Hauling and Storage Explosion Hazards Evaluations for the ISFSI Cask Hauling and Storage Cask Transport Path Evaluation of Buried Components 50.59 Evaluations for cask system use 72.212 Evaluation 72.48 evaluations applicable to Holtec at V.C. Summer Safe Load Path Evaluation Emergency Preparedness Evaluation related to ISFSI Site-Specific Tornado Missile Evaluation for the Holtec HI-STORM 100 Radiation Protection Procedures for Fuel Assembly Selection Radiological Emergency Plan Radiation Protection (ALARA) Work Plan for ISFSI-Related Work Activities V C Summer ISFSI Dose Rate Evaluation for ISFSI Fuel Characterization and Verification Documents Training and Qualifications Training Department Lesson Packages for ISFSI Personnel Training, Certifications, and Qualification Records Corrective Action Program V.C. Summer ISFSI Program Audit List of corrective action documents (Condition Reports, etc.) related to ISFSI issues Audits and Self-Assessments QA audits for yoke, transfer cask, and any other components related to the ISFSI QA self-assessments for ISFSI Inspections of ISFSI Lifting Devices, including the spent fuel pool crane, sling, hooks, etc.

3 Ready access (i.e., copies provided to the inspector to use for the duration of the inspection at the onsite inspection location, or room number and location where available) to applicable editions of the ASME Code and Electric Power Research Institute, and industry standards referenced in the procedures used to perform the ISFSI activities.

Inspector Contact Information:

Robert Carrion Senior Reactor Inspector 404-997-4522 robert.carrion@nrc.gov Mailing Address:

US NRC Region II Attn: Robert Carrion 245 Peachtree Center Avenue NE Suite 1200 Atlanta, GA 30303 LIST OF ACRONYMS ALARA As Low As Reasonably Achievable ISFSI Independent Spent Fuel Storage Installation NDE Non-destructive Examination