ML15303A312

From kanterella
Jump to navigation Jump to search
NRC Staff Palisades Hearing File Update 3
ML15303A312
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/30/2015
From: Amitava Ghosh
NRC/OGC
To: Gary Arnold, Hirons T, Ronald Spritzer
SECY RAS
References
50-255-LA-2, ASLBP 15-939-04-LA-BD01, RAS 28448
Download: ML15303A312 (3)


Text

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 October 30, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Thomas J. Hirons Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Palisades Nuclear Plant)

Docket Nos. 50-255-LA-2

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards July 14, 2015, Initial Scheduling Order (ISO), the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that it has not identified any documents subject to disclosure in this update.

Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Jennivine K. Rankin, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by October 16, 2015.

Sincerely,

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff

Enclosures:

Affidavit of Jennivine K. Rankin cc w/Encls.: Service List

October 29, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

AFFIDAVIT OF JENNIVINE K. RANKIN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Jennivine K. Rankin, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I currently serve as a project manager for the Palisades Nuclear Plant. Among other things, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b)-(d) and 2.1203 and the Boards July 14, 2015 Initial Scheduling Order in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of October 16, 2015.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Jennivine K. Rankin Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415-1530 Email: Jennivine.Rankin@nrc.gov Executed in Rockville, Maryland this 29th day of October 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305, I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Palisades Hearing File, including Affidavit of Jennivine K. Rankin, dated October 29, 2015, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 30th day of October, 2015.

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: anita.ghosh@nrc.gov Date of signature: October 30, 2015

UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 October 30, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Thomas J. Hirons Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Palisades Nuclear Plant)

Docket Nos. 50-255-LA-2

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards July 14, 2015, Initial Scheduling Order (ISO), the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that it has not identified any documents subject to disclosure in this update.

Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Jennivine K. Rankin, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by October 16, 2015.

Sincerely,

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff

Enclosures:

Affidavit of Jennivine K. Rankin cc w/Encls.: Service List

October 29, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

AFFIDAVIT OF JENNIVINE K. RANKIN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Jennivine K. Rankin, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I currently serve as a project manager for the Palisades Nuclear Plant. Among other things, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b)-(d) and 2.1203 and the Boards July 14, 2015 Initial Scheduling Order in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of October 16, 2015.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Jennivine K. Rankin Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415-1530 Email: Jennivine.Rankin@nrc.gov Executed in Rockville, Maryland this 29th day of October 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305, I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Palisades Hearing File, including Affidavit of Jennivine K. Rankin, dated October 29, 2015, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 30th day of October, 2015.

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: anita.ghosh@nrc.gov Date of signature: October 30, 2015