Exelon Nuclear Job Performance Measure ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)

JPM Number: S-N-a Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM. for 2014 ILT NRC exam S-N-a Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the following: (IC 151 was used for validation)
  • Adjust Core flow to establish ~850 MWe.
  • Verify 95 - 100 FCL.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • None
3. Setup the following Triggers:
  • trgset 1 "ppg228 .gt. 875.0" (Activates when Generator load is > 875 MWe)
  • ior asdaemtrp (1) 2 (Trips 2A Recirc pump)

DOCUMENT PREPARATION

1. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with recirc flow.
2. A Maneuvering REMA marked up to point of raising power with recirc flow.
3. Clean copy of DOP 0202-03, Reactor Recirculation Flow Control System Operation.
4. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One or Both Pumps.

S-N-a Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
3. The TSO has requested raising Unit 2 load to 900 MWe.

INITIATING CUE

1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-a Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of:

Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps, hand him the supplied copy of it.

  • 1. Depresses one of the Panel Depresses one of the 902-5 Recirc Master Manual following Panel 902-5 Control raise speed Recirc Master Manual _____ _____ _____

pushbuttons. (Repeats this Control raise speed step to continue load pickup) pushbuttons 0.5 sec, but <

10 sec:

RAISE LOW (0.06%)

RAISE MED (0.18%)

RAISE HIGH (0.90%)

2. Verifies expected response Verifies Recirc pump after each speed bump. speeds, Core flow, Rx power and other plant _____ _____ _____

parameters change as expected.

NOTE:

An automatic Trigger is setup to trip 2A Recirc pump when Generator load reaches 875 MWe.

BEGIN ALTERNATE PATH

3. Announces 2A Recirc pump Announces 2A Recirc trip and enters DOA 0202-01, pump trip and enters DOA Recirculation (Recirc) Pump 0202-01, Recirculation _____ _____ _____

Trip - One Or Both Pumps. (Recirc) Pump Trip - One Or Both Pumps.

S-N-a Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

4. Determines operating in the Determines operating in Nominal Feedwater Heating the Nominal Feedwater Region of Figure 1, Heating Region of _____ _____ _____

Feedwater Heating Regions, Figure 1, Feedwater and goes to the Subsequent Heating Regions, and goes Operator Actions (Nominal to the Subsequent Feedwater Heating) Flow Operator Actions (Nominal Chart. Feedwater Heating) Flow Chart.

CUE:

If the Examinee begins to do any of the following from the right side of the Hardcard, inform the Examinee that as the CRS I assigned another operator to perform it:

Monitor MSL & off gas rad monitors for increased activity.

Notify QNE to monitor core parameters.

Notify Chemistry to take samples per TS and ODCM if power change was 20% thermal in one hour.

  • 5. Closes 2A Recirc Pump Rotates 2A PP DISCH discharge valve MO VLV MO 2-202-5A CCW to 2-0202-5A the CLOSE position.

Verifies the valves CLOSE _____ _____ _____

light lit and OPEN light out.

NOTE:

While waiting for the 5 minutes to elapse, the Examinee should continue with the rest of the steps.

  • 6. Inserts CRAM Rods per CRAM rods inserting with DGP 03-04 to reduce expected power reduction.

Reactor power to 35 to 40%

  • 7. After 5 minutes, opens Rotates 2A PP DISCH recirc pump discharge VLV MO 2-202-5A CW to valve previously closed. the OPEN position.

Verifies the valves OPEN _____ _____ _____

light lit and CLOSE light out.

S-N-a Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

After the insertion of several CRAM rods, as the CRS state another operator will take over inserting CRAM rods. Your task is complete.

8. Repeats back another Repeats back another operator will take over operator will take over inserting CRAM rods. My task inserting CRAM rods. My _____ _____ _____

is complete task is complete

9. Informs Evaluator the Task is Informs Evaluator the Task complete. is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-a Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)

JPM Number: S-N-a Revision Number: 00 Task Number and

Title:

202L024, Change Recirc pump speed on both Recirc pumps using ASD Tandem controls.

K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 36 minutes Actual Time Used: minutes

References:

DOP 0202-03, rev 43 and DOA 0202-01, rev 42 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-a Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
3. The TSO has requested raising Unit 2 load to 900 MWe.

INITIATING CUE

1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
2. Inform the Unit Supervisor when the task is complete.

S-N-a Page 9 of 9

Exelon Nuclear Job Performance Measure RAPIDLY SECURE THE RWCU SYSTEM WITH THE REACTOR AT PRESSURE JPM Number: S-N-b Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date S-N-b Page 1 of 9

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Update for the 2014 ILT NRC exam.

S-N-b Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC where the reactor is at or close to normal operating pressure
  • Verify the RWCU system is in normal operation with the 2A RWCU pump running.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify PIC 2-1290-2, PRESSURE CONTLR, in BAL with the MAN pot balanced.
3. Insert following Malfunctions and/or Remotes:
  • None
4. Setup the following Triggers:
  • trgset 1 "rtdmn02_drw .and. (rtwmn02 .le. 0.05)" (Activates when RWCU pressure controller is in MAN and the pot is <0.05 demand)
  • ior rtwmn02 (1) 0.0 (This overrides the demand to 0.0 since the lowest the demand goes is 0.02 which causes the RWCU system to isolate before the operator can isolate it)

DOCUMENT PREPARATION

1. A copy of DOP 1200-03, Attachment A, RWCU SYSTEM OPERATION WITH THE REACTOR AT PRESSURE.

S-N-b Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A leak is present in the U2 RWCU system.
2. RWCU Blowdown was NOT established.
3. PCV bypass 2-1201-43 is CLOSED.

INITIATING CUE

1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-b Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Pump should trip in step 1 when demand is adjusted to zero. In Step 2 action to stop pump, the Examinee should verify that the pump is tripped OR stops the pump prior to closing valves in the following steps.

This is a critical action (verify or stop pump) to prevent forcing an automatic protective action that trips the pump when the system is isolated.

1. Place PIC 2-1290-2 Rotates outer collar CW to MAN.

PRESSURE CONTLR, in Rotates inner knob CCW to zero MANUAL.

indication on horizontal indicator.

AND Annunciators 902-4 A-10, B-11, Adjust demand to zero (0) B-12 and C-12 alarm.

to close the valve. _____ _____ _____

2. Stop 2A RWCU RECIRC Verifies 2A pump tripped OR PP. Places 2A pump control switch to STOP and verifies:

Blue ON light OFF Green OFF light ON _____ _____ _____

3. Verify the following valves .

are closed:

  • MO 2-1201-1, RX Momentarily places MO OUTLET ISOL. 2-1201-1, RX OUTLET ISOL, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____
  • MO 2-1201-1A, RX Verifies MO 2-1201-1A, RX OUTLET BYP. OUTLET BYP, Green Close light ON. _____ _____ _____
  • MO 2-1201-2, INLET Momentarily places MO ISOL. 2-1201-2, INLET ISOL, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____
  • MO 2-1201-7, RX Momentarily places MO RETURN VLV. 2-1201-7, RX RETURN VLV, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____

S-N-b Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • MO 2-1201-8, RWCU Verifies MO 2-1201-8, RWCU PP PP BYP. BYP, Red Close light ON. _____ _____ _____

NOTE:

Step 4 on Hardcard is N/A as blowdown was not established (per initial conditions).

Step 5 is not an If / Then so the Examinee may verify that the actions within the step are complete.

4 WHEN flow is zero Verifies closed indication for

[FI 2-1290-13, BLOWDN valves:

FLOW], then close the

  • MO 2-1201-11, BLOWDN TO following valve(s), as CONDR.

applicable:

  • MO 2-1201-12, BLOWDN TO

BLOWDN TO CONDR.

  • MO 2-1201-12, BLOWDN TO RW VLV. _____ _____ _____

5 Close MO 2-1201-9A, A Places MO 2-1201-9A, A RWCU RWCU PP DISCH PP DISCH, control switch to CLOSE and verifies Green Closed light ON _____ _____ _____

NOTE:

Step 7 is N/A as PCV bypass is closed. (Per initial conditions).

6 Notify Chemistry that Notifies Chemistry.

RWCU has been isolated, (Noble Metals Monitor should be isolated) _____ _____ _____

CUE:

Respond that Chemistry has been notified.

NOTE:

Step 7 action is to be taken by another operator.

7 Enter substitute values for Will address entering computer computer points to ensure points.

the heat balance is accurate. _____ _____ _____

CUE:

Inform the examinee that the another NSO will enter substitute values for step 9 of the Hard Card.

S-N-b Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT Report to the Unit Reports that RWCU has been Supervisor that RWCU has secured.

been rapidly secured. _____ _____ _____

CUE:

Acknowledge the report.

END JPM Stop Time:_________

S-N-b Page 7 of 9

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

RO SRO JPM

Title:

Rapidly Secure the RWCU System with the Reactor at Pressure JPM Number: S-N-b Revision Number: 01 Task Number and

Title:

204L005, Secure the RWCU System with the reactor at pressure K/A Number and Importance: 20400A4.06 3.0/2.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: __10___minutes Actual Time Used: _______minutes

References:

DOP 1200-03, Rev 66 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

S-N-b Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A leak is present in the U2 RWCU system.
2. RWCU Blowdown was NOT established.
3. PCV bypass 2-1201-43 is CLOSED.

INITIATING CUE

1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.

S-N-b Page 9 of 9

Exelon Nuclear Job Performance Measure DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 02 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Modified for ILT 12-1 Cert Exam Revision 02 Modified for ILT 14-1 NRC Exam S-N-c Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure that Both DEHC monitors are displaying the STATUS screen.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Clean copy of DGP 02-03, Attachment F, Reactor Plant Cooldown Using Bypass valves.

S-N-c Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin an 85.0 Deg. F / hr automatic reactor cooldown to 350 Deg. F utilizing the Hardcard.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-c Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DGP 02-03.

All the below actions can be performed on either of the Digital EHC control stations.

  • 1. Select <CONTROL>. Utilizing the trackball controller, clicks on

<CONTROL>. _____ _____ _____

  • 2. Select <RX COOLDOWN>. Utilizing the trackball controller, clicks on

<COOLDOWN>. _____ _____ _____

3. Verify REACTOR Observes the REACTOR COOLDOWN is OFF. COOLDOWN OFF select button is orange. _____ _____ _____
  • 4. Select STPT/RAMP. Utilizing the trackball controller, clicks on the

<STPT/RAMP>. _____ _____ _____

  • 5. Enter desired target Clicks in the Set Point box.

temperature setpoint. Utilizing the keyboard, enters 350.0. _____ _____ _____

  • 6. Enter desired cooldown rate Clicks in the Ramp Rate in the Ramp box. box. Utilizing the keyboard, enters 85.0. _____ _____ _____
  • 7. Select <OK>... Utilizing the trackball controller, clicks on <OK>.

Clicks <OK> on the Confirm Setpoint pop up _____ _____ _____

window.

S-N-c Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 8. Initiate Reactor cooldown by Utilizing the trackball selecting ON for REACTOR controller, clicks on <ON>.

COOLDOWN.

Clicks <OK> on the Begin Reactor Cooldown pop up _____ _____ _____

window.

Verifies Cooldown occurring using any of the following:

o Recirc temperature dropping o Reactor pressure dropping.

9. On <CONTROL> If uses other DEHC

<PRESSURE CONTROL> screen, utilizing the screen, adjust pressure trackball controller, clicks setpoint as necessary to on <CONTROL>.

maintain at least 50 psig above Reactor pressure. Utilizing the trackball _____ _____ _____

controller, clicks on

<PRESSURE CONTROL>.

10. On <CONTROL> <BPV If uses other DEHC JACK> screen, verify BPV screen, utilizing the Jack position setpoint is trackball controller, clicks

-5.0%. on <CONTROL>.

Utilizing the trackball controller, clicks on < BPV JACK >. _____ _____ _____

Observes BPV Jack position setpoint is -5.0%.

11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

S-N-c Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT END JPM Stop Time:_________

S-N-c Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES Revision Number: 02 JPM Number: S-N-c Task Number and

Title:

29501LP040, Respond to a Reactor Scram IAW DGP 02-03.

K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DGP 02-03, rev 104 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-c Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin an 85.0 Deg. F / hr automatic reactor cooldown to 350 Deg. F utilizing the Hardcard.
2. Inform the Unit Supervisor when the task is complete.

S-N-c Page 9 of 9

Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 08 Date: 1/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 12-1 Cert Exam.

Revision 08 Revised for ILT 14-1 NRC Exam.

S-N-d Page 2 of 12

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify NO LPCI pumps operating.
3. Insert following Malfunctions and/or Remotes:
  • Setup Trigger 15 to open 2C LPCI PP suction to CST: irf lpcstppc (15) true
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.

S-N-d Page 3 of 12

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.

Examiner Note: The following parameters do not match the simulator indications.

3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST and inject to raise RPV water level per DEOP 0500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-d Page 4 of 12

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

1. Place 2A LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

2. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5A control switch in Manual Bypass and verify _____ _____ _____

closed.

3. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13A closed if not needed. _____ _____ _____

CUE:

2-1501-13A is not required for 2B LPCI pump.

NOTE:

The following valves may be verified in any order

4. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____

5. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A closed. _____ _____ _____

6. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A closed. _____ _____ _____

7. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____

8. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B closed. _____ _____ _____

S-N-d Page 5 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

9. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B closed. _____ _____ _____

NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

CUE:

When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.

10. Unlock AND open 2-1501- Instructs EO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a).

VENT VLV.

11. Crack open 2-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).

flow is observed from pipe. _____ _____ _____

12. Close 2(3)-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c).
13. Close AND lock 2-1501-74A, Instructs EO to complete U2(3) LPCI A PMP step G.12.c.(5).(d).

VENT VLV.

14. Open 2-1501-47A-R, U2 Instructs EO to obtain PI 2-LPCI A PUMP SUCT PI 1501-47A reading per step 2-1501-47A ROOT VLV (at G.12.c.(6). & G.12.c.(7). _____ _____ _____

pump) and verify PI 2-1501-47A indicates less than 15 psig.

CUE:

PI 2-1501-47A indicates 15.5 psig.

15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.

S-N-d Page 6 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

16. Close 2-1501-47A-R, U2 Instructs EO to close 2-LPCI A PUMP SUCT PI 1501-47A per step G.12.c.(8). _____ _____ _____

2-1501-47A ROOT VLV.

CUE:

2-1501-47A-R is Closed.

  • 17. Open PP SUCT VLV MO 2- GREEN light illuminated.

1501-5A.

  • 18. Place 2A LPCI PP control Depresses and places 2A switch in AUTO. LPCI PP c/s to center (AUTO) position. _____ _____ _____
19. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI with suction from the CST. pump suction pressure _____ _____ _____

problem when aligned to CST. May recommend using another LPCI pump.

CUE:

Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.

BEGIN ALTERNATE PATH

  • 20. Place 2C LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

  • 21. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5C control switch in Manual Bypass and verify _____ _____ _____

closed.

22. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13B closed if not needed. _____ _____ _____

CUE:

2-1501-13B is not required for 2D LPCI pump.

S-N-d Page 7 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

23. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____

24. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A closed. _____ _____ _____

25. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A closed. _____ _____ _____

26. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____

27. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B closed. _____ _____ _____

28. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B closed. _____ _____ _____

29. Unlock AND open 2-1501- Instructs EO to complete 74C, U2 LPCI C PMP step G.12.e.(5).(a).

VENT VLV.

30. Crack open 2-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV until step G.12.e.(5).(b).

flow is observed from pipe. _____ _____ _____

31. Close 2(3)-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV. step G.12.e.(5).(c).
32. Close AND lock 2-1501-74C, Instructs EO to complete U2 LPCI C PMP step G.12.e.(5).(d).

VENT VLV.

S-N-d Page 8 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

33. Open 2-1501-47C-R, U2 Instructs EO to obtain PI 2-LPCI C PUMP SUCT PI 1501-47A reading per step 2-1501-47C ROOT VLV (at G.12.e.(6) and G.12.e(7).. _____ _____ _____

pump) and verify PI 2-1501-47C indicates less than 15 psig.

CUE:

Pressure is 10 psig. .

34. Recognizes reading is less Determines reading is than 15 psig. LESS than 15 psig.
35. Close 2-1501-47C-R, U2 Instructs EO to close 2-LPCI C PUMP SUCT PI 1501-47C per step G.12.e.(8). _____ _____ _____

2-1501-47C ROOT VLV.

  • 36. Unlock AND open 2-1501- Directs EO to perform 31C, U2 LPCI C PMP step G.12.e.(10)(a)

SUCT VLV FROM CST [at 2 C LPCI Pump]

CUE:

2-1501-31C is open.

  • 37. Unlock AND open 2-1501- Directs EO to perform 37, U2 LPCI & CS SUCT step G.12.e.(10)(b)

FROM 2/3A CST SV (located at 2/3A CST)

Simulator Operator / Evaluator:

Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.

CUE:

2-1501-37 is open.

S-N-d Page 9 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 38. Start 2C LPCI PP Places control switch to start. RED light illuminated.
39. Inform Unit Supervisor that Informs Unit Supervisor 2C LPCI pump is lined up that 2C LPCI pump is to the CST and the task is lined up to the CST and complete. injecting; the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-d Page 10 of 12

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 08 JPM Number: S-N-d Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance: 295031.A1.01 4.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 38 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-d Page 11 of 12

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST and inject to raise RPV water level per DEOP 0500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

S-N-d Page 12 of 12

Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)

JPM Number: S-N-e Revision Number: 06 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Revision 06 Revised for 2014 NRC exam.

S-N-e Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
2. Ensure Torus water level is <30 feet.
3. Insert following Malfunctions and/or Remotes.
  • IMF CIGP2I (Spurious Group II Isolation)
  • IOR PCDOP61 OFF (prevents the 1601-61 valve from opening)
  • Adjusts Torus Level indications to ~20 feet.

ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20

  • ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
  • Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled

  • Adjusts Drywell & Torus pressures to 50.0 psig.

ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0

4. Verify the SBGT system operating and verify flow ~4000 scfm.
5. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.

S-N-e Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-e Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.

1. Verify SBGT is operating and Verifies 2/3A SBGT train flow is ~ 4000 scfm. FI 7540-13 is reading

~4000 scfm. _____ _____ _____

2. Verify Reactor Mode switch Verifies Reactor Mode NOT in RUN. switch NOT in RUN.
3. Place VENT ISOL SIGNAL Momentarily places BYPASS switch on 902-5 Bypass switch to Torus panel to TORUS. Position. _____ _____ _____

NOTE:

The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.

4. Open AO 2-1601-61, TORUS Places AO 2-1601-61 2-INCH VENT VLV. control switch to OPEN position and determines _____ _____ _____

that the valve will not open.

NOTE:

IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.

BEGIN ALTERNATE PATH

  • 5. Place VENT ISOL SIGNAL Momentarily places Vent BYPASS switch on 902-5 Isol Signal Bypass switch panel to DRYWELL. to Drywell position. _____ _____ _____

CUE:

If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter as read reads 56 psig and is trending UP slowly.

  • 6. Open AO 2-1601-62, DW Red Open light illuminated.

2-INCH Vent.

S-N-e Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 7. Open AO 2-1601-63, VENT Red Open light illuminated.

TO SBGT.

8. Determine if SBGT flow is Containment pressure adequate to control and stable or decreasing.

maintain Torus Bottom pressure below the Primary _____ _____ _____

Containment Pressure Limit.

CUE:

Torus bottom pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-e Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)

Revision Number: 06 JPM Number: S-N-e Task Number and

Title:

295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

DEOP 0500-04, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-e Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

S-N-e Page 8 of 8

Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE JPM Number: S-N-f Revision Number: 02 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 Cert Exam Revision 02 Revised for ILT 14-1 NRC Exam S-N-f Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • irf M63 open (Prevents TR-22 to Bus 23 breaker from closing).
3. Setup the following Triggers:
  • None.
4. Ensure ONLY 2 RFPs operating.
5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.

DOCUMENT PREPARATION

1. Marked up copy of DOP 6500-01, Transfer of 4160 Volt Bus Power Supply.

S-N-f Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-f Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOP 6500-01.

This task has two parts, which can be performed in any order.

CUE:

IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.

TRANSFER BUS 21 TO TR-22

  • 1. Position TR-22 to Bus 21 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

2. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

  • 3. Position TR-22 to Bus 21 RED light illuminated.

breaker control switch to CLOSE. _____ _____ _____

4. Verify:

SYNCHRONIZING meter at Meter NOT rotating.

12 oclock position.

TR-22 to Bus 21 breaker RED light illuminated.

indicates CLOSED.

Annunciator 902-8 D-1 in Annunciator 902-8 D-1 alarm. illuminated.

S-N-f Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Position TR-21 to Bus 21 GREEN light illuminated.

breaker control switch to TRIP. _____ _____ _____

6. Verify:

TR-21 to Bus 21 breaker GREEN light illuminated.

indicates OPEN.

Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.

extinguished.

7. Position TR-22 to Bus 21 Switch in OFF position.

synchroscope selector switch to OFF. _____ _____ _____

8. Verify Bus 21 AMMETER and Verifies Bus 21 amps and VOLTMETER indications are volts are normal.

normal. _____ _____ _____

NOTE:

Amps may vary depending on conditions, and volts are normally ~ 4160.

TRANSFER BUS 23 TO TR-22

  • 9. Position TR-22 to Bus 23 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

10. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

  • 11. Position TR-22 to Bus 23 Breaker does NOT close.

breaker control switch to CLOSE. _____ _____ _____

S-N-f Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Candidate should observe that the TR-22 to Bus 23 breaker did not close.

  • 12. IMMEDIATELY positions TR- GREEN light illuminated.

22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor. _____ _____ _____

NOTE:

Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.

If the TR-22 to Bus 23 breaker is the first breaker that was operated:

CUE:

Acknowledge report of the TR-22 to bus 23 breaker failed to close. Inform the candidate another operator will address Bus 23 and to continue with the transfer of Aux power on Bus 21.

13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-f Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE Revision Number: 02 JPM Number: S-N-f Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies.

K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 24 minutes Actual Time Used: minutes

References:

DOP 6500-01, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-f Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

S-N-f Page 9 of 9

Exelon Nuclear Job Performance Measure RBM - CLEAR RBM MALFUNCTION - (A)

JPM Number: S-N-g Revision Number: 01 Date: 01/15 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for 2014 LORT NRC Exam.

Revision 01 Revised JPM for 14-1 ILT NRC Exam.

S-N-g Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with:

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

  • FCL 90 - 96%
  • A control rod available to withdraw which meets the following:

In-sequence.

Partially withdrawn.

Non-edge.

2. For development of this JPM, IC 152 with control rod sequence 2S.0.0 1646 (step 13 withdrawn) was used with the following:
  • Recirc flow at ~58 Mlbm/hr. (Can be adjusted higher if necessary)
3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae DOCUMENT PREPARATION Clean copy of DOA 0700-03, ROD OUT BLOCKS.

Copy of Special Maneuver Rod Move Sheets Copy DGP 03-01, Power Changes Copy of DAN 902(3)-5 A-7 CAEP file:

  1. S-N-g.cae
  1. For 14-1 ILT NRC Exam
  1. Written by MP
  1. Rev 01
  1. Date 01/15
  1. INITIAL CONDITIONS
  1. None S-N-g Page 3 of 10

Job Performance Measure (JPM)

  1. EVENT TRIGGERS
        1. Setup for JPM S-N-g, RBM - Clear RBM Malfunction - (A) ####
  1. Event Trigger 1 Activates when control rod D-04 is settling to position 16.
  1. Overrides RBM 7 Mode SW to STANDBY.
  1. Overrides RBM 7 902-37 NO BALANCE light ON.

trgset 1 "rdzactls(28) .gt. 44.0" ior nidrmod16 (1) off ior nidrmod15 (1) standby ior nilbnbal1 (1) true

  1. Event Trigger 2 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 OPERATE override.

trgset 2 "nidrmod1_drw(4)"l2 trg 2 "dor nidrmod16"l2

  1. Event Trigger 3 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 STANDBY override.

trgset 3 "nidrmod1_drw(4)"l2 trg 3 "dor nidrmod15"l2

  1. Event Trigger 4 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 NO BALANCE light override.

trgset 4 "nidrmod1_drw(4)"l2 trg 4 "dor nilbnbal1"l2

  1. END S-N-g Page 4 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to position 20 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-g Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT Note:

Although not a procedure step a second verifier is required. Second Verifier Duties:

Proper rod selected Insert and Withdraw limits understood.

Check off each control rod movement on the CRD Checklist.

1. Request a second verifier VERIFIES second verifier available.

Cue:

Inform examinee that you will perform duties of second verifier.

  • 2. Selects Control Rod D-04. Depresses Select Pushbutton for Control Rod D-04. Observes Full ______ _______ _____

Core Display and Apron Select lights for control rod D-04 lit.

NOTE:

An automatic Trigger inserts a failure for RBM 7 as control rod D-04 settles to position 16.

  • Momentarily places D-04 from position 14 to position Rod Movement
16. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 16.

4. Observe annunciator 902-5 A-7, Announces annunciator RBM HI/INOP is received. 902-5 A-7, RBM HI/INOP is received. ______ _______ _____

ALTERNATE PATH BEGINS

5. Depress the appropriate RBM Depresses the RBM PUSH TO SET-UP Push Buttons. PUSH TO SET-UP Push Buttons. ______ _______ _____

S-N-g Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

6. Verify only one Control Rod is Verifies only one rod is selected for movement, and that it selected on the rod select is in the proper sequence (the NO matrix and the NO ROD ______ _______ _____

ROD SELECTED Light on Panel SELECTED light for RBM 902(3)-37 should be 7 at panel 902-37 is extinguished). extinguished.

7. Check that there are NO unusually Verifies that there are no high LPRM indications, and that high LPRM indications there are the proper number of and RBM 7 has the ______ _______ _____

assigned LPRMs for each of the proper number of LPRMs RBM Channels. assigned.

NOTE:

When the examinee begins to printout control rod and LPRM printouts, provide the Examinee with the handouts in the JPM package.

CUE:

When the examinee states they would provide the printouts to the QNE for review, inform the examinee the QNE has reviewed the printouts and has no concerns.

8. Obtain a Control Rod Printout and Examinee reviews a LPRM Printout from the process printouts to verify no computer (Reference DOP 9950- concerns. ______ _______ _____

03 AND DOP 9950-07) to verify proper Control Rod Position and LPRM flux profile.

  • 9. Place the RBM 7 Mode Selector Places the RBM 7 Mode Switch to the ZERO 2 position and Selector Switch to the then move it to the STANDBY ZERO 2 position AND ______ _______ _____

Position. then to STANDBY.

NOTE:

This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.

  • 10. Place the RBM Mode Selector Places the RBM 7 Mode Switch to the OPERATE Position. Selector Switch to OPERATE ______ _______ _____

S-N-g Page 7 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

The RBM 7 INOP light on Panel 902-37 will go out.

ALTERNATE PATH ENDS

  • Momentarily places D-04 from position 16 to position Rod Movement
18. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 18.

  • Momentarily places D-04 from position 18 to position Rod Movement
20. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 20.

NOTE:

At this point the JPM is complete

13. Informs Unit Supervisor task is Examinee notifies the complete. Unit Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-g Page 8 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

RBM - Clear RBM Malfunction JPM Number: S-0700-16 Revision Number: 00 Task Number and

Title:

201L016, Respond to a rod out block.

K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 33 minutes Actual Time Used: minutes

References:

DOA 0700-03, rev 12; DAN 902-5 A-7, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-g Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to 20 using single notch IAW DGP 03-01, Step G.2.w.
2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
3. Inform the Unit Supervisor when the task is complete.

S-N-g Page 10 of 10

Exelon Nuclear Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-h Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised JPM ILT 14-1 NRC Exam.

S-N-h Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure A AHU operating.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.

S-N-h Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Another NSO will perform all log entries.
9. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05.
2. Inform the Unit Supervisor when the task is complete.

S-N-h Page 4 of 9

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-h Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOP 5750-05.

NOTE:

Train B AHU will automatically start when Train A AHU is secured.

CUE:

If asked as EO in the field, the Train B RCU oil level is in the sightglass.

  • 1. Secure Train A AHU using BLUE ON light OFF and control switch, 2/3A TRAIN GREEN OFF light lit.

CRM AIR HANDLING UNIT.

  • 2. Secure Train A Return Fan BLUE ON light OFF and using control switch, CRM GREEN OFF light lit.

RETURN FAN.

  • 3. Place Train B AHU control Control Switch RED target switch, CRM AIR HANDLING visible.

UNIT B, in Auto After Start. _____ _____ _____

4. Monitor PI 2/3 5740 36, CRM Observes a positive TO E TURB DP, to assure a pressure is being positive pressure is being maintained.

maintained in the Control Room.

5. Monitors the RCU Directs the EO, in the field, compressor suction pressure. to report the RCU compressor suction pressure. _____ _____ _____

CUE:

RCU suction pressure is 75 psig.

S-N-h Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

6. Monitors the RCU Directs the EO, in the field, compressor discharge to report the RCU pressure. compressor discharge pressure. _____ _____ _____

CUE:

RCU discharge pressure is 230 psig.

7. Monitors the RCU Directs the EO, in the field, compressor oil pressure, (40 to report the RCU to 60 psig above suction compressor oil pressure. _____ _____ _____

pressure).

CUE:

RCU compressor oil pressure is 125 psig.

8. States intention to monitor the Communicates need to RCU compressor oil level monitor oil pressure AFTER three hours of AFTER three hours of operation. operation.

CUE:

Acknowledge report.

9. Informs Unit Supervisor that Examinee notifies the Unit task is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-h Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CREV - SECURE A AHU AND STARTUP B AHU AND RCU Revision Number: 01 JPM Number: S-N-h Task Number and

Title:

288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.

K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 26 minutes Actual Time Used: minutes

References:

DOP 5750-05, rev 63 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-h Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Another NSO will perform all log entries.
9. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05.
2. Inform the Unit Supervisor when the task is complete.

S-N-h Page 9 of 9

Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-i Revision Number: 03 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Revision 03 Revised for ILT 14-1 NRC exam.

S-N-i Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION A clean copy of DOA 6600-01, Diesel Generator Failure.

S-N-i Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOA 6600-01, Diesel Generator Failure.

1. Proceeds to the 2/3 Diesel Proceeds to the 2/3 Diesel Generator Room. Generator Room.
  • 2. Examinee checks the level in Observes day tank the D/G Fuel Oil Day Tank. sightglass and determines day tank needs filling.

CUE:

Point to the lower third area on the local sightglass and state: the level is here.

NOTE:

Normal level is 30 - 38".

3. Verify that power is available Verifies power available, to the DIESEL FUEL OIL by local indicating lights TRANSFER PUMP 2/3. illuminated.

CUE:

The GREEN LIGHT is illuminated.

  • 4. Start the Fuel Oil Transfer Holds 2/3-5203 U2 Diesel Pump by holding local Test Oil Transfer Pp c/s in ON Switch in the ON position. position.

CUE:

The pump is running.

You have held the switch for approximately 5 minutes.

S-N-i Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

5. Checks the level in the fuel oil OBSERVES sight glass day tank. and/or REQUESTS annunciator 902-8 G-4 status. _____ _____ _____

CUE:

Point to the local sightglass at the 35 inch mark on the measuring stick and state: the level is here; OR, if requested the NSO says Control Room alarm 902-8 G-4 has reset.

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 03 JPM Number: S-N-i Task Number and

Title:

264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.

K/A Number and Importance: 264000.K1.05 3.2/3.3 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes

References:

DOA 6600-01, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 8 of 8

Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

Revision 01 New JPM developed for ILT 14-1 (2015-301) NRC Exam.

S-N-j Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DSSP 0100-CR, Attachment I.

S-N-j Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DSSP 0100-CR, Attachment I.

CB-1 key is required for entry into the Iso Cond makeup pump building.

The candidate may choose to start either engine.

  • 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN.

engine in RUN.

CUE:

The engine started.

2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running at 1802 RPM.

NOTE:

The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).

3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature
  • RPM BEGIN ALTERNATE PATH CUE:

Provide the following engine parameter values:

  • Oil pressure: 55 psi
  • Water Temperature 215oF
4. Recognizes that water > 205oF.

temperature has exceeded the high limit. _____ _____ _____

S-N-j Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF.

RUN toggle switch to OFF. _____ _____ _____

CUE:

The engine stopped.

  • 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN.

originally started. _____ _____ _____

CUE:

The engine started.

7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running at 1799 RPM.

8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature

Provide the following engine parameter values:

  • Oil pressure: 59 psi
  • Water Temperature 185oF
9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual.

operation.

S-N-j Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

Inform the candidate that another Operator will perform monitoring duties.

10. Reports to the SM/U2 US that SM/U2 US notified.

the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 01 JPM Number: S-N-j Task Number and

Title:

207N020, Start Isolation Condenser Makeup Pump.

K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

DSSP 0100-CR, rev 49 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 9 of 9

Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-k Revision Number: 11 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 09 Bank JPM.

Revision 10 Revised for 2010 NRC Exam.

Revision 11 Revised for ILT 14-1 NRC Exam S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DEOP 0500-03.

The examinee is NOT required to obtain a key to open or close locked valves.

The examinee is required only to identify which type of key is required to open the valve. (Master O)

1. Proceeds to the Unit 2 Proceeds to the U2 SBLC Standby Liquid Control area.

(SBLC) area. _____ _____ _____

  • 2. Unlock and close 2-1101-4, Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. hand wheel full clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 3. Unlock and close 2-1199-37 Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. handle 1/4 turn clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 4. Unlock and open 2-1101-8, Unlocks lock and removes SBLC TEST TK OUTLET SV. chain, then rotates valve hand wheel full counter- _____ _____ _____

clockwise...

CUE:

The component is in the condition you have described.

  • 5. Open 2-4315-500, CLEAN Rotates valve hand wheel DEMIN WTR SUPPLY TO full counter-clockwise.

SBLC SV.

  • 6. Open 2-1101-7, CLEAN Rotates valve hand wheel DEMIN WTR TO SBLC TEST full counter-clockwise.

TK SV. _____ _____ _____

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

You hear flow noises into the tank.

CUE:

The component is in the condition you have described.

  • 7. Start both SBLC pumps from Contacts the Unit 2 Control the main Control Room. Room Operator to start the SBLC pumps. _____ _____ _____

CUE:

You hear the squib valves fire, BOTH SBLC pumps start, and you hear flow noise.

CUE:

As the Unit 2 Control Room Operator: I have started both Unit 2 Standby Liquid Control pumps.

8. Throttle 2-1101-7, CLEAN Opens / closes valve to DEMIN WTR TO SBLC TEST maintain test tank level.

TK SV, to stabilize level in _____ _____ _____

tank.

CUE:

The test tank level is now stabilized (as much going in as is going out).

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 11 JPM Number: S-N-k Task Number and

Title:

295L088, Line Up SBLC Test Tank for Alternate Water Injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

S-N-k Page 8 of 8

Exelon Nuclear Job Performance Measure AUX POWER - CROSSTIE BUS 28 AND 29 JPM Number: S-N-l Revision Number: 02 Date: 04/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised to current procedure revision.

Revision 02 Revised to current procedure revision.

S-N-l Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 2. (Cold Shutdown)

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. On 902-4 panel perform the following:
  • Open AO 4723, DW N2 Backup.
  • Stop the running Pumpback Compressor.
3. On 902-7 panel perform the following:
  • Start the turbine EBOP.
  • Place the turbine turning gear in PTL.
  • Place the turbine turning gear oil pump in PTL.
  • Stop the turbine bearing lift pumps.
  • Start the generator ESOP.
  • Place the generator MSOP and Vacuum pump in PTL.
  • Start 2B Cond Transfer pump and stop 2A.
4. On 923-5 panel perform the following:
  • Start 2B S. Turb Bldg Vent Fan and stop 2A.
5. Ensure the MCC 28-7/29-7 feed is from Bus 29.
6. Ensure U2 125 VDC system is powered from Battery Charger 2.

NOTE: In the next steps the following will occur.

  • Group II and III isolations.
  • Instrument Bus will transfer to Reserve feed.

(setup continued on next page)

S-N-l Page 3 of 8

Job Performance Measure (JPM)

7. Insert following Malfunctions and/or Remotes.
  • irf cirwcujp in (Installs RWCU isol jumpers.)
  • Transfers 250 VDC to the 2/3 charger.

irf t51 true irf t50 false

  • irf r98 true (installs RPS 600 psig jumpers to prevent a full scram when RPS CH B is powered from alternate supply)
  • irf b04 true (lines up RPS CH B to alternate supply MCC 25-2)
  • irf csbukpfl open (Lines up ECCS keepfill to backup supply)
  • irf m89 open (Opens feed to MCC 28-2 to trip 2B RPS MG set and force instrument bus ABT to its reserve source)
  • imf at1 (Opens MCC 28-1 feed to ATS)
8. Override annunciator ACK buttons DEPRESSED for panels 902-4, -5, -6, -7, and -55 and the Silence button for one of the Common Panels.
9. Reset the GP III Isolation, place the RWCU Aux PP back on and reestablish blowdown so RPV level is stable.
10. Acknowledge and reset alarms.
11. During the performance of this JPM, audible panel alarms may sound if the ACK button is not overridden DEPRESSED. Perform the action of the 'other' NSO mentioned in the cue to silence any audible alarms.

DOCUMENT PREPARATION DOP 6700-02 Attachment A hardcard.

S-N-l Page 4 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. An NLO reports that Transformer 28 is overheating.
3. The Unit Supervisor decided that Transformer 28 needs to be de-energized.
4. Consideration of AC loads lost during the evolution has been completed and will have no major impact.
5. TS sections 3.8.7 and 3.8.8 have been checked and need not be referenced again
6. DOP 6800-05, Power Restoration to ATS feeds has been referenced. No actions are necessary.

INITIATING CUE

1. The Unit Supervisor has directed you to perform a dead bus transfer of Bus 28 to Bus 29 in accordance with the DOP 6700-02 hard card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-l Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee should locate the hard card, then provide the included copy.

Evaluator is to acknowledge all alarms except the 902-7 and 8 panel.

  • 1. Open Bus 23-1 to TR-28 Green light illuminated.

ACB.

2. Verifies and reports alarm Reports alarm 902-8 A-7.

902-8 A-7.

  • 3. Close Bus 29 & Bus 28 tie Red light illuminated.

ACB.

  • 4. Close Bus 28 & Bus 29 tie Red light illuminated.

ACB.

5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-l Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - CROSSTIE BUS 28 AND 29 Revision Number: 02 JPM Number: S-N-f Task Number and

Title:

262L032 Crosstie 480V Busses 25, 26, 27, 28, and 29 K/A Number and Importance: 262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 11 minutes Actual Time Used: minutes

References:

DOP 6700-02, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-l Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. An NLO reports that Transformer 28 is overheating.
3. The Unit Supervisor decided that Transformer 28 needs to be de-energized.
4. Consideration of AC loads lost during the evolution has been completed and will have no major impact.
5. TS sections 3.8.7 and 3.8.8 have been checked and need not be referenced again
6. DOP 6800-05, Power Restoration to ATS feeds has been referenced. No actions are necessary.

INITIATING CUE

1. The Unit Supervisor has directed you to perform a dead bus transfer of Bus 28 to Bus 29 in accordance with the DOP 6700-02 hard card.
2. Inform the Unit Supervisor when the task is complete.

S-N-l Page 8 of 8

Exelon Nuclear Job Performance Measure ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)

JPM Number: S-N-a Revision Number: 00 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM. for 2014 ILT NRC exam S-N-a Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the following: (IC 151 was used for validation)
  • Adjust Core flow to establish ~850 MWe.
  • Verify 95 - 100 FCL.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • None
3. Setup the following Triggers:
  • trgset 1 "ppg228 .gt. 875.0" (Activates when Generator load is > 875 MWe)
  • ior asdaemtrp (1) 2 (Trips 2A Recirc pump)

DOCUMENT PREPARATION

1. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with recirc flow.
2. A Maneuvering REMA marked up to point of raising power with recirc flow.
3. Clean copy of DOP 0202-03, Reactor Recirculation Flow Control System Operation.
4. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One or Both Pumps.

S-N-a Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
3. The TSO has requested raising Unit 2 load to 900 MWe.

INITIATING CUE

1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-a Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of:

Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps, hand him the supplied copy of it.

  • 1. Depresses one of the Panel Depresses one of the 902-5 Recirc Master Manual following Panel 902-5 Control raise speed Recirc Master Manual _____ _____ _____

pushbuttons. (Repeats this Control raise speed step to continue load pickup) pushbuttons 0.5 sec, but <

10 sec:

RAISE LOW (0.06%)

RAISE MED (0.18%)

RAISE HIGH (0.90%)

2. Verifies expected response Verifies Recirc pump after each speed bump. speeds, Core flow, Rx power and other plant _____ _____ _____

parameters change as expected.

NOTE:

An automatic Trigger is setup to trip 2A Recirc pump when Generator load reaches 875 MWe.

BEGIN ALTERNATE PATH

3. Announces 2A Recirc pump Announces 2A Recirc trip and enters DOA 0202-01, pump trip and enters DOA Recirculation (Recirc) Pump 0202-01, Recirculation _____ _____ _____

Trip - One Or Both Pumps. (Recirc) Pump Trip - One Or Both Pumps.

S-N-a Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

4. Determines operating in the Determines operating in Nominal Feedwater Heating the Nominal Feedwater Region of Figure 1, Heating Region of _____ _____ _____

Feedwater Heating Regions, Figure 1, Feedwater and goes to the Subsequent Heating Regions, and goes Operator Actions (Nominal to the Subsequent Feedwater Heating) Flow Operator Actions (Nominal Chart. Feedwater Heating) Flow Chart.

CUE:

If the Examinee begins to do any of the following from the right side of the Hardcard, inform the Examinee that as the CRS I assigned another operator to perform it:

Monitor MSL & off gas rad monitors for increased activity.

Notify QNE to monitor core parameters.

Notify Chemistry to take samples per TS and ODCM if power change was 20% thermal in one hour.

  • 5. Closes 2A Recirc Pump Rotates 2A PP DISCH discharge valve MO VLV MO 2-202-5A CCW to 2-0202-5A the CLOSE position.

Verifies the valves CLOSE _____ _____ _____

light lit and OPEN light out.

NOTE:

While waiting for the 5 minutes to elapse, the Examinee should continue with the rest of the steps.

  • 6. Inserts CRAM Rods per CRAM rods inserting with DGP 03-04 to reduce expected power reduction.

Reactor power to 35 to 40%

  • 7. After 5 minutes, opens Rotates 2A PP DISCH recirc pump discharge VLV MO 2-202-5A CW to valve previously closed. the OPEN position.

Verifies the valves OPEN _____ _____ _____

light lit and CLOSE light out.

S-N-a Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

After the insertion of several CRAM rods, as the CRS state another operator will take over inserting CRAM rods. Your task is complete.

8. Repeats back another Repeats back another operator will take over operator will take over inserting CRAM rods. My task inserting CRAM rods. My _____ _____ _____

is complete task is complete

9. Informs Evaluator the Task is Informs Evaluator the Task complete. is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-a Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)

JPM Number: S-N-a Revision Number: 00 Task Number and

Title:

202L024, Change Recirc pump speed on both Recirc pumps using ASD Tandem controls.

K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 36 minutes Actual Time Used: minutes

References:

DOP 0202-03, rev 43 and DOA 0202-01, rev 42 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-a Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
3. The TSO has requested raising Unit 2 load to 900 MWe.

INITIATING CUE

1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
2. Inform the Unit Supervisor when the task is complete.

S-N-a Page 9 of 9

Exelon Nuclear Job Performance Measure RAPIDLY SECURE THE RWCU SYSTEM WITH THE REACTOR AT PRESSURE JPM Number: S-N-b Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date S-N-b Page 1 of 9

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Update for the 2014 ILT NRC exam.

S-N-b Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC where the reactor is at or close to normal operating pressure
  • Verify the RWCU system is in normal operation with the 2A RWCU pump running.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify PIC 2-1290-2, PRESSURE CONTLR, in BAL with the MAN pot balanced.
3. Insert following Malfunctions and/or Remotes:
  • None
4. Setup the following Triggers:
  • trgset 1 "rtdmn02_drw .and. (rtwmn02 .le. 0.05)" (Activates when RWCU pressure controller is in MAN and the pot is <0.05 demand)
  • ior rtwmn02 (1) 0.0 (This overrides the demand to 0.0 since the lowest the demand goes is 0.02 which causes the RWCU system to isolate before the operator can isolate it)

DOCUMENT PREPARATION

1. A copy of DOP 1200-03, Attachment A, RWCU SYSTEM OPERATION WITH THE REACTOR AT PRESSURE.

S-N-b Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A leak is present in the U2 RWCU system.
2. RWCU Blowdown was NOT established.
3. PCV bypass 2-1201-43 is CLOSED.

INITIATING CUE

1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-b Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Pump should trip in step 1 when demand is adjusted to zero. In Step 2 action to stop pump, the Examinee should verify that the pump is tripped OR stops the pump prior to closing valves in the following steps.

This is a critical action (verify or stop pump) to prevent forcing an automatic protective action that trips the pump when the system is isolated.

1. Place PIC 2-1290-2 Rotates outer collar CW to MAN.

PRESSURE CONTLR, in Rotates inner knob CCW to zero MANUAL.

indication on horizontal indicator.

AND Annunciators 902-4 A-10, B-11, Adjust demand to zero (0) B-12 and C-12 alarm.

to close the valve. _____ _____ _____

2. Stop 2A RWCU RECIRC Verifies 2A pump tripped OR PP. Places 2A pump control switch to STOP and verifies:

Blue ON light OFF Green OFF light ON _____ _____ _____

3. Verify the following valves .

are closed:

  • MO 2-1201-1, RX Momentarily places MO OUTLET ISOL. 2-1201-1, RX OUTLET ISOL, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____
  • MO 2-1201-1A, RX Verifies MO 2-1201-1A, RX OUTLET BYP. OUTLET BYP, Green Close light ON. _____ _____ _____
  • MO 2-1201-2, INLET Momentarily places MO ISOL. 2-1201-2, INLET ISOL, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____
  • MO 2-1201-7, RX Momentarily places MO RETURN VLV. 2-1201-7, RX RETURN VLV, control switch to CLOSE, and verifies its Red Close light ON. _____ _____ _____

S-N-b Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

  • MO 2-1201-8, RWCU Verifies MO 2-1201-8, RWCU PP PP BYP. BYP, Red Close light ON. _____ _____ _____

NOTE:

Step 4 on Hardcard is N/A as blowdown was not established (per initial conditions).

Step 5 is not an If / Then so the Examinee may verify that the actions within the step are complete.

4 WHEN flow is zero Verifies closed indication for

[FI 2-1290-13, BLOWDN valves:

FLOW], then close the

  • MO 2-1201-11, BLOWDN TO following valve(s), as CONDR.

applicable:

  • MO 2-1201-12, BLOWDN TO

BLOWDN TO CONDR.

  • MO 2-1201-12, BLOWDN TO RW VLV. _____ _____ _____

5 Close MO 2-1201-9A, A Places MO 2-1201-9A, A RWCU RWCU PP DISCH PP DISCH, control switch to CLOSE and verifies Green Closed light ON _____ _____ _____

NOTE:

Step 7 is N/A as PCV bypass is closed. (Per initial conditions).

6 Notify Chemistry that Notifies Chemistry.

RWCU has been isolated, (Noble Metals Monitor should be isolated) _____ _____ _____

CUE:

Respond that Chemistry has been notified.

NOTE:

Step 7 action is to be taken by another operator.

7 Enter substitute values for Will address entering computer computer points to ensure points.

the heat balance is accurate. _____ _____ _____

CUE:

Inform the examinee that the another NSO will enter substitute values for step 9 of the Hard Card.

S-N-b Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT Report to the Unit Reports that RWCU has been Supervisor that RWCU has secured.

been rapidly secured. _____ _____ _____

CUE:

Acknowledge the report.

END JPM Stop Time:_________

S-N-b Page 7 of 9

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

RO SRO JPM

Title:

Rapidly Secure the RWCU System with the Reactor at Pressure JPM Number: S-N-b Revision Number: 01 Task Number and

Title:

204L005, Secure the RWCU System with the reactor at pressure K/A Number and Importance: 20400A4.06 3.0/2.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: __10___minutes Actual Time Used: _______minutes

References:

DOP 1200-03, Rev 66 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

S-N-b Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A leak is present in the U2 RWCU system.
2. RWCU Blowdown was NOT established.
3. PCV bypass 2-1201-43 is CLOSED.

INITIATING CUE

1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.

S-N-b Page 9 of 9

Exelon Nuclear Job Performance Measure DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 02 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Modified for ILT 12-1 Cert Exam Revision 02 Modified for ILT 14-1 NRC Exam S-N-c Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure that Both DEHC monitors are displaying the STATUS screen.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Clean copy of DGP 02-03, Attachment F, Reactor Plant Cooldown Using Bypass valves.

S-N-c Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin an 85.0 Deg. F / hr automatic reactor cooldown to 350 Deg. F utilizing the Hardcard.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-c Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DGP 02-03.

All the below actions can be performed on either of the Digital EHC control stations.

  • 1. Select <CONTROL>. Utilizing the trackball controller, clicks on

<CONTROL>. _____ _____ _____

  • 2. Select <RX COOLDOWN>. Utilizing the trackball controller, clicks on

<COOLDOWN>. _____ _____ _____

3. Verify REACTOR Observes the REACTOR COOLDOWN is OFF. COOLDOWN OFF select button is orange. _____ _____ _____
  • 4. Select STPT/RAMP. Utilizing the trackball controller, clicks on the

<STPT/RAMP>. _____ _____ _____

  • 5. Enter desired target Clicks in the Set Point box.

temperature setpoint. Utilizing the keyboard, enters 350.0. _____ _____ _____

  • 6. Enter desired cooldown rate Clicks in the Ramp Rate in the Ramp box. box. Utilizing the keyboard, enters 85.0. _____ _____ _____
  • 7. Select <OK>... Utilizing the trackball controller, clicks on <OK>.

Clicks <OK> on the Confirm Setpoint pop up _____ _____ _____

window.

S-N-c Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 8. Initiate Reactor cooldown by Utilizing the trackball selecting ON for REACTOR controller, clicks on <ON>.

COOLDOWN.

Clicks <OK> on the Begin Reactor Cooldown pop up _____ _____ _____

window.

Verifies Cooldown occurring using any of the following:

o Recirc temperature dropping o Reactor pressure dropping.

9. On <CONTROL> If uses other DEHC

<PRESSURE CONTROL> screen, utilizing the screen, adjust pressure trackball controller, clicks setpoint as necessary to on <CONTROL>.

maintain at least 50 psig above Reactor pressure. Utilizing the trackball _____ _____ _____

controller, clicks on

<PRESSURE CONTROL>.

10. On <CONTROL> <BPV If uses other DEHC JACK> screen, verify BPV screen, utilizing the Jack position setpoint is trackball controller, clicks

-5.0%. on <CONTROL>.

Utilizing the trackball controller, clicks on < BPV JACK >. _____ _____ _____

Observes BPV Jack position setpoint is -5.0%.

11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

S-N-c Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT END JPM Stop Time:_________

S-N-c Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES Revision Number: 02 JPM Number: S-N-c Task Number and

Title:

29501LP040, Respond to a Reactor Scram IAW DGP 02-03.

K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DGP 02-03, rev 104 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-c Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin an 85.0 Deg. F / hr automatic reactor cooldown to 350 Deg. F utilizing the Hardcard.
2. Inform the Unit Supervisor when the task is complete.

S-N-c Page 9 of 9

Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 08 Date: 1/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 12-1 Cert Exam.

Revision 08 Revised for ILT 14-1 NRC Exam.

S-N-d Page 2 of 12

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify NO LPCI pumps operating.
3. Insert following Malfunctions and/or Remotes:
  • Setup Trigger 15 to open 2C LPCI PP suction to CST: irf lpcstppc (15) true
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.

S-N-d Page 3 of 12

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.

Examiner Note: The following parameters do not match the simulator indications.

3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST and inject to raise RPV water level per DEOP 0500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-d Page 4 of 12

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

1. Place 2A LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

2. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5A control switch in Manual Bypass and verify _____ _____ _____

closed.

3. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13A closed if not needed. _____ _____ _____

CUE:

2-1501-13A is not required for 2B LPCI pump.

NOTE:

The following valves may be verified in any order

4. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____

5. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A closed. _____ _____ _____

6. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A closed. _____ _____ _____

7. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____

8. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B closed. _____ _____ _____

S-N-d Page 5 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

9. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B closed. _____ _____ _____

NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

CUE:

When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.

10. Unlock AND open 2-1501- Instructs EO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a).

VENT VLV.

11. Crack open 2-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).

flow is observed from pipe. _____ _____ _____

12. Close 2(3)-1501-15A, U2 Instructs EO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c).
13. Close AND lock 2-1501-74A, Instructs EO to complete U2(3) LPCI A PMP step G.12.c.(5).(d).

VENT VLV.

14. Open 2-1501-47A-R, U2 Instructs EO to obtain PI 2-LPCI A PUMP SUCT PI 1501-47A reading per step 2-1501-47A ROOT VLV (at G.12.c.(6). & G.12.c.(7). _____ _____ _____

pump) and verify PI 2-1501-47A indicates less than 15 psig.

CUE:

PI 2-1501-47A indicates 15.5 psig.

15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.

S-N-d Page 6 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

16. Close 2-1501-47A-R, U2 Instructs EO to close 2-LPCI A PUMP SUCT PI 1501-47A per step G.12.c.(8). _____ _____ _____

2-1501-47A ROOT VLV.

CUE:

2-1501-47A-R is Closed.

  • 17. Open PP SUCT VLV MO 2- GREEN light illuminated.

1501-5A.

  • 18. Place 2A LPCI PP control Depresses and places 2A switch in AUTO. LPCI PP c/s to center (AUTO) position. _____ _____ _____
19. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI with suction from the CST. pump suction pressure _____ _____ _____

problem when aligned to CST. May recommend using another LPCI pump.

CUE:

Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.

BEGIN ALTERNATE PATH

  • 20. Place 2C LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

  • 21. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5C control switch in Manual Bypass and verify _____ _____ _____

closed.

22. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13B closed if not needed. _____ _____ _____

CUE:

2-1501-13B is not required for 2D LPCI pump.

S-N-d Page 7 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

23. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____

24. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A closed. _____ _____ _____

25. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A closed. _____ _____ _____

26. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____

27. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B closed. _____ _____ _____

28. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B closed. _____ _____ _____

29. Unlock AND open 2-1501- Instructs EO to complete 74C, U2 LPCI C PMP step G.12.e.(5).(a).

VENT VLV.

30. Crack open 2-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV until step G.12.e.(5).(b).

flow is observed from pipe. _____ _____ _____

31. Close 2(3)-1501-15C, U2 Instructs EO to complete LPCI C PMP VENT VLV. step G.12.e.(5).(c).
32. Close AND lock 2-1501-74C, Instructs EO to complete U2 LPCI C PMP step G.12.e.(5).(d).

VENT VLV.

S-N-d Page 8 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

33. Open 2-1501-47C-R, U2 Instructs EO to obtain PI 2-LPCI C PUMP SUCT PI 1501-47A reading per step 2-1501-47C ROOT VLV (at G.12.e.(6) and G.12.e(7).. _____ _____ _____

pump) and verify PI 2-1501-47C indicates less than 15 psig.

CUE:

Pressure is 10 psig. .

34. Recognizes reading is less Determines reading is than 15 psig. LESS than 15 psig.
35. Close 2-1501-47C-R, U2 Instructs EO to close 2-LPCI C PUMP SUCT PI 1501-47C per step G.12.e.(8). _____ _____ _____

2-1501-47C ROOT VLV.

  • 36. Unlock AND open 2-1501- Directs EO to perform 31C, U2 LPCI C PMP step G.12.e.(10)(a)

SUCT VLV FROM CST [at 2 C LPCI Pump]

CUE:

2-1501-31C is open.

  • 37. Unlock AND open 2-1501- Directs EO to perform 37, U2 LPCI & CS SUCT step G.12.e.(10)(b)

FROM 2/3A CST SV (located at 2/3A CST)

Simulator Operator / Evaluator:

Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.

CUE:

2-1501-37 is open.

S-N-d Page 9 of 12

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 38. Start 2C LPCI PP Places control switch to start. RED light illuminated.
39. Inform Unit Supervisor that Informs Unit Supervisor 2C LPCI pump is lined up that 2C LPCI pump is to the CST and the task is lined up to the CST and complete. injecting; the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-d Page 10 of 12

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 08 JPM Number: S-N-d Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance: 295031.A1.01 4.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 38 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-d Page 11 of 12

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST and inject to raise RPV water level per DEOP 0500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

S-N-d Page 12 of 12

Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)

JPM Number: S-N-e Revision Number: 06 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

Revision 06 Revised for 2014 NRC exam.

S-N-e Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
2. Ensure Torus water level is <30 feet.
3. Insert following Malfunctions and/or Remotes.
  • IMF CIGP2I (Spurious Group II Isolation)
  • IOR PCDOP61 OFF (prevents the 1601-61 valve from opening)
  • Adjusts Torus Level indications to ~20 feet.

ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20

  • ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
  • Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled

  • Adjusts Drywell & Torus pressures to 50.0 psig.

ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0

4. Verify the SBGT system operating and verify flow ~4000 scfm.
5. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.

S-N-e Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-e Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.

1. Verify SBGT is operating and Verifies 2/3A SBGT train flow is ~ 4000 scfm. FI 7540-13 is reading

~4000 scfm. _____ _____ _____

2. Verify Reactor Mode switch Verifies Reactor Mode NOT in RUN. switch NOT in RUN.
3. Place VENT ISOL SIGNAL Momentarily places BYPASS switch on 902-5 Bypass switch to Torus panel to TORUS. Position. _____ _____ _____

NOTE:

The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.

4. Open AO 2-1601-61, TORUS Places AO 2-1601-61 2-INCH VENT VLV. control switch to OPEN position and determines _____ _____ _____

that the valve will not open.

NOTE:

IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.

BEGIN ALTERNATE PATH

  • 5. Place VENT ISOL SIGNAL Momentarily places Vent BYPASS switch on 902-5 Isol Signal Bypass switch panel to DRYWELL. to Drywell position. _____ _____ _____

CUE:

If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter as read reads 56 psig and is trending UP slowly.

  • 6. Open AO 2-1601-62, DW Red Open light illuminated.

2-INCH Vent.

S-N-e Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 7. Open AO 2-1601-63, VENT Red Open light illuminated.

TO SBGT.

8. Determine if SBGT flow is Containment pressure adequate to control and stable or decreasing.

maintain Torus Bottom pressure below the Primary _____ _____ _____

Containment Pressure Limit.

CUE:

Torus bottom pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-e Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)

Revision Number: 06 JPM Number: S-N-e Task Number and

Title:

295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

DEOP 0500-04, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-e Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

S-N-e Page 8 of 8

Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE JPM Number: S-N-f Revision Number: 02 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for ILT 12-1 Cert Exam Revision 02 Revised for ILT 14-1 NRC Exam S-N-f Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • irf M63 open (Prevents TR-22 to Bus 23 breaker from closing).
3. Setup the following Triggers:
  • None.
4. Ensure ONLY 2 RFPs operating.
5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.

DOCUMENT PREPARATION

1. Marked up copy of DOP 6500-01, Transfer of 4160 Volt Bus Power Supply.

S-N-f Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-f Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOP 6500-01.

This task has two parts, which can be performed in any order.

CUE:

IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.

TRANSFER BUS 21 TO TR-22

  • 1. Position TR-22 to Bus 21 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

2. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

  • 3. Position TR-22 to Bus 21 RED light illuminated.

breaker control switch to CLOSE. _____ _____ _____

4. Verify:

SYNCHRONIZING meter at Meter NOT rotating.

12 oclock position.

TR-22 to Bus 21 breaker RED light illuminated.

indicates CLOSED.

Annunciator 902-8 D-1 in Annunciator 902-8 D-1 alarm. illuminated.

S-N-f Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Position TR-21 to Bus 21 GREEN light illuminated.

breaker control switch to TRIP. _____ _____ _____

6. Verify:

TR-21 to Bus 21 breaker GREEN light illuminated.

indicates OPEN.

Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.

extinguished.

7. Position TR-22 to Bus 21 Switch in OFF position.

synchroscope selector switch to OFF. _____ _____ _____

8. Verify Bus 21 AMMETER and Verifies Bus 21 amps and VOLTMETER indications are volts are normal.

normal. _____ _____ _____

NOTE:

Amps may vary depending on conditions, and volts are normally ~ 4160.

TRANSFER BUS 23 TO TR-22

  • 9. Position TR-22 to Bus 23 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

10. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

  • 11. Position TR-22 to Bus 23 Breaker does NOT close.

breaker control switch to CLOSE. _____ _____ _____

S-N-f Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Candidate should observe that the TR-22 to Bus 23 breaker did not close.

  • 12. IMMEDIATELY positions TR- GREEN light illuminated.

22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor. _____ _____ _____

NOTE:

Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.

If the TR-22 to Bus 23 breaker is the first breaker that was operated:

CUE:

Acknowledge report of the TR-22 to bus 23 breaker failed to close. Inform the candidate another operator will address Bus 23 and to continue with the transfer of Aux power on Bus 21.

13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-f Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE Revision Number: 02 JPM Number: S-N-f Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies.

K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 24 minutes Actual Time Used: minutes

References:

DOP 6500-01, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-f Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

S-N-f Page 9 of 9

Exelon Nuclear Job Performance Measure RBM - CLEAR RBM MALFUNCTION - (A)

JPM Number: S-N-g Revision Number: 01 Date: 01/15 Developed By:

Instructor Date Validated By:

SME or Instructor Date Review By:

Operations Representative Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for 2014 LORT NRC Exam.

Revision 01 Revised JPM for 14-1 ILT NRC Exam.

S-N-g Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with:

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

  • FCL 90 - 96%
  • A control rod available to withdraw which meets the following:

In-sequence.

Partially withdrawn.

Non-edge.

2. For development of this JPM, IC 152 with control rod sequence 2S.0.0 1646 (step 13 withdrawn) was used with the following:
  • Recirc flow at ~58 Mlbm/hr. (Can be adjusted higher if necessary)
3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae DOCUMENT PREPARATION Clean copy of DOA 0700-03, ROD OUT BLOCKS.

Copy of Special Maneuver Rod Move Sheets Copy DGP 03-01, Power Changes Copy of DAN 902(3)-5 A-7 CAEP file:

  1. S-N-g.cae
  1. For 14-1 ILT NRC Exam
  1. Written by MP
  1. Rev 01
  1. Date 01/15
  1. INITIAL CONDITIONS
  1. None S-N-g Page 3 of 10

Job Performance Measure (JPM)

  1. EVENT TRIGGERS
        1. Setup for JPM S-N-g, RBM - Clear RBM Malfunction - (A) ####
  1. Event Trigger 1 Activates when control rod D-04 is settling to position 16.
  1. Overrides RBM 7 Mode SW to STANDBY.
  1. Overrides RBM 7 902-37 NO BALANCE light ON.

trgset 1 "rdzactls(28) .gt. 44.0" ior nidrmod16 (1) off ior nidrmod15 (1) standby ior nilbnbal1 (1) true

  1. Event Trigger 2 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 OPERATE override.

trgset 2 "nidrmod1_drw(4)"l2 trg 2 "dor nidrmod16"l2

  1. Event Trigger 3 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 STANDBY override.

trgset 3 "nidrmod1_drw(4)"l2 trg 3 "dor nidrmod15"l2

  1. Event Trigger 4 Activates when RBM 7 is placed to ZERO NO. 2.
  1. Deletes RBM 7 NO BALANCE light override.

trgset 4 "nidrmod1_drw(4)"l2 trg 4 "dor nilbnbal1"l2

  1. END S-N-g Page 4 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to position 20 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-g Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT Note:

Although not a procedure step a second verifier is required. Second Verifier Duties:

Proper rod selected Insert and Withdraw limits understood.

Check off each control rod movement on the CRD Checklist.

1. Request a second verifier VERIFIES second verifier available.

Cue:

Inform examinee that you will perform duties of second verifier.

  • 2. Selects Control Rod D-04. Depresses Select Pushbutton for Control Rod D-04. Observes Full ______ _______ _____

Core Display and Apron Select lights for control rod D-04 lit.

NOTE:

An automatic Trigger inserts a failure for RBM 7 as control rod D-04 settles to position 16.

  • Momentarily places D-04 from position 14 to position Rod Movement
16. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 16.

4. Observe annunciator 902-5 A-7, Announces annunciator RBM HI/INOP is received. 902-5 A-7, RBM HI/INOP is received. ______ _______ _____

ALTERNATE PATH BEGINS

5. Depress the appropriate RBM Depresses the RBM PUSH TO SET-UP Push Buttons. PUSH TO SET-UP Push Buttons. ______ _______ _____

S-N-g Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

6. Verify only one Control Rod is Verifies only one rod is selected for movement, and that it selected on the rod select is in the proper sequence (the NO matrix and the NO ROD ______ _______ _____

ROD SELECTED Light on Panel SELECTED light for RBM 902(3)-37 should be 7 at panel 902-37 is extinguished). extinguished.

7. Check that there are NO unusually Verifies that there are no high LPRM indications, and that high LPRM indications there are the proper number of and RBM 7 has the ______ _______ _____

assigned LPRMs for each of the proper number of LPRMs RBM Channels. assigned.

NOTE:

When the examinee begins to printout control rod and LPRM printouts, provide the Examinee with the handouts in the JPM package.

CUE:

When the examinee states they would provide the printouts to the QNE for review, inform the examinee the QNE has reviewed the printouts and has no concerns.

8. Obtain a Control Rod Printout and Examinee reviews a LPRM Printout from the process printouts to verify no computer (Reference DOP 9950- concerns. ______ _______ _____

03 AND DOP 9950-07) to verify proper Control Rod Position and LPRM flux profile.

  • 9. Place the RBM 7 Mode Selector Places the RBM 7 Mode Switch to the ZERO 2 position and Selector Switch to the then move it to the STANDBY ZERO 2 position AND ______ _______ _____

Position. then to STANDBY.

NOTE:

This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.

  • 10. Place the RBM Mode Selector Places the RBM 7 Mode Switch to the OPERATE Position. Selector Switch to OPERATE ______ _______ _____

S-N-g Page 7 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

The RBM 7 INOP light on Panel 902-37 will go out.

ALTERNATE PATH ENDS

  • Momentarily places D-04 from position 16 to position Rod Movement
18. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 18.

  • Momentarily places D-04 from position 18 to position Rod Movement
20. Control switch to Rod ______ _______ _____

Out.

o Verifies Control Rod D-04 latches at position 20.

NOTE:

At this point the JPM is complete

13. Informs Unit Supervisor task is Examinee notifies the complete. Unit Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-g Page 8 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

RBM - Clear RBM Malfunction JPM Number: S-0700-16 Revision Number: 00 Task Number and

Title:

201L016, Respond to a rod out block.

K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 33 minutes Actual Time Used: minutes

References:

DOA 0700-03, rev 12; DAN 902-5 A-7, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-g Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the NSO assigned to move control rods.
2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.

INITIATING CUE

1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to 20 using single notch IAW DGP 03-01, Step G.2.w.
2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
3. Inform the Unit Supervisor when the task is complete.

S-N-g Page 10 of 10

Exelon Nuclear Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-h Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised JPM ILT 14-1 NRC Exam.

S-N-h Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure A AHU operating.
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.

S-N-h Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Another NSO will perform all log entries.
9. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05.
2. Inform the Unit Supervisor when the task is complete.

S-N-h Page 4 of 9

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-h Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOP 5750-05.

NOTE:

Train B AHU will automatically start when Train A AHU is secured.

CUE:

If asked as EO in the field, the Train B RCU oil level is in the sightglass.

  • 1. Secure Train A AHU using BLUE ON light OFF and control switch, 2/3A TRAIN GREEN OFF light lit.

CRM AIR HANDLING UNIT.

  • 2. Secure Train A Return Fan BLUE ON light OFF and using control switch, CRM GREEN OFF light lit.

RETURN FAN.

  • 3. Place Train B AHU control Control Switch RED target switch, CRM AIR HANDLING visible.

UNIT B, in Auto After Start. _____ _____ _____

4. Monitor PI 2/3 5740 36, CRM Observes a positive TO E TURB DP, to assure a pressure is being positive pressure is being maintained.

maintained in the Control Room.

5. Monitors the RCU Directs the EO, in the field, compressor suction pressure. to report the RCU compressor suction pressure. _____ _____ _____

CUE:

RCU suction pressure is 75 psig.

S-N-h Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

6. Monitors the RCU Directs the EO, in the field, compressor discharge to report the RCU pressure. compressor discharge pressure. _____ _____ _____

CUE:

RCU discharge pressure is 230 psig.

7. Monitors the RCU Directs the EO, in the field, compressor oil pressure, (40 to report the RCU to 60 psig above suction compressor oil pressure. _____ _____ _____

pressure).

CUE:

RCU compressor oil pressure is 125 psig.

8. States intention to monitor the Communicates need to RCU compressor oil level monitor oil pressure AFTER three hours of AFTER three hours of operation. operation.

CUE:

Acknowledge report.

9. Informs Unit Supervisor that Examinee notifies the Unit task is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-h Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CREV - SECURE A AHU AND STARTUP B AHU AND RCU Revision Number: 01 JPM Number: S-N-h Task Number and

Title:

288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.

K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 26 minutes Actual Time Used: minutes

References:

DOP 5750-05, rev 63 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-h Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Control Room Vent A AHU needs to be removed from service for maintenance.
3. There has NOT been any painting done anywhere in the plant within the last 14 days.
4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
7. RCU Cooling Water has been lined up.
8. Another NSO will perform all log entries.
9. An EO is stationed in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05.
2. Inform the Unit Supervisor when the task is complete.

S-N-h Page 9 of 9

Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-i Revision Number: 03 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Revision 03 Revised for ILT 14-1 NRC exam.

S-N-i Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION A clean copy of DOA 6600-01, Diesel Generator Failure.

S-N-i Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOA 6600-01, Diesel Generator Failure.

1. Proceeds to the 2/3 Diesel Proceeds to the 2/3 Diesel Generator Room. Generator Room.
  • 2. Examinee checks the level in Observes day tank the D/G Fuel Oil Day Tank. sightglass and determines day tank needs filling.

CUE:

Point to the lower third area on the local sightglass and state: the level is here.

NOTE:

Normal level is 30 - 38".

3. Verify that power is available Verifies power available, to the DIESEL FUEL OIL by local indicating lights TRANSFER PUMP 2/3. illuminated.

CUE:

The GREEN LIGHT is illuminated.

  • 4. Start the Fuel Oil Transfer Holds 2/3-5203 U2 Diesel Pump by holding local Test Oil Transfer Pp c/s in ON Switch in the ON position. position.

CUE:

The pump is running.

You have held the switch for approximately 5 minutes.

S-N-i Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

5. Checks the level in the fuel oil OBSERVES sight glass day tank. and/or REQUESTS annunciator 902-8 G-4 status. _____ _____ _____

CUE:

Point to the local sightglass at the 35 inch mark on the measuring stick and state: the level is here; OR, if requested the NSO says Control Room alarm 902-8 G-4 has reset.

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 03 JPM Number: S-N-i Task Number and

Title:

264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.

K/A Number and Importance: 264000.K1.05 3.2/3.3 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes

References:

DOA 6600-01, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 8 of 8

Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 01 Date: 12/14 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

Revision 01 New JPM developed for ILT 14-1 (2015-301) NRC Exam.

S-N-j Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DSSP 0100-CR, Attachment I.

S-N-j Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DSSP 0100-CR, Attachment I.

CB-1 key is required for entry into the Iso Cond makeup pump building.

The candidate may choose to start either engine.

  • 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN.

engine in RUN.

CUE:

The engine started.

2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running at 1802 RPM.

NOTE:

The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).

3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature
  • RPM BEGIN ALTERNATE PATH CUE:

Provide the following engine parameter values:

  • Oil pressure: 55 psi
  • Water Temperature 215oF
4. Recognizes that water > 205oF.

temperature has exceeded the high limit. _____ _____ _____

S-N-j Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF.

RUN toggle switch to OFF. _____ _____ _____

CUE:

The engine stopped.

  • 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN.

originally started. _____ _____ _____

CUE:

The engine started.

7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running at 1799 RPM.

8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature

Provide the following engine parameter values:

  • Oil pressure: 59 psi
  • Water Temperature 185oF
9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual.

operation.

S-N-j Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

Inform the candidate that another Operator will perform monitoring duties.

10. Reports to the SM/U2 US that SM/U2 US notified.

the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 01 JPM Number: S-N-j Task Number and

Title:

207N020, Start Isolation Condenser Makeup Pump.

K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

DSSP 0100-CR, rev 49 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 9 of 9

Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-k Revision Number: 11 Date: 01/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 09 Bank JPM.

Revision 10 Revised for 2010 NRC Exam.

Revision 11 Revised for ILT 14-1 NRC Exam S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DEOP 0500-03.

The examinee is NOT required to obtain a key to open or close locked valves.

The examinee is required only to identify which type of key is required to open the valve. (Master O)

1. Proceeds to the Unit 2 Proceeds to the U2 SBLC Standby Liquid Control area.

(SBLC) area. _____ _____ _____

  • 2. Unlock and close 2-1101-4, Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. hand wheel full clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 3. Unlock and close 2-1199-37 Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. handle 1/4 turn clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 4. Unlock and open 2-1101-8, Unlocks lock and removes SBLC TEST TK OUTLET SV. chain, then rotates valve hand wheel full counter- _____ _____ _____

clockwise...

CUE:

The component is in the condition you have described.

  • 5. Open 2-4315-500, CLEAN Rotates valve hand wheel DEMIN WTR SUPPLY TO full counter-clockwise.

SBLC SV.

  • 6. Open 2-1101-7, CLEAN Rotates valve hand wheel DEMIN WTR TO SBLC TEST full counter-clockwise.

TK SV. _____ _____ _____

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

You hear flow noises into the tank.

CUE:

The component is in the condition you have described.

  • 7. Start both SBLC pumps from Contacts the Unit 2 Control the main Control Room. Room Operator to start the SBLC pumps. _____ _____ _____

CUE:

You hear the squib valves fire, BOTH SBLC pumps start, and you hear flow noise.

CUE:

As the Unit 2 Control Room Operator: I have started both Unit 2 Standby Liquid Control pumps.

8. Throttle 2-1101-7, CLEAN Opens / closes valve to DEMIN WTR TO SBLC TEST maintain test tank level.

TK SV, to stabilize level in _____ _____ _____

tank.

CUE:

The test tank level is now stabilized (as much going in as is going out).

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 11 JPM Number: S-N-k Task Number and

Title:

295L088, Line Up SBLC Test Tank for Alternate Water Injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

S-N-k Page 8 of 8

Exelon Nuclear Job Performance Measure AUX POWER - CROSSTIE BUS 28 AND 29 JPM Number: S-N-l Revision Number: 02 Date: 04/15 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised to current procedure revision.

Revision 02 Revised to current procedure revision.

S-N-l Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 2. (Cold Shutdown)

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. On 902-4 panel perform the following:
  • Open AO 4723, DW N2 Backup.
  • Stop the running Pumpback Compressor.
3. On 902-7 panel perform the following:
  • Start the turbine EBOP.
  • Place the turbine turning gear in PTL.
  • Place the turbine turning gear oil pump in PTL.
  • Stop the turbine bearing lift pumps.
  • Start the generator ESOP.
  • Place the generator MSOP and Vacuum pump in PTL.
  • Start 2B Cond Transfer pump and stop 2A.
4. On 923-5 panel perform the following:
  • Start 2B S. Turb Bldg Vent Fan and stop 2A.
5. Ensure the MCC 28-7/29-7 feed is from Bus 29.
6. Ensure U2 125 VDC system is powered from Battery Charger 2.

NOTE: In the next steps the following will occur.

  • Group II and III isolations.
  • Instrument Bus will transfer to Reserve feed.

(setup continued on next page)

S-N-l Page 3 of 8

Job Performance Measure (JPM)

7. Insert following Malfunctions and/or Remotes.
  • irf cirwcujp in (Installs RWCU isol jumpers.)
  • Transfers 250 VDC to the 2/3 charger.

irf t51 true irf t50 false

  • irf r98 true (installs RPS 600 psig jumpers to prevent a full scram when RPS CH B is powered from alternate supply)
  • irf b04 true (lines up RPS CH B to alternate supply MCC 25-2)
  • irf csbukpfl open (Lines up ECCS keepfill to backup supply)
  • irf m89 open (Opens feed to MCC 28-2 to trip 2B RPS MG set and force instrument bus ABT to its reserve source)
  • imf at1 (Opens MCC 28-1 feed to ATS)
8. Override annunciator ACK buttons DEPRESSED for panels 902-4, -5, -6, -7, and -55 and the Silence button for one of the Common Panels.
9. Reset the GP III Isolation, place the RWCU Aux PP back on and reestablish blowdown so RPV level is stable.
10. Acknowledge and reset alarms.
11. During the performance of this JPM, audible panel alarms may sound if the ACK button is not overridden DEPRESSED. Perform the action of the 'other' NSO mentioned in the cue to silence any audible alarms.

DOCUMENT PREPARATION DOP 6700-02 Attachment A hardcard.

S-N-l Page 4 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. An NLO reports that Transformer 28 is overheating.
3. The Unit Supervisor decided that Transformer 28 needs to be de-energized.
4. Consideration of AC loads lost during the evolution has been completed and will have no major impact.
5. TS sections 3.8.7 and 3.8.8 have been checked and need not be referenced again
6. DOP 6800-05, Power Restoration to ATS feeds has been referenced. No actions are necessary.

INITIATING CUE

1. The Unit Supervisor has directed you to perform a dead bus transfer of Bus 28 to Bus 29 in accordance with the DOP 6700-02 hard card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-l Page 5 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee should locate the hard card, then provide the included copy.

Evaluator is to acknowledge all alarms except the 902-7 and 8 panel.

  • 1. Open Bus 23-1 to TR-28 Green light illuminated.

ACB.

2. Verifies and reports alarm Reports alarm 902-8 A-7.

902-8 A-7.

  • 3. Close Bus 29 & Bus 28 tie Red light illuminated.

ACB.

  • 4. Close Bus 28 & Bus 29 tie Red light illuminated.

ACB.

5. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-l Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - CROSSTIE BUS 28 AND 29 Revision Number: 02 JPM Number: S-N-f Task Number and

Title:

262L032 Crosstie 480V Busses 25, 26, 27, 28, and 29 K/A Number and Importance: 262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 11 minutes Actual Time Used: minutes

References:

DOP 6700-02, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-l Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. An NLO reports that Transformer 28 is overheating.
3. The Unit Supervisor decided that Transformer 28 needs to be de-energized.
4. Consideration of AC loads lost during the evolution has been completed and will have no major impact.
5. TS sections 3.8.7 and 3.8.8 have been checked and need not be referenced again
6. DOP 6800-05, Power Restoration to ATS feeds has been referenced. No actions are necessary.

INITIATING CUE

1. The Unit Supervisor has directed you to perform a dead bus transfer of Bus 28 to Bus 29 in accordance with the DOP 6700-02 hard card.
2. Inform the Unit Supervisor when the task is complete.

S-N-l Page 8 of 8