ML15292A389

From kanterella
Jump to navigation Jump to search
Comment (97) of Anthony Allen Bisset Opposing on the Renewal of Diablo Canyon Nuclear Power Plant, Units 1 and 2 License; Notice of Intent to Prepare an Environmental Impact Statement
ML15292A389
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/31/2015
From: Bisset A A
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
80FR37664, NRC-2009-0552
Download: ML15292A389 (2)


Text

9/1/20i5, i 9//215N RC-2009- 0552- DRAFT- 0091.html As of: 9/1/15 5:13 PM Received:

August 31_ 2015 PUBLIC SUBMISSION Status: PendingPost Tracking No. ljz-8kvb-bvvq Comments Due: August 31, 2015 Submission Type: Web Docket: NRC-2009-0552 Notice of Receipt and Availability of Application for Renewal of Diablo Canyon Nuclear Power Plant License Comment On: NRC-2009-0552-0026 Diablo Canyon Power Plant, Units 1 and 2; Notice of Intent to Prepare an Environmental Impact Statement

/2 .Document:

NRC-2009-0552-DRAFT-009 1 Comment on FR Doc # 2015-15921 I 73j Submitter Information

,-I-7 Name: Anthony Bisset -- ..i,..: 7V] 7 C-'t C-~i F- T..i'7" General Comment " Hello, My name is Anthony Allen Bisset.My entire being opposes Diablo Canyon's license being extended.

Not only does it sit on active fault(s)!

but the technology employed in this generation of plant is not fault tolerant (no pun intended) and cannot self power in the event of larger power grid emergency.

To wantonly extend licenses for reactors that are past their safe operating lifespan guarantees a significant accident will occur. If the NRC even wants nuclear to be part of our long term future, then stellar regulation of plants and accountability of operators is the only way the industry can weather another total failure such as Fukushima.

The statistics are just starting to come to light regarding the long-term impact that accident is producing and as the truth comes to light Nuclear power will be in even more disrepute.

From where I sit the R in NRC is the primary duty. As a citizen of earth who values low toxicity of my environment I expect Diablo Canyon's operating license to be revoked to safe guard the ocean and surrounding coastal areas from contamination during a large earthquake.

If the NRC fails to. regulate such shoddy plants *we* (which is you) will push harder for sanity to be restored.

Without nuclear operators upping their game entirely, it as an industry is a lost cause and I will dedicate a good .portion of my ingenuity to making it redundant through optimizing renewables and promoting untapped sources such as geothermal and hydrothermal.

Thank you for upholding your responsibility to yourself, your brothers and your organization by allowing new information to take -its appropriate place in your own value systems evolution and ethics.fi le:llC :/U sers/CAG/D ownl oads/N R C- 2009- 0552- DRAFT- 0091 .html1/1/2 9/1/2015 Sincerely, Anthony Allen Bisset N RC-2009-0552-DRAFT-0091 .htmi file:i/C :/U sers/CAG/D ownl oads/N RC- 2009- 0552- DRAFT- 0091.html 2 2/2 9/1/20i5, i 9//215N RC-2009- 0552- DRAFT- 0091.html As of: 9/1/15 5:13 PM Received:

August 31_ 2015 PUBLIC SUBMISSION Status: PendingPost Tracking No. ljz-8kvb-bvvq Comments Due: August 31, 2015 Submission Type: Web Docket: NRC-2009-0552 Notice of Receipt and Availability of Application for Renewal of Diablo Canyon Nuclear Power Plant License Comment On: NRC-2009-0552-0026 Diablo Canyon Power Plant, Units 1 and 2; Notice of Intent to Prepare an Environmental Impact Statement

/2 .Document:

NRC-2009-0552-DRAFT-009 1 Comment on FR Doc # 2015-15921 I 73j Submitter Information

,-I-7 Name: Anthony Bisset -- ..i,..: 7V] 7 C-'t C-~i F- T..i'7" General Comment " Hello, My name is Anthony Allen Bisset.My entire being opposes Diablo Canyon's license being extended.

Not only does it sit on active fault(s)!

but the technology employed in this generation of plant is not fault tolerant (no pun intended) and cannot self power in the event of larger power grid emergency.

To wantonly extend licenses for reactors that are past their safe operating lifespan guarantees a significant accident will occur. If the NRC even wants nuclear to be part of our long term future, then stellar regulation of plants and accountability of operators is the only way the industry can weather another total failure such as Fukushima.

The statistics are just starting to come to light regarding the long-term impact that accident is producing and as the truth comes to light Nuclear power will be in even more disrepute.

From where I sit the R in NRC is the primary duty. As a citizen of earth who values low toxicity of my environment I expect Diablo Canyon's operating license to be revoked to safe guard the ocean and surrounding coastal areas from contamination during a large earthquake.

If the NRC fails to. regulate such shoddy plants *we* (which is you) will push harder for sanity to be restored.

Without nuclear operators upping their game entirely, it as an industry is a lost cause and I will dedicate a good .portion of my ingenuity to making it redundant through optimizing renewables and promoting untapped sources such as geothermal and hydrothermal.

Thank you for upholding your responsibility to yourself, your brothers and your organization by allowing new information to take -its appropriate place in your own value systems evolution and ethics.fi le:llC :/U sers/CAG/D ownl oads/N R C- 2009- 0552- DRAFT- 0091 .html1/1/2 9/1/2015 Sincerely, Anthony Allen Bisset N RC-2009-0552-DRAFT-0091 .htmi file:i/C :/U sers/CAG/D ownl oads/N RC- 2009- 0552- DRAFT- 0091.html 2 2/2