Exelon Nuclear Job Performance Measure ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)
JPM Number: S-N-a Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-a Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM. for 2014 ILT NRC exam
S-N-a Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- Adjust Core flow to establish ~850 MWe.
- Verify 95 - 100 FCL.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None
- 3. Setup the following Triggers:
- trgset 1 "ppg228.gt. 890.0" (Activates when Generator load is > 890 MWe)
- ior asdaemtrp (1) 2 (Trips 2A Recirc pump)
DOCUMENT PREPARATION
- 1. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with recirc flow.
- 2. A Maneuvering REMA marked up to point of raising power with recirc flow.
- 3. Clean copy of DOP 0202-03, Reactor Recirculation Flow Control System Operation.
- 4. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One or Both Pumps.
S-N-a Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
- 3. The TSO has requested raising Unit 2 load to 900 MWe.
INITIATING CUE
- 1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of:
Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps, hand him the supplied copy of it.
- 1.
Depresses one of the Panel 902-5 Recirc Master Manual Control raise speed pushbuttons. (Repeats this step to continue load pickup)
Depresses one of the following Panel 902-5 Recirc Master Manual Control raise speed pushbuttons 0.5 sec, but <
10 sec:
RAISE HIGH (0.06%)
RAISE MED (0.18%)
RAISE LOW (0.90%)
- 2.
Verifies expected response after each speed bump.
Verifies Recirc pump speeds, Core flow, Rx power and other plant parameters change as expected.
NOTE:
An automatic Trigger is setup to trip 2A Recirc pump when its speed reaches 82%.
BEGIN ALTERNATE PATH
- 3.
Announces 2A Recirc pump trip and enters DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps.
Announces 2A Recirc pump trip and enters DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps.
S-N-a Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart.
Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart.
CUE:
If the Examinee begins to do any of the following from the right side of the Hardcard, inform the Examinee that as the CRS I assigned another operator to perform it:
Monitor MSL & off gas rad monitors for increased activity.
Notify QNE to monitor core parameters.
Notify Chemistry to take samples per TS and ODCM if power change was 20% thermal in one hour.
- 5.
Closes 2A Recirc Pump discharge valve MO 2-0202-5A Rotates 2A PP DISCH VLV MO 2-202-5A CCW to the CLOSE position.
Verifies the valves CLOSE light lit and OPEN light out.
NOTE:
While waiting for the 5 minutes to elapse, the Examinee should continue with the rest of the steps.
- 6.
After 5 minutes, opens recirc pump discharge valve previously closed.
Rotates 2A PP DISCH VLV MO 2-202-5A CW to the OPEN position.
Verifies the valves OPEN light lit and CLOSE light out.
- 7.
Inserts CRAM Rods per DGP 03-04 to reduce Reactor power to 35 to 40%
CRAM rods inserting with expected power reduction.
S-N-a Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
After the insertion of several CRAM rods, as the CRS state another operator will take over inserting CRAM rods. Your task is complete.
- 8.
Repeats back another operator will take over inserting CRAM rods. My task is complete Repeats back another operator will take over inserting CRAM rods. My task is complete
- 9.
Informs Evaluator the Task is complete.
Informs Evaluator the Task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-a Page 8 of 9 Operators Name:
Job
Title:
Title:
ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)
JPM Number: S-N-a Revision Number: 00 Task Number and
Title:
202L024, Change Recirc pump speed on both Recirc pumps using ASD Tandem controls.
K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 36 minutes Actual Time Used:
minutes
References:
DOP 0202-03, rev 43 and DOA 0202-01, rev 42 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-a Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
- 3. The TSO has requested raising Unit 2 load to 900 MWe.
INITIATING CUE
- 1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-b Page 1 of 9 Exelon Nuclear Job Performance Measure RAPIDLY SECURE THE RWCU SYSTEM WITH THE REACTOR AT PRESSURE JPM Number: S-N-b Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-b Page 2 of 9 Revision Record (Summary)
Revision 01 Update for the 2014 ILT NRC exam.
S-N-b Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC where the reactor is at or close to normal operating pressure
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None
- 3. Setup the following Triggers:
- trgset 1 "rtdmn02_drw.and. (rtwmn02.le. 0.05)" (Activates when RWCU pressure controller is in MAN and the pot is <0.05 demand)
- ior rtwmn02 (1) 0.0 (This overrides the demand to 0.0 since the lowest the demand goes is 0.02 which causes the RWCU system to isolate before the operator can isolate it)
DOCUMENT PREPARATION
S-N-b Page 4 of 9 INITIAL CONDITIONS
- 1.
A leak is present in the U2 RWCU system.
- 2.
RWCU Blowdown was NOT established.
- 3.
PCV bypass 2-1201-43 is CLOSED.
INITIATING CUE
- 1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
G.4.
Proceeds to step G.4 of the procedure Proceeds to the correct step for rapid securing NOTE:
Step G.4.a directs examinee to Hard Card.
NOTE:
Pump should trip in step 1 when demand is adjusted to zero. In Step 2 action to stop pump, the Examinee should verify that the pump is tripped OR stops the pump prior to closing valves in the following steps.
This is a critical action (verify or stop pump) to prevent forcing an automatic protective action that trips the pump when the system is isolated.
- 1.
Place PIC 2(3)-1290-2 PRESSURE CONTLR, in MANUAL.
AND Adjust demand to zero (0) to close the valve.
Rotates outer collar CW to MAN.
Rotates inner knob CCW to zero indication on horizontal indicator.
Annunciators 902-4 A-10, B-11, B-12 and C-12 alarm.
- 2.
Stop 2(3) A(B) RWCU RECIRC PP.
Verifies 2A pump tripped OR Places 2A pump control switch to STOP and verifies:
Blue ON light OFF Green OFF light ON
- 3.
Verify the following valves are closed:
MO 2(3)-1201-1, RX OUTLET ISOL.
Momentarily places MO 2-1201-1, RX OUTLET ISOL, control switch to CLOSE, and verifies its Red Close light ON.
MO 2-1201-1A, RX OUTLET BYP.
Verifies MO 2-1201-1A, RX OUTLET BYP, Green Close light ON.
S-N-b Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
MO 2-1201-2, INLET ISOL.
Momentarily places MO 2-1201-2, INLET ISOL, control switch to CLOSE, and verifies its Red Close light ON.
MO 2-1201-7, RX RETURN VLV.
Momentarily places MO 2-1201-7, RX RETURN VLV, control switch to CLOSE, and verifies its Red Close light ON.
Verifies MO 2-1201-8, RWCU PP BYP, Red Close light ON.
NOTE:
Steps 4 and 5 on Hardcard are N/A as blowdown was not established (per initial conditions).
Step 5 is not an If / Then so the Examinee may verify that the actions within the step are complete.
6 Close MO 2(3)-1201-9A(B),
A(B) RWCU PP DISCH Places MO 2-1201-9A, A RWCU PP DISCH, control switch to CLOSE and verifies Green Closed light ON NOTE:
Step 7 is N/A as PCV bypass is closed. (Per initial conditions).
- 8.
Notify Chemistry that RWCU has been isolated, (Noble Metals Monitor should be isolated)
Notifies Chemistry.
CUE:
Respond that Chemistry has been notified.
NOTE:
Step 9 action is to be taken by another operator.
9 Enter substitute values for computer points to ensure the heat balance is accurate.
Will address entering computer points.
CUE:
Inform the examinee that the another NSO will enter substitute values for step 9 of the Hard Card.
Report to the Unit Supervisor that RWCU has been rapidly secured.
Reports that RWCU has been secured.
S-N-b Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
CUE:
Acknowledge the report.
END JPM Stop Time:_________
S-N-b Page 8 of 9 Operators Name: ___________________________________
Job
Title:
Title:
Rapidly Secure the RWCU System with the Reactor at Pressure JPM Number: S-N-b Revision Number: 01 Task Number and
Title:
204L005, Secure the RWCU System with the reactor at pressure K/A Number and Importance: 20400A4.06 3.0/2.9 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
__10___minutes Actual Time Used: _______minutes
References:
DOP 1200-03, Rev 66 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
S-N-b Page 9 of 9 INITIAL CONDITIONS
- 1.
A leak is present in the U2 RWCU system.
- 2.
RWCU Blowdown was NOT established.
- 3.
PCV bypass 2-1201-43 is CLOSED.
INITIATING CUE
- 1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 02 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-c Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Modified for ILT 12-1 Cert Exam Revision 02 Modified for ILT 14-1 NRC Exam
S-N-c Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure that Both DEHC monitors are displaying the STATUS screen.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Clean copy of DGP 02-03, Reactor Scram.
S-N-c Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin an 85.0 Deg. F. / hr reactor cooldown to 350 Deg. F. utilizing the Hardcard.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the provided copy of DGP 02-03.
All the below actions can be performed on either of the Digital EHC control stations.
- 1.
Select <CONTROL>.
Utilizing the trackball controller, clicks on
<CONTROL>.
- 2.
Select <RX COOLDOWN>.
Utilizing the trackball controller, clicks on
<COOLDOWN>.
- 3.
Verify REACTOR COOLDOWN is OFF.
Observes the REACTOR COOLDOWN OFF select button is orange.
- 4.
Select STPT/RAMP.
Utilizing the trackball controller, clicks on the
<STPT/RAMP>.
- 5.
Enter desired target temperature setpoint.
Clicks in the Set Point box.
Utilizing the keyboard, enters 350.0.
- 6.
Enter desired cooldown rate in the Ramp box.
Clicks in the Ramp Rate box. Utilizing the keyboard, enters 85.0.
- 7.
Select <OK>...
Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up window.
S-N-c Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 8.
Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN.
Utilizing the trackball controller, clicks on <ON>.
Clicks <OK> on the Begin Reactor Cooldown pop up window.
Verifies Cooldown occurring using any of the following:
o Recirc temperature dropping o Reactor pressure dropping.
- 9.
On <CONTROL>
<PRESSURE CONTROL>
screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on
<PRESSURE CONTROL>.
- 10. On <CONTROL> <BPV JACK> screen, verify BPV Jack position setpoint is
-5.0%.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >.
Observes BPV Jack position setpoint is -5.0%.
- 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
S-N-c Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment END JPM Stop Time:_________
S-N-c Page 8 of 9 Operators Name:
Job
Title:
Title:
DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES Revision Number: 02 JPM Number: S-N-c Task Number and
Title:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DGP 02-03, rev 104 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-c Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin an 85.0 Deg. F. / hr reactor cooldown to 350 Deg. F. utilizing the Hardcard.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 08 Date: 1/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-d Page 2 of 11 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 12-1 Cert Exam.
Revision 08 Revised for ILT 14-1 NRC Exam.
S-N-d Page 3 of 11 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify NO LPCI pumps operating.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
S-N-d Page 4 of 11 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 0500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 5 of 11 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03.
- 1.
Place 2A LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 2.
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
RED light illuminated.
- 3.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
RED light illuminated.
CUE:
2-1501-13A is not required for 2B LPCI pump.
NOTE:
The following valves may be verified in any order
- 4.
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 5.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
- 6.
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
- 7.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
S-N-d Page 6 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 9.
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
GREEN lights illuminated.
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
Instructs EO to complete step G.12.c.(5).(a).
Instructs EO to complete step G.12.c.(5).(b).
Instructs EO to complete step G.12.c.(5).(c).
Instructs EO to complete step G.12.c.(5).(d).
- 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6).
CUE:
PI 2-1501-47A indicates 15.5 psig.
- 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
S-N-d Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Instructs EO to close 2-1501-47A per step G.12.c.(8).
CUE:
2-1501-47A-R is Closed.
- 17. Open PP SUCT VLV MO 2-1501-5A.
GREEN light illuminated.
- 18. Place 2A LPCI PP control switch in AUTO.
Depresses and places 2A LPCI PP c/s to center (AUTO) position.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
CUE:
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
BEGIN ALTERNATE PATH
- 20. Place 2C LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 21. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed.
RED light illuminated.
- 22. Verify MIN FLOW VLV 2-1501-13B closed if not needed.
RED light illuminated.
CUE:
2-1501-13B is not required for 2D LPCI pump.
S-N-d Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 23. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 24. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
GREEN lights illuminated.
- 26. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 27. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
GREEN lights illuminated.
Instructs EO to complete step G.12.e.(5).(a).
Instructs EO to complete step G.12.e.(5).(b).
Instructs EO to complete step G.12.e.(5).(c).
Instructs EO to complete step G.12.e.(5).(d).
S-N-d Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 33. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47A reading per step G.12.e.(6).
CUE:
Pressure is 10 psig..
- 34. Recognizes reading is less than 15 psig.
Determines reading is LESS than 15 psig.
Instructs EO to close 2-1501-47C per step G.12.e.(8).
Directs EO to perform step G.12.e.(10)(a)
Directs EO to perform step G.12.e.(10)(b)
Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-d Page 10 of 11 Operators Name:
Job
Title:
Title:
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 08 JPM Number: S-N-d Task Number and
Title:
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000A1.04 3.6/3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 38 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-d Page 11 of 11 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 0500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)
JPM Number: S-N-e Revision Number: 06 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-e Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 06 Revised for 2014 NRC exam.
S-N-e Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
- 2. Ensure Torus water level is <30 feet.
- 3. Insert following Malfunctions and/or Remotes.
IMF CIGP2I (Spurious Group II Isolation)
IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
- 5. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
- 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
S-N-e Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, Attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide examinee the marked up copy of DEOP 0500-04.
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
- 1.
Verify SBGT is operating and flow is ~ 4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading
~4000 scfm.
- 2.
Verify Reactor Mode switch NOT in RUN.
Verifies Reactor Mode switch NOT in RUN.
- 3.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Momentarily places Bypass switch to Torus Position.
NOTE:
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
- 4.
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.
NOTE:
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
BEGIN ALTERNATE PATH
- 5.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to DRYWELL.
Momentarily places Vent Isol Signal Bypass switch to Drywell position.
CUE:
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
- 6.
Open AO 2-1601-62, DW 2-INCH Vent.
Red Open light illuminated.
S-N-e Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Open AO 2-1601-63, VENT TO SBGT.
Red Open light illuminated.
- 8.
Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.
Containment pressure stable or decreasing.
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-e Page 7 of 8 Operators Name:
Job
Title:
Title:
CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)
Revision Number: 06 JPM Number: S-N-e Task Number and
Title:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DEOP 0500-04, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-e Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE JPM Number: S-N-f Revision Number: 02 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-f Page 2 of 9 Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for ILT 12-1 Cert Exam Revision 02 Revised for ILT 14-1 NRC Exam
S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- irf M63 open (Prevents TR-22 to Bus 23 breaker from closing).
- 3. Setup the following Triggers:
- None.
- 4. Ensure ONLY 2 RFPs operating.
- 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
- 1.
Marked up copy of DOP 6500-01, Transfer of 4160 Volt Bus Power Supply.
S-N-f Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 6500-01.
This task has two parts, which can be performed in any order.
CUE:
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
- 1.
Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 2.
Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 3.
Position TR-22 to Bus 21 breaker control switch to CLOSE.
RED light illuminated.
- 4.
Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902-8 D-1 in alarm.
Meter NOT rotating.
RED light illuminated.
Annunciator 902-8 D-1 illuminated.
S-N-f Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Position TR-21 to Bus 21 breaker control switch to TRIP.
GREEN light illuminated.
- 6.
Verify:
TR-21 to Bus 21 breaker indicates OPEN.
Annunciator 902-8 D-1 clears.
GREEN light illuminated.
Annunciator 902-8 D-1 extinguished.
- 7.
Position TR-22 to Bus 21 synchroscope selector switch to OFF.
Switch in OFF position.
- 8.
Verify Bus 21 AMMETER and VOLTMETER indications are normal.
Verifies Bus 21 amps and volts are normal.
NOTE:
Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
- 9.
Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 10. Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 11. Position TR-22 to Bus 23 breaker control switch to CLOSE.
Breaker does NOT close.
S-N-f Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Candidate should observe that the TR-22 to Bus 23 breaker did not close.
- 12. IMMEDIATELY positions TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.
GREEN light illuminated.
NOTE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
If the TR-22 to Bus 23 breaker is the first breaker that was operated:
CUE:
Acknowledge report of the TR-22 to bus 23 breaker failed to close. Inform the candidate another operator will address Bus 23 and to continue with the transfer of Aux power on Bus 21.
- 13. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-f Page 8 of 9 Operators Name:
Job
Title:
Title:
AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE Revision Number: 02 JPM Number: S-N-f Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 24 minutes Actual Time Used:
minutes
References:
DOP 6500-01, rev 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-f Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure RBM - CLEAR RBM MALFUNCTION - (A)
JPM Number: S-N-g Revision Number: 01 Date: 01/15 Developed By:
Instructor Date Validated By:
SME or Instructor Date Review By:
Operations Representative Date Approved By:
Training Department Date
S-N-g Page 2 of 10 Revision Record (Summary)
Revision 00 New JPM for 2014 LORT NRC Exam.
Revision 01 Revised JPM for 14-1 ILT NRC Exam.
S-N-g Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with:
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- FCL 90 - 96%
- A control rod available to withdraw which meets the following:
In-sequence.
Partially withdrawn.
Non-edge.
- 2. For development of this JPM, IC 152 with control rod sequence 2S.0.0 1646 (step 13 withdrawn) was used with the following:
- Insert Control Rod D-04 from position 20 to 14.
- Recirc flow at ~58 Mlbm/hr. (Can be adjusted higher if necessary)
- 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae DOCUMENT PREPARATION Clean copy of DOA 0700-03, ROD OUT BLOCKS.
CAEP file:
- S-N-g.cae
- For 14-1 ILT NRC Exam
- Written by MP
- Rev 01
- Date 01/15
- INITIAL CONDITIONS
- None
- EVENT TRIGGERS
S-N-g Page 4 of 10
- Event Trigger 1 Activates when control rod D-04 is settling to position 16.
- Overrides RBM 7 902-37 NO BALANCE light ON.
trgset 1 "rdzactls(28).gt. 44.0" ior nidrmod16 (1) off ior nidrmod15 (1) standby ior nilbnbal1 (1) true
- Event Trigger 2 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 OPERATE override.
trgset 2 "nidrmod1_drw(4)"l2 trg 2 "dor nidrmod16"l2
- Event Trigger 3 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 STANDBY override.
trgset 3 "nidrmod1_drw(4)"l2 trg 3 "dor nidrmod15"l2
- Event Trigger 4 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 NO BALANCE light override.
trgset 4 "nidrmod1_drw(4)"l2 trg 4 "dor nilbnbal1"l2
- END
S-N-g Page 5 of 10 INITIAL CONDITIONS
- 1. You are the NSO assigned to move control rods.
- 2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.
INITIATING CUE
- 1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to position 20 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
- 2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Note:
Although not a procedure step a second verifier is required. Second Verifier Duties:
Proper rod selected Insert and Withdraw limits understood.
Check off each control rod movement on the CRD Checklist.
- 1.
Request a second verifier VERIFIES second verifier available.
Cue:
Inform examinee that you will perform duties of second verifier.
- 2.
Selects Control Rod D-04.
Depresses Select Pushbutton for Control Rod D-04. Observes Full Core Display and Apron Select lights for control rod D-04 lit.
NOTE:
An automatic Trigger inserts a failure for RBM 7 as control rod D-04 settles to position 16.
- 3.
Single notches out Control Rod D-04 from position 14 to position
- 16.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 16.
- 4.
Observe annunciator 902-5 A-7, RBM HI/INOP is received.
Announces annunciator 902-5 A-7, RBM HI/INOP is received.
ALTERNATE PATH BEGINS
- 5.
Depress the appropriate RBM PUSH TO SET-UP Push Buttons.
Depresses the RBM PUSH TO SET-UP Push Button for RBM 7.
S-N-g Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Verify only one Control Rod is selected for movement, and that it is in the proper sequence (the NO ROD SELECTED Light on Panel 902(3)-37 should be extinguished).
Verifies only one rod is selected on the rod select matrix and the NO ROD SELECTED light for RBM 7 at panel 902-37 is extinguished.
- 7.
Check that there are NO unusually high LPRM indications, and that there are the proper number of assigned LPRMs for each of the RBM Channels.
Verifies that there are no high LPRM indications and RBM 7 has the proper number of LPRMs assigned.
CUE:
When the examinee begins to use the Plant Process computer to obtain printouts, inform the examinee Another NSO has printed the Control Rod Printout and a LPRM Printout, the QNE has reviewed the printouts and has no concerns.
- 8.
Obtain a Control Rod Printout and a LPRM Printout from the process computer (Reference DOP 9950-03 AND DOP 9950-07) to verify proper Control Rod Position and LPRM flux profile.
Uses a Plant Process Computer terminal to print Control Rod and LPRM printouts.
- 9.
Place the RBM 7 Mode Selector Switch to the ZERO 2 position and then move it to the STANDBY Position.
Places the RBM 7 Mode Selector Switch to the ZERO 2 position AND then to STANDBY.
NOTE:
This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.
- 10.
Place the RBM Mode Selector Switch to the OPERATE Position.
Places the RBM 7 Mode Selector Switch to OPERATE
S-N-g Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
The RBM 7 INOP light on Panel 902-37 will go out.
ALTERNATE PATH ENDS
- 11.
Single notches out Control Rod D-04 from position 16 to position
- 18.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 18.
- 12.
Single notches out Control Rod D-04 from position 18 to position
- 20.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 20.
NOTE:
At this point the JPM is complete
- 13.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-g Page 9 of 10 Operators Name:
Job
Title:
Title:
RBM - Clear RBM Malfunction JPM Number: S-0700-16 Revision Number: 00 Task Number and
Title:
201L016, Respond to a rod out block.
K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 33 minutes Actual Time Used:
minutes
References:
DOA 0700-03, rev 12; DAN 902-5 A-7, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-g Page 10 of 10 INITIAL CONDITIONS
- 1. You are the NSO assigned to move control rods.
- 2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.
INITIATING CUE
- 1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to 20 using single notch IAW DGP 03-01, Step G.2.w.
- 2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
- 3. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-h Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-h Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised JPM ILT 14-1 NRC Exam.
S-N-h Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure A AHU operating.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.
S-N-h Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
- 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
- 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
- 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
- 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
- 7. RCU Cooling Water has been lined up.
- 8. Another NSO will perform all log entries.
- 9. An EO is stationed in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05, step G.1.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-h Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 6 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOP 5750-05.
NOTE:
Train B AHU will automatically start when Train A AHU is secured.
- 1.
Secure Train A AHU using control switch, 2/3A TRAIN CRM AIR HANDLING UNIT.
BLUE ON light OFF and GREEN OFF light lit.
- 2.
Secure Train A Return Fan using control switch, CRM RETURN FAN.
BLUE ON light OFF and GREEN OFF light lit.
- 3.
Place Train B AHU control switch, CRM AIR HANDLING UNIT B, in Auto After Start.
Control Switch RED target visible.
- 4.
Monitor PI 2/3 5740 36, CRM TO E TURB DP, to assure a positive pressure is being maintained in the Control Room.
Observes a positive pressure is being maintained.
- 5.
Monitors the RCU compressor suction pressure.
Directs the EO, in the field, to report the RCU compressor suction pressure.
CUE:
RCU suction pressure is 75 psig.
- 6.
Monitors the RCU compressor discharge pressure.
Directs the EO, in the field, to report the RCU compressor discharge pressure.
S-N-h Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
RCU discharge pressure is 230 psig.
- 7.
Monitors the RCU compressor oil pressure, (40 to 60 psig above suction pressure).
Directs the EO, in the field, to report the RCU compressor oil pressure.
CUE:
RCU suction pressure is 125 psig.
- 8.
States intention to monitor the RCU compressor oil level AFTER three hours of operation.
Communicates need to monitor oil pressure AFTER three hours of operation.
CUE:
Acknowledge report.
- 9.
Informs Unit Supervisor that task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-h Page 8 of 9 Operators Name:
Job
Title:
Title:
CREV - SECURE A AHU AND STARTUP B AHU AND RCU Revision Number: 01 JPM Number: S-N-h Task Number and
Title:
288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.
K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 26 minutes Actual Time Used:
minutes
References:
DOP 5750-05, rev 63 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-h Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
- 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
- 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
- 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
- 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
- 7. RCU Cooling Water has been lined up.
- 8. Another NSO will perform all log entries.
- 9. An EO is stationed in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05, step G.1.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-i Revision Number: 03 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-i Page 2 of 8 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for ILT 14-1 NRC exam.
S-N-i Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION A clean copy of DOA 6600-01, Diesel Generator Failure.
S-N-i Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOA 6600-01, Diesel Generator Failure.
- 1.
Proceeds to the 2/3 Diesel Generator Room.
Proceeds to the 2/3 Diesel Generator Room.
- 2.
Examinee checks the level in the D/G Fuel Oil Day Tank.
Observes day tank sightglass and determines day tank needs filling.
CUE:
Point to the lower third area on the local sightglass and state: the level is here.
NOTE:
Normal level is 30 - 38".
- 3.
Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3.
Verifies power available, by local indicating lights illuminated.
CUE:
The GREEN LIGHT is illuminated.
- 4.
Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.
Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position.
CUE:
The pump is running.
You have held the switch for approximately 5 minutes.
S-N-i Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Checks the level in the fuel oil day tank.
OBSERVES sight glass and/or REQUESTS annunciator 902-8 G-4 status.
CUE:
Point to the local sightglass at the 35 inch mark on the measuring stick and state: the level is here; OR, if requested the NSO says Control Room alarm 902-8 G-4 has reset.
- 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-i Page 7 of 8 Operators Name:
Job
Title:
Title:
EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 03 JPM Number: S-N-i Task Number and
Title:
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
K/A Number and Importance: 264000.K1.05 3.2/3.3 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 16 minutes Actual Time Used:
minutes
References:
DOA 6600-01, rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-i Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-j Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
Revision 01 New JPM developed for ILT 14-1 (2015-301) NRC Exam.
S-N-j Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this is an in-plant JPM.
DOCUMENT PREPARATION
- 1.
Clean copy of DSSP 0100-CR, Attachment I.
S-N-j Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of DSSP 0100-CR, Attachment I.
CB-1 key is required for entry into the Iso Cond makeup pump building.
The candidate may choose to start either engine.
- 1.
Place the REMOTE-OFF-RUN toggle switch for either engine in RUN.
Switch at panel 2223-126A or B, placed in RUN.
CUE:
The component is in the condition you described.
- 2.
Verify engine starts and comes up to stable speed.
Engine RPM indicator on panel 2223-126A or B is checked.
CUE:
The engine has started and is running at 1802 RPM.
NOTE:
The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).
- 3.
Monitor the following engine parameters to ensure limits are NOT exceeded:
- Oil Pressure
- Water Temperature
- RPM Checks the parameters on the LCD display.
BEGIN ALTERNATE PATH CUE:
Provide the following engine parameter values:
- Oil pressure: 55 psi
- Water Temperature 215oF
- RPM 1802 rpm
- 4.
Recognizes that water temperature has exceeded the high limit.
> 205oF.
S-N-j Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Stops running engine by placing the REMOTE-OFF-RUN toggle switch to OFF.
Switch at panel 2223-126A or B, placed in OFF.
CUE:
The component is in the condition you described.
- 6.
Starts the opposite IC Makeup Pump, than was originally started.
Switch at panel 2223-126A or B, placed in RUN.
CUE:
The component is in the condition you described.
- 7.
Verify engine starts and comes up to stable speed.
Engine RPM indicator on panel 2223-126A or B is checked.
CUE:
The engine has started and is running.
- 8.
Monitor the following engine parameters to ensure limits are NOT exceeded:
- Oil Pressure
- Water Temperature
- RPM Checks the parameters on the LCD display.
CUE:
Provide the following engine parameter values:
- Oil pressure: 59 psi
- Water Temperature 185oF
- RPM 1799 rpm
- 9.
Notifies SM/U2 US that an Iso Cond Makeup Pump is in operation.
Notifies appropriate individual.
S-N-j Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
Inform the candidate that another Operator will perform monitoring duties.
- 10. Reports to the SM/U2 US that the task is complete.
SM/U2 US notified.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-j Page 8 of 9 Operators Name:
Job
Title:
Title:
ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 01 JPM Number: S-N-j Task Number and
Title:
207N020, Start Isolation Condenser Makeup Pump.
K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DSSP 0100-CR, rev 49 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-j Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-k Revision Number: 11 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-k Page 2 of 8 Revision Record (Summary)
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
Revision 11 Revised for ILT 14-1 NRC Exam
S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-k Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DEOP 0500-03.
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is required only to identify which type of key is required to open the valve.
- 1.
Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.
Proceeds to the U2 SBLC area.
- 2.
Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full clockwise.
CUE:
The component is in the condition you have described.
- 3.
Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.
CUE:
The component is in the condition you have described.
- 4.
Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV.
Unlocks lock and removes chain, then rotates valve hand wheel full counter-clockwise...
CUE:
The component is in the condition you have described.
- 5.
Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV.
Rotates valve hand wheel full counter-clockwise.
- 6.
Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV.
Rotates valve hand wheel full counter-clockwise.
S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
The component is in the condition you have described.
- 7.
Start both SBLC pumps from the main Control Room.
Contacts the Unit 2 Control Room Operator to start the SBLC pumps.
CUE:
I have started both Unit 2 Standby Liquid Control pumps.
- 8.
Throttle 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank.
Opens / closes valve to maintain test tank level.
CUE:
The test tank level is now stabilized (as much going in as is going out).
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-k Page 7 of 8 Operators Name:
Job
Title:
Title:
LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 11 JPM Number: S-N-k Task Number and
Title:
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-k Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)
JPM Number: S-N-a Revision Number: 00 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-a Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM. for 2014 ILT NRC exam
S-N-a Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- Adjust Core flow to establish ~850 MWe.
- Verify 95 - 100 FCL.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None
- 3. Setup the following Triggers:
- trgset 1 "ppg228.gt. 890.0" (Activates when Generator load is > 890 MWe)
- ior asdaemtrp (1) 2 (Trips 2A Recirc pump)
DOCUMENT PREPARATION
- 1. A copy of DGP 03-01, Power Changes, marked up to the point of raising power with recirc flow.
- 2. A Maneuvering REMA marked up to point of raising power with recirc flow.
- 3. Clean copy of DOP 0202-03, Reactor Recirculation Flow Control System Operation.
- 4. Clean copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One or Both Pumps.
S-N-a Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
- 3. The TSO has requested raising Unit 2 load to 900 MWe.
INITIATING CUE
- 1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of:
Maneuvering REMA DOP 0202-03, Reactor Recirculation Flow Control System Operation DGP 03-01, Power Changes During performance of this JPM, whenever the Examinee obtains a copy of DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps, hand him the supplied copy of it.
- 1.
Depresses one of the Panel 902-5 Recirc Master Manual Control raise speed pushbuttons. (Repeats this step to continue load pickup)
Depresses one of the following Panel 902-5 Recirc Master Manual Control raise speed pushbuttons 0.5 sec, but <
10 sec:
RAISE HIGH (0.06%)
RAISE MED (0.18%)
RAISE LOW (0.90%)
- 2.
Verifies expected response after each speed bump.
Verifies Recirc pump speeds, Core flow, Rx power and other plant parameters change as expected.
NOTE:
An automatic Trigger is setup to trip 2A Recirc pump when its speed reaches 82%.
BEGIN ALTERNATE PATH
- 3.
Announces 2A Recirc pump trip and enters DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps.
Announces 2A Recirc pump trip and enters DOA 0202-01, Recirculation (Recirc) Pump Trip - One Or Both Pumps.
S-N-a Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart.
Determines operating in the Nominal Feedwater Heating Region of Figure 1, Feedwater Heating Regions, and goes to the Subsequent Operator Actions (Nominal Feedwater Heating) Flow Chart.
CUE:
If the Examinee begins to do any of the following from the right side of the Hardcard, inform the Examinee that as the CRS I assigned another operator to perform it:
Monitor MSL & off gas rad monitors for increased activity.
Notify QNE to monitor core parameters.
Notify Chemistry to take samples per TS and ODCM if power change was 20% thermal in one hour.
- 5.
Closes 2A Recirc Pump discharge valve MO 2-0202-5A Rotates 2A PP DISCH VLV MO 2-202-5A CCW to the CLOSE position.
Verifies the valves CLOSE light lit and OPEN light out.
NOTE:
While waiting for the 5 minutes to elapse, the Examinee should continue with the rest of the steps.
- 6.
After 5 minutes, opens recirc pump discharge valve previously closed.
Rotates 2A PP DISCH VLV MO 2-202-5A CW to the OPEN position.
Verifies the valves OPEN light lit and CLOSE light out.
- 7.
Inserts CRAM Rods per DGP 03-04 to reduce Reactor power to 35 to 40%
CRAM rods inserting with expected power reduction.
S-N-a Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
After the insertion of several CRAM rods, as the CRS state another operator will take over inserting CRAM rods. Your task is complete.
- 8.
Repeats back another operator will take over inserting CRAM rods. My task is complete Repeats back another operator will take over inserting CRAM rods. My task is complete
- 9.
Informs Evaluator the Task is complete.
Informs Evaluator the Task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-a Page 8 of 9 Operators Name:
Job
Title:
Title:
ASD - CHANGE REACTOR POWER WITH RECIRC FLOW - (A)
JPM Number: S-N-a Revision Number: 00 Task Number and
Title:
202L024, Change Recirc pump speed on both Recirc pumps using ASD Tandem controls.
K/A Number and Importance: 202001 A4.01 3.7 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 36 minutes Actual Time Used:
minutes
References:
DOP 0202-03, rev 43 and DOA 0202-01, rev 42 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-a Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Unit 2 load was dropped 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago per TSO direction.
- 3. The TSO has requested raising Unit 2 load to 900 MWe.
INITIATING CUE
- 1. The Unit Supervisor has directed you to raise Unit 2 load to 900 MWe using Recirc flow in accordance with DOP 0202-03, REACTOR RECIRCULATION FLOW CONTROL SYSTEM OPERATION, using the preferred method.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-b Page 1 of 9 Exelon Nuclear Job Performance Measure RAPIDLY SECURE THE RWCU SYSTEM WITH THE REACTOR AT PRESSURE JPM Number: S-N-b Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-b Page 2 of 9 Revision Record (Summary)
Revision 01 Update for the 2014 ILT NRC exam.
S-N-b Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC where the reactor is at or close to normal operating pressure
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- None
- 3. Setup the following Triggers:
- trgset 1 "rtdmn02_drw.and. (rtwmn02.le. 0.05)" (Activates when RWCU pressure controller is in MAN and the pot is <0.05 demand)
- ior rtwmn02 (1) 0.0 (This overrides the demand to 0.0 since the lowest the demand goes is 0.02 which causes the RWCU system to isolate before the operator can isolate it)
DOCUMENT PREPARATION
S-N-b Page 4 of 9 INITIAL CONDITIONS
- 1.
A leak is present in the U2 RWCU system.
- 2.
RWCU Blowdown was NOT established.
- 3.
PCV bypass 2-1201-43 is CLOSED.
INITIATING CUE
- 1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
G.4.
Proceeds to step G.4 of the procedure Proceeds to the correct step for rapid securing NOTE:
Step G.4.a directs examinee to Hard Card.
NOTE:
Pump should trip in step 1 when demand is adjusted to zero. In Step 2 action to stop pump, the Examinee should verify that the pump is tripped OR stops the pump prior to closing valves in the following steps.
This is a critical action (verify or stop pump) to prevent forcing an automatic protective action that trips the pump when the system is isolated.
- 1.
Place PIC 2(3)-1290-2 PRESSURE CONTLR, in MANUAL.
AND Adjust demand to zero (0) to close the valve.
Rotates outer collar CW to MAN.
Rotates inner knob CCW to zero indication on horizontal indicator.
Annunciators 902-4 A-10, B-11, B-12 and C-12 alarm.
- 2.
Stop 2(3) A(B) RWCU RECIRC PP.
Verifies 2A pump tripped OR Places 2A pump control switch to STOP and verifies:
Blue ON light OFF Green OFF light ON
- 3.
Verify the following valves are closed:
MO 2(3)-1201-1, RX OUTLET ISOL.
Momentarily places MO 2-1201-1, RX OUTLET ISOL, control switch to CLOSE, and verifies its Red Close light ON.
MO 2-1201-1A, RX OUTLET BYP.
Verifies MO 2-1201-1A, RX OUTLET BYP, Green Close light ON.
S-N-b Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
MO 2-1201-2, INLET ISOL.
Momentarily places MO 2-1201-2, INLET ISOL, control switch to CLOSE, and verifies its Red Close light ON.
MO 2-1201-7, RX RETURN VLV.
Momentarily places MO 2-1201-7, RX RETURN VLV, control switch to CLOSE, and verifies its Red Close light ON.
Verifies MO 2-1201-8, RWCU PP BYP, Red Close light ON.
NOTE:
Steps 4 and 5 on Hardcard are N/A as blowdown was not established (per initial conditions).
Step 5 is not an If / Then so the Examinee may verify that the actions within the step are complete.
6 Close MO 2(3)-1201-9A(B),
A(B) RWCU PP DISCH Places MO 2-1201-9A, A RWCU PP DISCH, control switch to CLOSE and verifies Green Closed light ON NOTE:
Step 7 is N/A as PCV bypass is closed. (Per initial conditions).
- 8.
Notify Chemistry that RWCU has been isolated, (Noble Metals Monitor should be isolated)
Notifies Chemistry.
CUE:
Respond that Chemistry has been notified.
NOTE:
Step 9 action is to be taken by another operator.
9 Enter substitute values for computer points to ensure the heat balance is accurate.
Will address entering computer points.
CUE:
Inform the examinee that the another NSO will enter substitute values for step 9 of the Hard Card.
Report to the Unit Supervisor that RWCU has been rapidly secured.
Reports that RWCU has been secured.
S-N-b Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
CUE:
Acknowledge the report.
END JPM Stop Time:_________
S-N-b Page 8 of 9 Operators Name: ___________________________________
Job
Title:
Title:
Rapidly Secure the RWCU System with the Reactor at Pressure JPM Number: S-N-b Revision Number: 01 Task Number and
Title:
204L005, Secure the RWCU System with the reactor at pressure K/A Number and Importance: 20400A4.06 3.0/2.9 Suggested Testing Environment:
Simulator Actual Testing Environment:
Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
__10___minutes Actual Time Used: _______minutes
References:
DOP 1200-03, Rev 66 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
S-N-b Page 9 of 9 INITIAL CONDITIONS
- 1.
A leak is present in the U2 RWCU system.
- 2.
RWCU Blowdown was NOT established.
- 3.
PCV bypass 2-1201-43 is CLOSED.
INITIATING CUE
- 1. The Unit Supervisor has directed you to rapidly secure the RWCU system IAW DOP 1200-03, using the Hard Card.
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 02 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-c Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Modified for ILT 12-1 Cert Exam Revision 02 Modified for ILT 14-1 NRC Exam
S-N-c Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure that Both DEHC monitors are displaying the STATUS screen.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Clean copy of DGP 02-03, Reactor Scram.
S-N-c Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin an 85.0 Deg. F. / hr reactor cooldown to 350 Deg. F. utilizing the Hardcard.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the provided copy of DGP 02-03.
All the below actions can be performed on either of the Digital EHC control stations.
- 1.
Select <CONTROL>.
Utilizing the trackball controller, clicks on
<CONTROL>.
- 2.
Select <RX COOLDOWN>.
Utilizing the trackball controller, clicks on
<COOLDOWN>.
- 3.
Verify REACTOR COOLDOWN is OFF.
Observes the REACTOR COOLDOWN OFF select button is orange.
- 4.
Select STPT/RAMP.
Utilizing the trackball controller, clicks on the
<STPT/RAMP>.
- 5.
Enter desired target temperature setpoint.
Clicks in the Set Point box.
Utilizing the keyboard, enters 350.0.
- 6.
Enter desired cooldown rate in the Ramp box.
Clicks in the Ramp Rate box. Utilizing the keyboard, enters 85.0.
- 7.
Select <OK>...
Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up window.
S-N-c Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 8.
Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN.
Utilizing the trackball controller, clicks on <ON>.
Clicks <OK> on the Begin Reactor Cooldown pop up window.
Verifies Cooldown occurring using any of the following:
o Recirc temperature dropping o Reactor pressure dropping.
- 9.
On <CONTROL>
<PRESSURE CONTROL>
screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on
<PRESSURE CONTROL>.
- 10. On <CONTROL> <BPV JACK> screen, verify BPV Jack position setpoint is
-5.0%.
If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >.
Observes BPV Jack position setpoint is -5.0%.
- 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
S-N-c Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment END JPM Stop Time:_________
S-N-c Page 8 of 9 Operators Name:
Job
Title:
Title:
DEHC - ESTABLISH COOLDOWN WITH BYPASS VALVES Revision Number: 02 JPM Number: S-N-c Task Number and
Title:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 minutes Actual Time Used:
minutes
References:
DGP 02-03, rev 104 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-c Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin an 85.0 Deg. F. / hr reactor cooldown to 350 Deg. F. utilizing the Hardcard.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 08 Date: 1/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-d Page 2 of 11 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 12-1 Cert Exam.
Revision 08 Revised for ILT 14-1 NRC Exam.
S-N-d Page 3 of 11 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify NO LPCI pumps operating.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
S-N-d Page 4 of 11 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 0500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 5 of 11 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03.
- 1.
Place 2A LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 2.
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
RED light illuminated.
- 3.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
RED light illuminated.
CUE:
2-1501-13A is not required for 2B LPCI pump.
NOTE:
The following valves may be verified in any order
- 4.
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 5.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
- 6.
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
- 7.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
S-N-d Page 6 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 9.
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
GREEN lights illuminated.
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
Instructs EO to complete step G.12.c.(5).(a).
Instructs EO to complete step G.12.c.(5).(b).
Instructs EO to complete step G.12.c.(5).(c).
Instructs EO to complete step G.12.c.(5).(d).
- 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6).
CUE:
PI 2-1501-47A indicates 15.5 psig.
- 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
S-N-d Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Instructs EO to close 2-1501-47A per step G.12.c.(8).
CUE:
2-1501-47A-R is Closed.
- 17. Open PP SUCT VLV MO 2-1501-5A.
GREEN light illuminated.
- 18. Place 2A LPCI PP control switch in AUTO.
Depresses and places 2A LPCI PP c/s to center (AUTO) position.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
CUE:
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
BEGIN ALTERNATE PATH
- 20. Place 2C LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 21. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed.
RED light illuminated.
- 22. Verify MIN FLOW VLV 2-1501-13B closed if not needed.
RED light illuminated.
CUE:
2-1501-13B is not required for 2D LPCI pump.
S-N-d Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 23. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 24. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
GREEN lights illuminated.
- 26. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 27. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
GREEN lights illuminated.
Instructs EO to complete step G.12.e.(5).(a).
Instructs EO to complete step G.12.e.(5).(b).
Instructs EO to complete step G.12.e.(5).(c).
Instructs EO to complete step G.12.e.(5).(d).
S-N-d Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 33. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47A reading per step G.12.e.(6).
CUE:
Pressure is 10 psig..
- 34. Recognizes reading is less than 15 psig.
Determines reading is LESS than 15 psig.
Instructs EO to close 2-1501-47C per step G.12.e.(8).
Directs EO to perform step G.12.e.(10)(a)
Directs EO to perform step G.12.e.(10)(b)
Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-d Page 10 of 11 Operators Name:
Job
Title:
Title:
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 08 JPM Number: S-N-d Task Number and
Title:
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000A1.04 3.6/3.6 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 38 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-d Page 11 of 11 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 0500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)
JPM Number: S-N-e Revision Number: 06 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-e Page 2 of 8 Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
Revision 06 Revised for 2014 NRC exam.
S-N-e Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
- 2. Ensure Torus water level is <30 feet.
- 3. Insert following Malfunctions and/or Remotes.
IMF CIGP2I (Spurious Group II Isolation)
IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
- 5. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
- 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
S-N-e Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, Attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide examinee the marked up copy of DEOP 0500-04.
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
- 1.
Verify SBGT is operating and flow is ~ 4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading
~4000 scfm.
- 2.
Verify Reactor Mode switch NOT in RUN.
Verifies Reactor Mode switch NOT in RUN.
- 3.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Momentarily places Bypass switch to Torus Position.
NOTE:
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
- 4.
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.
NOTE:
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
BEGIN ALTERNATE PATH
- 5.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to DRYWELL.
Momentarily places Vent Isol Signal Bypass switch to Drywell position.
CUE:
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
- 6.
Open AO 2-1601-62, DW 2-INCH Vent.
Red Open light illuminated.
S-N-e Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 7.
Open AO 2-1601-63, VENT TO SBGT.
Red Open light illuminated.
- 8.
Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.
Containment pressure stable or decreasing.
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-e Page 7 of 8 Operators Name:
Job
Title:
Title:
CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET - (A)
Revision Number: 06 JPM Number: S-N-e Task Number and
Title:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DEOP 0500-04, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-e Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE JPM Number: S-N-f Revision Number: 02 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-f Page 2 of 9 Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for ILT 12-1 Cert Exam Revision 02 Revised for ILT 14-1 NRC Exam
S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- irf M63 open (Prevents TR-22 to Bus 23 breaker from closing).
- 3. Setup the following Triggers:
- None.
- 4. Ensure ONLY 2 RFPs operating.
- 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
- 1.
Marked up copy of DOP 6500-01, Transfer of 4160 Volt Bus Power Supply.
S-N-f Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOP 6500-01.
This task has two parts, which can be performed in any order.
CUE:
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
- 1.
Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 2.
Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 3.
Position TR-22 to Bus 21 breaker control switch to CLOSE.
RED light illuminated.
- 4.
Verify:
SYNCHRONIZING meter at 12 oclock position.
TR-22 to Bus 21 breaker indicates CLOSED.
Annunciator 902-8 D-1 in alarm.
Meter NOT rotating.
RED light illuminated.
Annunciator 902-8 D-1 illuminated.
S-N-f Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Position TR-21 to Bus 21 breaker control switch to TRIP.
GREEN light illuminated.
- 6.
Verify:
TR-21 to Bus 21 breaker indicates OPEN.
Annunciator 902-8 D-1 clears.
GREEN light illuminated.
Annunciator 902-8 D-1 extinguished.
- 7.
Position TR-22 to Bus 21 synchroscope selector switch to OFF.
Switch in OFF position.
- 8.
Verify Bus 21 AMMETER and VOLTMETER indications are normal.
Verifies Bus 21 amps and volts are normal.
NOTE:
Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
- 9.
Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
Switch in ON position.
- 10. Verify:
INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
SYNCHRONIZING meter at 12 oclock position and NOT rotating.
SYNCHRONIZING meter lights NOT glowing.
Voltages approximately equal.
Meter NOT rotating.
White lights extinguished.
- 11. Position TR-22 to Bus 23 breaker control switch to CLOSE.
Breaker does NOT close.
S-N-f Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Candidate should observe that the TR-22 to Bus 23 breaker did not close.
- 12. IMMEDIATELY positions TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.
GREEN light illuminated.
NOTE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
If the TR-22 to Bus 23 breaker is the first breaker that was operated:
CUE:
Acknowledge report of the TR-22 to bus 23 breaker failed to close. Inform the candidate another operator will address Bus 23 and to continue with the transfer of Aux power on Bus 21.
- 13. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-f Page 8 of 9 Operators Name:
Job
Title:
Title:
AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH FAILURE OF BREAKER TO CLOSE Revision Number: 02 JPM Number: S-N-f Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 24 minutes Actual Time Used:
minutes
References:
DOP 6500-01, rev 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-f Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The EO on his round reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure RBM - CLEAR RBM MALFUNCTION - (A)
JPM Number: S-N-g Revision Number: 01 Date: 01/15 Developed By:
Instructor Date Validated By:
SME or Instructor Date Review By:
Operations Representative Date Approved By:
Training Department Date
S-N-g Page 2 of 10 Revision Record (Summary)
Revision 00 New JPM for 2014 LORT NRC Exam.
Revision 01 Revised JPM for 14-1 ILT NRC Exam.
S-N-g Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with:
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- FCL 90 - 96%
- A control rod available to withdraw which meets the following:
In-sequence.
Partially withdrawn.
Non-edge.
- 2. For development of this JPM, IC 152 with control rod sequence 2S.0.0 1646 (step 13 withdrawn) was used with the following:
- Insert Control Rod D-04 from position 20 to 14.
- Recirc flow at ~58 Mlbm/hr. (Can be adjusted higher if necessary)
- 3. Setup the Malfunctions, Remotes, and/or Triggers by running CAEP file: S-N-g.cae DOCUMENT PREPARATION Clean copy of DOA 0700-03, ROD OUT BLOCKS.
CAEP file:
- S-N-g.cae
- For 14-1 ILT NRC Exam
- Written by MP
- Rev 01
- Date 01/15
- INITIAL CONDITIONS
- None
- EVENT TRIGGERS
S-N-g Page 4 of 10
- Event Trigger 1 Activates when control rod D-04 is settling to position 16.
- Overrides RBM 7 902-37 NO BALANCE light ON.
trgset 1 "rdzactls(28).gt. 44.0" ior nidrmod16 (1) off ior nidrmod15 (1) standby ior nilbnbal1 (1) true
- Event Trigger 2 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 OPERATE override.
trgset 2 "nidrmod1_drw(4)"l2 trg 2 "dor nidrmod16"l2
- Event Trigger 3 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 STANDBY override.
trgset 3 "nidrmod1_drw(4)"l2 trg 3 "dor nidrmod15"l2
- Event Trigger 4 Activates when RBM 7 is placed to ZERO NO. 2.
- Deletes RBM 7 NO BALANCE light override.
trgset 4 "nidrmod1_drw(4)"l2 trg 4 "dor nilbnbal1"l2
- END
S-N-g Page 5 of 10 INITIAL CONDITIONS
- 1. You are the NSO assigned to move control rods.
- 2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.
INITIATING CUE
- 1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to position 20 using single notching IAW DGP 03-01, Power Changes, step G.2.w.
- 2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment Note:
Although not a procedure step a second verifier is required. Second Verifier Duties:
Proper rod selected Insert and Withdraw limits understood.
Check off each control rod movement on the CRD Checklist.
- 1.
Request a second verifier VERIFIES second verifier available.
Cue:
Inform examinee that you will perform duties of second verifier.
- 2.
Selects Control Rod D-04.
Depresses Select Pushbutton for Control Rod D-04. Observes Full Core Display and Apron Select lights for control rod D-04 lit.
NOTE:
An automatic Trigger inserts a failure for RBM 7 as control rod D-04 settles to position 16.
- 3.
Single notches out Control Rod D-04 from position 14 to position
- 16.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 16.
- 4.
Observe annunciator 902-5 A-7, RBM HI/INOP is received.
Announces annunciator 902-5 A-7, RBM HI/INOP is received.
ALTERNATE PATH BEGINS
- 5.
Depress the appropriate RBM PUSH TO SET-UP Push Buttons.
Depresses the RBM PUSH TO SET-UP Push Button for RBM 7.
S-N-g Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Verify only one Control Rod is selected for movement, and that it is in the proper sequence (the NO ROD SELECTED Light on Panel 902(3)-37 should be extinguished).
Verifies only one rod is selected on the rod select matrix and the NO ROD SELECTED light for RBM 7 at panel 902-37 is extinguished.
- 7.
Check that there are NO unusually high LPRM indications, and that there are the proper number of assigned LPRMs for each of the RBM Channels.
Verifies that there are no high LPRM indications and RBM 7 has the proper number of LPRMs assigned.
CUE:
When the examinee begins to use the Plant Process computer to obtain printouts, inform the examinee Another NSO has printed the Control Rod Printout and a LPRM Printout, the QNE has reviewed the printouts and has no concerns.
- 8.
Obtain a Control Rod Printout and a LPRM Printout from the process computer (Reference DOP 9950-03 AND DOP 9950-07) to verify proper Control Rod Position and LPRM flux profile.
Uses a Plant Process Computer terminal to print Control Rod and LPRM printouts.
- 9.
Place the RBM 7 Mode Selector Switch to the ZERO 2 position and then move it to the STANDBY Position.
Places the RBM 7 Mode Selector Switch to the ZERO 2 position AND then to STANDBY.
NOTE:
This will cause the card to perform a nulling sequence, the RBM 7 INOP light will go on and the NO BALANCE Light for RBM 7 on Panel 902-37 will go out.
- 10.
Place the RBM Mode Selector Switch to the OPERATE Position.
Places the RBM 7 Mode Selector Switch to OPERATE
S-N-g Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
The RBM 7 INOP light on Panel 902-37 will go out.
ALTERNATE PATH ENDS
- 11.
Single notches out Control Rod D-04 from position 16 to position
- 18.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 18.
- 12.
Single notches out Control Rod D-04 from position 18 to position
- 20.
Momentarily places Rod Movement Control switch to Rod Out.
o Verifies Control Rod D-04 latches at position 20.
NOTE:
At this point the JPM is complete
- 13.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-g Page 9 of 10 Operators Name:
Job
Title:
Title:
RBM - Clear RBM Malfunction JPM Number: S-0700-16 Revision Number: 00 Task Number and
Title:
201L016, Respond to a rod out block.
K/A Number and Importance: 215002.A2.05 3.2 / 3.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 33 minutes Actual Time Used:
minutes
References:
DOA 0700-03, rev 12; DAN 902-5 A-7, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-g Page 10 of 10 INITIAL CONDITIONS
- 1. You are the NSO assigned to move control rods.
- 2. The QNE requests withdrawing control rod D-04 from position 14 to 20 to raise FCL using single notch.
INITIATING CUE
- 1. The Unit Supervisor has directed you to withdraw control rod D-04 from position 14 to 20 using single notch IAW DGP 03-01, Step G.2.w.
- 2. Use the Special Maneuver Rod Move Sheets provided by the QNE.
- 3. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure CREV - SECURE A AHU AND STARTUP B AHU AND RCU JPM Number: S-N-h Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-h Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised JPM ILT 14-1 NRC Exam.
S-N-h Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure A AHU operating.
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Clean copy of DOP 5750-05, Control Room Ventilation and Air Conditioning System.
S-N-h Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
- 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
- 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
- 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
- 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
- 7. RCU Cooling Water has been lined up.
- 8. Another NSO will perform all log entries.
- 9. An EO is stationed in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05, step G.1.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-h Page 5 of 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 6 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOP 5750-05.
NOTE:
Train B AHU will automatically start when Train A AHU is secured.
- 1.
Secure Train A AHU using control switch, 2/3A TRAIN CRM AIR HANDLING UNIT.
BLUE ON light OFF and GREEN OFF light lit.
- 2.
Secure Train A Return Fan using control switch, CRM RETURN FAN.
BLUE ON light OFF and GREEN OFF light lit.
- 3.
Place Train B AHU control switch, CRM AIR HANDLING UNIT B, in Auto After Start.
Control Switch RED target visible.
- 4.
Monitor PI 2/3 5740 36, CRM TO E TURB DP, to assure a positive pressure is being maintained in the Control Room.
Observes a positive pressure is being maintained.
- 5.
Monitors the RCU compressor suction pressure.
Directs the EO, in the field, to report the RCU compressor suction pressure.
CUE:
RCU suction pressure is 75 psig.
- 6.
Monitors the RCU compressor discharge pressure.
Directs the EO, in the field, to report the RCU compressor discharge pressure.
S-N-h Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
RCU discharge pressure is 230 psig.
- 7.
Monitors the RCU compressor oil pressure, (40 to 60 psig above suction pressure).
Directs the EO, in the field, to report the RCU compressor oil pressure.
CUE:
RCU suction pressure is 125 psig.
- 8.
States intention to monitor the RCU compressor oil level AFTER three hours of operation.
Communicates need to monitor oil pressure AFTER three hours of operation.
CUE:
Acknowledge report.
- 9.
Informs Unit Supervisor that task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-h Page 8 of 9 Operators Name:
Job
Title:
Title:
CREV - SECURE A AHU AND STARTUP B AHU AND RCU Revision Number: 01 JPM Number: S-N-h Task Number and
Title:
288LN003-14, Discuss the major steps involved in performing Control Room HVAC AFU and RCU test.
K/A Number and Importance: 290003.A4.01 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 26 minutes Actual Time Used:
minutes
References:
DOP 5750-05, rev 63 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-h Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Control Room Vent A AHU needs to be removed from service for maintenance.
- 3. There has NOT been any painting done anywhere in the plant within the last 14 days.
- 4. There has NOT been any propane-powered equipment operated anywhere in the plant within the last 14 days.
- 5. The U2/3 CONTROL ROOM REFRIG CONDENSING UNIT crankcase heaters have been operating for the past 7 days.
- 6. The CRM HVAC REFRIG COMPR B crankcase heater has been operating for the past 7 days.
- 7. RCU Cooling Water has been lined up.
- 8. Another NSO will perform all log entries.
- 9. An EO is stationed in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to secure the A AHU and startup the B AHU and RCU per DOP 5750-05, step G.1.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-i Revision Number: 03 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-i Page 2 of 8 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for ILT 14-1 NRC exam.
S-N-i Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION A clean copy of DOA 6600-01, Diesel Generator Failure.
S-N-i Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DOA 6600-01, Diesel Generator Failure.
- 1.
Proceeds to the 2/3 Diesel Generator Room.
Proceeds to the 2/3 Diesel Generator Room.
- 2.
Examinee checks the level in the D/G Fuel Oil Day Tank.
Observes day tank sightglass and determines day tank needs filling.
CUE:
Point to the lower third area on the local sightglass and state: the level is here.
NOTE:
Normal level is 30 - 38".
- 3.
Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3.
Verifies power available, by local indicating lights illuminated.
CUE:
The GREEN LIGHT is illuminated.
- 4.
Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.
Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position.
CUE:
The pump is running.
You have held the switch for approximately 5 minutes.
S-N-i Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Checks the level in the fuel oil day tank.
OBSERVES sight glass and/or REQUESTS annunciator 902-8 G-4 status.
CUE:
Point to the local sightglass at the 35 inch mark on the measuring stick and state: the level is here; OR, if requested the NSO says Control Room alarm 902-8 G-4 has reset.
- 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-i Page 7 of 8 Operators Name:
Job
Title:
Title:
EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 03 JPM Number: S-N-i Task Number and
Title:
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
K/A Number and Importance: 264000.K1.05 3.2/3.3 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 16 minutes Actual Time Used:
minutes
References:
DOA 6600-01, rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-i Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, Attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 01 Date: 12/14 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-j Page 2 of 9 Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
Revision 01 New JPM developed for ILT 14-1 (2015-301) NRC Exam.
S-N-j Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this is an in-plant JPM.
DOCUMENT PREPARATION
- 1.
Clean copy of DSSP 0100-CR, Attachment I.
S-N-j Page 4 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j Page 5 of 9 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of DSSP 0100-CR, Attachment I.
CB-1 key is required for entry into the Iso Cond makeup pump building.
The candidate may choose to start either engine.
- 1.
Place the REMOTE-OFF-RUN toggle switch for either engine in RUN.
Switch at panel 2223-126A or B, placed in RUN.
CUE:
The component is in the condition you described.
- 2.
Verify engine starts and comes up to stable speed.
Engine RPM indicator on panel 2223-126A or B is checked.
CUE:
The engine has started and is running at 1802 RPM.
NOTE:
The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).
- 3.
Monitor the following engine parameters to ensure limits are NOT exceeded:
- Oil Pressure
- Water Temperature
- RPM Checks the parameters on the LCD display.
BEGIN ALTERNATE PATH CUE:
Provide the following engine parameter values:
- Oil pressure: 55 psi
- Water Temperature 215oF
- RPM 1802 rpm
- 4.
Recognizes that water temperature has exceeded the high limit.
> 205oF.
S-N-j Page 6 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 5.
Stops running engine by placing the REMOTE-OFF-RUN toggle switch to OFF.
Switch at panel 2223-126A or B, placed in OFF.
CUE:
The component is in the condition you described.
- 6.
Starts the opposite IC Makeup Pump, than was originally started.
Switch at panel 2223-126A or B, placed in RUN.
CUE:
The component is in the condition you described.
- 7.
Verify engine starts and comes up to stable speed.
Engine RPM indicator on panel 2223-126A or B is checked.
CUE:
The engine has started and is running.
- 8.
Monitor the following engine parameters to ensure limits are NOT exceeded:
- Oil Pressure
- Water Temperature
- RPM Checks the parameters on the LCD display.
CUE:
Provide the following engine parameter values:
- Oil pressure: 59 psi
- Water Temperature 185oF
- RPM 1799 rpm
- 9.
Notifies SM/U2 US that an Iso Cond Makeup Pump is in operation.
Notifies appropriate individual.
S-N-j Page 7 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
Inform the candidate that another Operator will perform monitoring duties.
- 10. Reports to the SM/U2 US that the task is complete.
SM/U2 US notified.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-j Page 8 of 9 Operators Name:
Job
Title:
Title:
ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 01 JPM Number: S-N-j Task Number and
Title:
207N020, Start Isolation Condenser Makeup Pump.
K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 14 minutes Actual Time Used:
minutes
References:
DSSP 0100-CR, rev 49 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-j Page 9 of 9 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Smoke in the Control Room has led to a Control Room Evacuation.
- 3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
- 4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.
INITIATING CUE
- 1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-k Revision Number: 11 Date: 01/15 Developed By:
Instructor Date Approved By:
Facility Representative Date
S-N-k Page 2 of 8 Revision Record (Summary)
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
Revision 11 Revised for ILT 14-1 NRC Exam
S-N-k Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-k Page 4 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the supplied copy of DEOP 0500-03.
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is required only to identify which type of key is required to open the valve.
- 1.
Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.
Proceeds to the U2 SBLC area.
- 2.
Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve hand wheel full clockwise.
CUE:
The component is in the condition you have described.
- 3.
Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV.
Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.
CUE:
The component is in the condition you have described.
- 4.
Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV.
Unlocks lock and removes chain, then rotates valve hand wheel full counter-clockwise...
CUE:
The component is in the condition you have described.
- 5.
Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV.
Rotates valve hand wheel full counter-clockwise.
- 6.
Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV.
Rotates valve hand wheel full counter-clockwise.
S-N-k Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment CUE:
The component is in the condition you have described.
- 7.
Start both SBLC pumps from the main Control Room.
Contacts the Unit 2 Control Room Operator to start the SBLC pumps.
CUE:
I have started both Unit 2 Standby Liquid Control pumps.
- 8.
Throttle 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank.
Opens / closes valve to maintain test tank level.
CUE:
The test tank level is now stabilized (as much going in as is going out).
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-k Page 7 of 8 Operators Name:
Job
Title:
Title:
LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 11 JPM Number: S-N-k Task Number and
Title:
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In Plant Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 17 minutes Actual Time Used:
minutes
References:
DEOP 0500-03, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
S-N-k Page 8 of 8 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.