U. S. Nuclear Regulatory Commission Report for the Audit of Susquehanna Nuclear, LLCs Flood Hazard Reevaluation Report Submittals Relating to the Near-Term Task Force Recommendation 2.1 - Flooding for Susquehanna Units 1 and 2 (Tac. MF6037
ML15281A156
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/21/2015
From: Tekia Govan
Japan Lessons-Learned Division
To: Franke J
Susquehanna
Govan T, 415-6197, O-13C05
References
TAC MF6037, TAC MF6038
Download: ML15281A156 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 October 21, 2015

SUBJECT:

NUCLEAR REGULATORY COMMISSION REPORT FOR THE AUDIT OF SUSQUEHANNA NUCLEAR, LLC'S FLOOD HAZARD REEVALUATION REPORT SUBMITTALS RELATING TO THE NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR SUSQUEHANNA UNITS 1AND2 (TAC NOS. MF6037 AND MF6038)

Dear Mr. Franke:

By letter dated June 4, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15153A163), the U.S. Nuclear Regulatory Commission (NRC) informed you of the staff's plan to conduct a regulatory audit of Susquehanna Nuclear, LLC's (the licensee) Flood Hazard Reevaluation Report (FHRR) submittals related to the Near-Term Task Force Recommendation 2.1-Flooding for Susquehanna Steam Electric Station, Units 1 and 2. The audit was intended to support the NRC staff review of the licensee's FHRR and the subsequent issuance of a staff assessment.

The audit was conducted on September 9, 2015, and was performed consistent with NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008 (ADAMS Accession No. ML082900195). Therefore, the purpose of this letter is to provide you with the final audit report which summarizes and documents the NRC's regulatory audit of the licensee's FHRR submittal.

If you have any questions, please contact me at (301) 415-6197 or by e-mail at Tekia. Govan@nrc.gov.

Docket Nos. 50-387 and 50-388

Enclosure:

Audit Report cc w/encl: Distribution via Listserv Sincerely, JJC\\o-(~a-------_

Tekia V. Govan, Project Manager Office of Nuclear Reactor Regulation Japan Lessons-Learned Division Hazards Management Branch

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 NUCLEAR REGULA TORY COMMISSION AUDIT REPORT FOR THE AUDIT OF SUSQUEHANNA NUCLEAR, LLC'S FLOOD HAZARD REEVALUATION REPORT SUBMITTALS RELATING TO THE NEAR-TERM TASK FORCE RECOMMENDATION 2.1-FLOODING FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 BACKGROUND AND AUDIT BASIS By letter dated March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR),

Section 50.54(f) "Conditions of license" (hereafter referred to as the "50.54(f) letter). The request was issued in connection with implementing lessons-learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. Recommendation 2.1 in that document recommended that the NRC staff issue orders to all licensees to reevaluate seismic and flooding for their sites against current NRC requirements and guidance. Subsequent Staff Requirements Memoranda associated with Commission Papers SECY 11-0124 and SECY-11-0137, instructed the NRC staff to issue requests for information to licensees pursuant to 10 CFR 50.54(f).

By letter dated March 3, 2015, Susquehanna Nuclear, LLC (Susquehanna, the licensee) submitted its Flood Hazard Reevaluation Reports (FHRRs) for Susquehanna Steam Electric Station, Units 1 and 2 (ADAMS Accession No. ML15063A319). The NRC is in the process of reviewing the aforementioned submittal and has completed a regulatory audit of Susquehanna to better understand the development of the submittal, identify any similarities/differences with past work completed and ultimately aid in its review of licensees' FHRR. This audit summary is being completed in accordance with the guidance set forth in NRC Office of Nuclear Reactor Regulation, Office Instruction LIC-111, "Regulatory Audits," dated December 29, 2008, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082900195).

AUDIT LOCATION AND DATES The audit was completed by document review via a webinar session in conjunction with the use of Susquehanna's established electronic reading room and teleconference on September 9, 2015, from 1 :30pm to 2:30pm.

Enclosure AUDIT TEAM Title Team Member Organization Team Leader, NRR/JLD Tekia Govan NRC Deputy Division Director, NRO/DSEA Andy Campbell NRC Technical Monitor Laura Quinn-Willingham NRC Technical Lead Kenneth See NRC Technical Team Lead Kenneth Erwin NRC A list of the Susquehanna participants can be found in Attachment 2.

DOCUMENTS AUDITED of this report contains a list which details the documents that were reviewed by the NRC staff, in part or in whole, as part of this audit. The documents were located in an electronic reading room during the NRC staff's review. The documents, or portions thereof, that were used by the staff as part of the technical analysis and/or as reference in the completion of the staff assessment, were submitted by the licensee and docketed for completeness of information, as necessary. These documents are identified in Table 1.

AUDIT ACTIVITIES In general, the audit activities consisted mainly of the following actions:

Review background information on site topography and geographical characteristics of the watershed.

Review site physical features and plant layout.

Understand the selection of important assumptions and parameters that would be the basis for evaluating the individual flood causing mechanisms described in the 50.54(f) letter.

Review model input/output files to computer analyses such as Delft-3D and FL0-2D to have an understanding of how modeling assumptions were programmed and executed.

Table 1 summarizes specific technical topics (and resolution) of important items that were discussed and clarified during the audit. The items discussed in Table 1 may be referenced/mentioned in the staff assessment in more detail.

Table 1: Technical Topics of Discussion Info Need Information Need Description Post-Audit Status No.

1 The use of Current Licensing Basis (CLB)

Licensee will provide on the docket and Current Design-Basis (COB) appears to confirmation that use of CLB vs COB be interchangeable in the FHRR. The NRC interchangeably in the FHRR is intended staff request the licensee to clarify its use of to mean COB throughout.

the terms.

2 The NRC staff requests that the licensee Licensee will provide on the docket the discusses why a COB was not provided for COB values and supporting information the Local Intense Precipitation (LIP).

for LIP, as this information was not provided in the FHRR.

3 The NRC staff requests that the licensee Licensee will provide on the docket COB discusses why a COB was not provided for values and supporting information for the the Cooling Tower Basin.

Cooling Tower Basin, as this information was not provided in the FHRR.

4 In Section 3.3.8.1 of the FHRR, the licensee Licensee will provide on the docket discusses failure modes for the Cooling discussion to clarify the information Tower Basins, but does not discuss how provided in Section 3.3.8.1 in the they were developed. Licensee asked to FHRR. Specifically, the licensee will please provide this information on the discuss how the failure modes for the docket.

Cooling Tower Basin were developed using the 3 historical cases, provided in the calculation package, to support their conclusion.

5 Provide on the docket the following Licensee will provide on the docket the schematics from RIZZO Calculation following Figures 2-2, 2-3, 2-5, and 7-7.

12-4834 F-06, Revision 0.

On September 24, 2015, Susquehanna provided on the docket the response to all of the above information needs (ADAMS Accession No. ML15267A600). After review of this information, the NRC staff determined that a necessary COB value was omitted from the response for information need number 2. The licensee was informed of this omission of information on September 29, 2015. On October 2, 2015, Susquehanna provided the omitted information and the NRC staff concluded the audit (ADAMS Accession No. ML15288A563).

EXIT MEETING/BRIEFING On October 2, 2015, the NRC staff closed out the discussion of the technical topics described above. There are no outstanding information needs remaining as a result of this audit.

ATTACHMENT 1 FHRR Reference Lists 12-4834 F-01 Local Intense Precipitation Flooding - Revision 0 12-4834 F-02 Wind Waves Coincident with the LIP - Revision 0 12-4834 F-03 Screening out of River Flooding - Revision 0 12-4834 F-04 Screening out of Dam Failure Flooding - Revision 0 12-4834 F-05 Screening out of Combined Effects Flooding - Revision 0 12-4834 F-06 Cooling Tower Rupture Analysis - Revision 0

Name

1. Michael Crowthers
2. Jemie Dababneh ATTACHMENT 2 List of Susquehanna Audit Participants Organization Talen Energy Rizzo Associates

If you have any questions, please contact me at (301) 415-6197 or by e-mail at Tekia.Govan@nrc.gov.

Sincerely, IRA/

Tekia V. Govan, Project Manager Office of Nuclear Reactor Regulation Japan Lessons-Learned Division Hazards Management Branch Docket Nos. 50-387 and 50-388

Enclosure:

Audit Report cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC MShams, NRR CCook, NRO JLD R/F ARivera, NRO KSee, NRO RidsNRRJLD Resource JBowen, NRR ACampbell, NRO MFranovich, NRR KErwin, NRO RidsNrrDorl1-2 Resource LQuinn-Willingham, NRO RidsNrrPMSusquehanna Resource ADAMS Accession No.: ML15281A156 OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME TGovan Slent MShams TGovan DATE 10/8/2015 10/8/2015 10/21/2015 10/21/2015 OFFICAL RECORD COPY