October 28, 2015 MEMORANDUM TO:
Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM:
Lawrence E. Kokajko, Director
/RA/
Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE 1.13 This memorandum documents the U.S. Nuclear Regulatory Commission (NRC) periodic review of Regulatory Guide (RG) 1.13, Spent Fuel Storage Facility Design Basis, published in March 2007. This RG endorses the American National Standards Institute/American Nuclear Society standard N210-1976/ANS-57.2-1983. As discussed in Management Directive 6.6, Regulatory Guides, the NRC staff reviews RGs approximately every five years to ensure that the RGs continue to provide useful guidance. The documentation of the Office of Nuclear Reactor Regulation (NRR) staff review is enclosed.
Based on the results of the periodic review, the NRR staff concludes that no changes to RG 1.13 are warranted at this time.
Enclosure:
Regulatory Guide Periodic Review CONTACT: Kent Wood, NRR/DSS (301) 415-4120 Leslie Perkins, NRR/DPR (301) 415-2375
ML15274A351; *concurred via e-mail NRR-106 OFFICE NRR/DPR/PLPB NRR/DPR/PLPB* NRR/DSS/SRXB NRR/DPR/PLPB NRR/DPR NRR/DPR NAME LPerkins DHarrison CJackson AMendiola MGavrilas LKokajko DATE 10/14/2015 10/09/2015 10/22/2015 10/26/2015 10/28/2015 10/28/2015
ENCLOSURE Regulatory Guide Periodic Review Regulatory Guide Number:
1.13, Revision 2
Title:
Spent Fuel Storage Facility Design Basis Office/division/branch:
NRR/DSS/SNPB Technical Lead:
Kent Wood Staff Action Decided:
Reviewed with no Issues identified
- 1. What are the known technical or regulatory issues with the current version of the Regulatory Guide (RG)?
Regulatory Guide 1.13, Spent Fuel Storage Facility Design Basis, published in March 2007, endorses the American National Standards Institute/American Nuclear Society standard N210-1976/ANS-57.2-1983. In the staffs initial periodic review of RG 1.13 performed in October 2013, the staff identified a potential need to include guidance for performance of criticality reviews in order to meet General Design Criteria (GDC) 61 and GDC 62 with exceptions. However, the staff is currently reviewing Nuclear Energy Institute (NEI) 12-16, Guidance for Performing Criticality Analyses of Fuel Storage at Light-Water Reactor Power Plants. The staff plans to complete review of NEI 12-16 by September 2016. If NEI 12-16 is found acceptable, the staff plans to develop a new RG to endorse NEI 12-16. If the staff develops a new RG, the initial draft will be ready by July 2017.
- 2. What is the impact on internal and external stakeholders of not updating the RG for the known issues, in terms of anticipated numbers of licensing and inspection activities over the next several years?
There are currently no known or anticipated licensing or inspection activities from internal or external stakeholders that will be impacted by not updating RG 1.13 at this time.
- 3. What is an estimate of the level of effort needed to address identified issues in terms of full-time equivalent and contractor resources?
Not applicable
- 4. Based on the answers to the questions above, what is the staff action for this guide (Reviewed with no issues identified, Reviewed with issues identified for future consideration, Revise, or Withdraw)?
Reviewed with no issues identified
- 5. Provide a conceptual plan and timeframe to address the issues identified during the review.
Not Applicable NOTE: This review was conducted in September 2015 and reflects the staffs plans as of that date. These plans are tentative and subject to change.