UNITE D STATE S N UCLEAR REGULATORY C OMMI SS I ON WASHINGTON, DC 20555 - 0001 October 1, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Dr. Thomas J. Hirons Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of ENTERGY NUCLEAR OPERATIONS, INC.

(Palisades Nuclear Plant)

Docket Nos. 50-255-LA-2

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards July 14, 2015, Initial Scheduling Order (ISO), the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that the hearing file has been supplemented for this proceeding. An index containing the Agencywide Documents Access and Management System (ADAMS) accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.

On or about October 10, 2015, the documents identified in the hearing file may be accessed through ADAMS or through the Electronic Hearing Docket (EHD), which may be accessed at http://adams.nrc.gov/ehd/. The hearing file will be contained in the Staff Discovery Materials tab of the EHD, in a sub-folder entitled, Palisades Hearing File, Update 2 in the Palisades_50-255-LA-2" folder.

In addition, pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Jennivine K. Rankin, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by September 17, 2015.

Finally, the NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b), 10 C.F.R. § 2.1203, and the ISO in this proceeding. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

Judge Spritzer October 1, 2015 Judge Arnold Judge Hirons Sincerely,

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff

Enclosures:

Attachment 1 - Palisades Hearing File Index - Update 2 Affidavit of Jennivine K. Rankin cc w/Encls.: Service List

Attachment 1 - Palisades Hearing File Index Update 2 - October 1, 2015 Document ID# Location Title Date 03-0001 ML15247A369 5/31/1987 NUREG/CR-4760 ORNL-6187, Test of 6-in.-Thick Pressure Vessels. Series 3: Intermediate Test, Vessel V-8A - Tearing Behavior of Low-Upper-Shelf Material

September 28, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

AFFIDAVIT OF JENNIVINE K. RANKIN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Jennivine K. Rankin, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I currently serve as a project manager for the Palisades Nuclear Plant. Among other things, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the license amendment request at issue in this proceeding.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b)-(c) and 2.1203 and the Boards July 14, 2015 Initial Scheduling Order in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of September 17, 2015.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Jennivine K. Rankin Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415-1530 Email: Jennivine.Rankin@nrc.gov Executed in Rockville, Maryland this 28th day of September 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-255-LA-2

)

(Palisades Nuclear Plant) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305, I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Palisades Hearing File, including: Attachment 1 - Palisades Hearing File Index - Update 2 and Affidavit of Jennivine K. Rankin, dated September 28, 2015, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 1st day of October, 2015.

/Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-4113 E-mail: anita.ghosh@nrc.gov Date of signature: October 1, 2015