MONTHYEARML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mother'S for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21124A0612021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML21054A3112021-02-23023 February 2021 NRR E-mail Capture - Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements ML21012A4432021-01-12012 January 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML20328A3002020-11-23023 November 2020 Email from Cgnp to the NRC - Comment Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Dcdep Public Meeting - November 24, 2020 ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20239A9492020-08-26026 August 2020 (External Sender) E-Mail Comment by D. Lochbaum Regarding Diablo Canyon Unit 1 AFW System Piping ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue ML20234A2422020-08-20020 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20233A3222020-08-18018 August 2020 Comment (4) e-mail from D. Lochbaum Regarding Diablo Canyon Exigent LAR ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G 2023-08-18
[Table view] |
Text
DiabloCanyonNPEm Resource From: Grebel, Terence [TLG1@pge.com]
Sent: Friday, September 11, 2015 1:34 PM To: Wentzel, Michael Cc: Olsofsky, Michelle; VOSBURG, ALIA; Jones, Thomas P.
Subject:
[External_Sender] Re: Draft SAMA Audit Schedule Mike:
We will get back to you by Monday afternoon or early Tuesday after we discuss with our team.
Sent from my iPhone On Sep 11, 2015, at 9:20 AM, Wentzel, Michael
<Michael.Wentzel@nrc.gov<mailto:Michael.Wentzel@nrc.gov>> wrote:
Alert: This message originated outside of PG&E. Use caution when opening attachments, clicking links or responding to requests for information.
- Terry, I have solicited some feedback from our SAMA staff and we would like to propose making a few changes to the schedule. Based on recent experiences, the staff feel pretty confident that we should be able to complete the audit in two days, with Wednesday available for close out and last-minute items. Also, we would like to pull forward the Level 3/External events discussion to Monday, if that will work for you. Once youve had a chance to review, please feel free to give me a call to discuss if you have any questions or concerns. I will be leaving the office early today, but I will be around all next week.
- Thanks, Mike Monday, Sept 21 7:00: DCPP Team meet at License Renewal offices; breakfast; overview of audit and expectations 7:45: Walk to Broad Street 8:00-8:30: NRC Entrance Meeting at Broad Street Conference Room 9:00: Assemble NRC and DCPP teams in LR Conference Room 9:00 - 10:30: Level 3 Audit Needs Questions (6 questions total) 10:30-10:45 Break 10:45 - 11:30: External Events Audit Needs Questions (7 questions total) 11:30 - 12:00: LUNCH 12:00 - 1:00: External Events Audit Needs Questions, if needed or start Level 1 (continued) 1:00 - 1:15: Break 1:15 - 3:30: Level 1 Audit Needs Questions (12 questions total) 3:45 - 5:00: Time for NRC to review requested documentation 4:30: NRC PM and DCPP PM Daily De-brief 5:00: DCPP Team Daily De-brief Tuesday, Sept 22 8:00: DCPP Team meet at License Renewal offices; breakfast 8:00-9:00 Time for NRC to review requested documentation 9:00 - 10:00: Level 1 or Level 2 Audit Needs Questions (continued) 10:00 - 10:15: Break 10:15 - 11:30: Level 2 Audit Needs Questions (10 questions total) 11:30 - 12:00: LUNCH 12:00
- 4:30: Cost-Benefit Analysis Audit Needs Questions and Potential Lower Cost SAMAs(20 questions total) 2:00 - 2:15: Break 4:30: NRC PM and DCPP PM Daily De-brief 1
5:00: DCPP Team Daily De-brief Wednesday, Sept 23 8:00: DCPP Team meet at License Renewal offices; breakfast 8:00 - 8:30: Time for NRC to review any additional requested documentation 8:30 - 9:45 Any Follow Up Questions/Open items/Preliminary RAI discussion 9:45: Walk to Broad Street 10:00: NRC Exit Meeting at Broad Street Conference Room From: Grebel, Terence [1]
Sent: Wednesday, September 09, 2015 3:58 PM To: Wentzel, Michael <Michael.Wentzel@nrc.gov<mailto:Michael.Wentzel@nrc.gov>>
Cc: Olsofsky, Michelle <MMA0@pge.com<mailto:MMA0@pge.com>>; VOSBURG, ALIA
<AKV1@pge.com<mailto:AKV1@pge.com>>
Subject:
[External_Sender] FW: Draft SAMA Audit Schedule Mike:
Please review and get back to us with any comments. We will develop a similar schedule for the environmental audit.
From: Olsofsky, Michelle Sent: Wednesday, September 09, 2015 12:49 PM To: Grebel, Terence
Subject:
FW: Draft SAMA Audit Schedule
- Terry, Revised based on your phone call with Mike today. Do we want to send this to Mike for his awareness/concurrence?
- Thanks, Michelle
============================================
Monday, Sept 21 7:00: DCPP Team meet at License Renewal offices; breakfast; overview of audit and expectations 7:45: Walk to Broad Street 8:00-8:30: NRC Entrance Meeting at Broad Street Conference Room 9:00: Assemble NRC and DCPP teams in LR Conference Room 9:00 - 11:30: Level 1 Audit Needs Questions (12 questions total) 11:30 - 12:00: LUNCH 12:00 - 1:30: Level 1 Audit Needs Questions (continued) 1:30 - 1:45: Break 1:45 - 3:45: Level 2 Audit Needs Questions (10 questions total) 3:45 - 5:00: Time for NRC to review requested documentation 4:30: NRC PM and DCPP PM Daily De-brief 5:00: DCPP Team Daily De-brief Tuesday, Sept 22 8:00: DCPP Team meet at License Renewal offices; breakfast 8:00 - 9:45: Time for NRC to review requested documentation 9:45 - 10:00: Break 10:00 - 11:30: External Events Audit Needs Questions (7 questions total) 11:30 - 12:00: LUNCH 12:00 - 1:00: External Events Audit Needs Questions (continued) 1:00 - 1:15: Break 1:15 - 3:00: Level 3 Audit Needs Questions (6 questions total) 3:00 - 3:15: Break 3:15 - 4:30: Cost-Benefit Analysis Audit Needs Questions (16 questions total) 4:30: NRC PM and DCPP PM Daily De-brief 2
5:00: DCPP Team Daily De-brief Wednesday, Sept 23 8:00: DCPP Team meet at License Renewal offices; breakfast 8:30 - 10:30: Cost-Benefit Analysis Audit Needs Questions (continued) 10:30 - 10:45: Break 10:45 - 11:30: Potential Lower Cost SAMAs Audit Needs Questions (4 questions total) 11:30 -
12:00: LUNCH 12:00 - 12:45: Potential Lower Cost SAMAs Audit Needs Questions (continued) 12:45 - 1:00: Break 1:00 - 3:00: Follow-up Discussions; Time for NRC to review requested documentation 3:30: NRC PM and DCPP PM Daily De-brief 4:15: Walk to Broad Street 4:30: NRC Exit Meeting at Broad Street Conference Room 5:00: DCPP Team Daily De-brief 3
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 3160 Mail Envelope Properties (B462164F-44CC-464F-A269-4DA837984C47)
Subject:
[External_Sender] Re: Draft SAMA Audit Schedule Sent Date: 9/11/2015 1:34:27 PM Received Date: 9/11/2015 1:34:42 PM From: Grebel, Terence Created By: TLG1@pge.com Recipients:
"Olsofsky, Michelle" <MMA0@pge.com>
Tracking Status: None "VOSBURG, ALIA" <AKV1@pge.com>
Tracking Status: None "Jones, Thomas P." <TPJ2@pge.com>
Tracking Status: None "Wentzel, Michael" <Michael.Wentzel@nrc.gov>
Tracking Status: None Post Office: pge.com Files Size Date & Time MESSAGE 5247 9/11/2015 1:34:42 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: