ML15251A374

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - St. Lucie Nuclear Plant
ML15251A374
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/03/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Nazar M
Nextera Energy
References
Download: ML15251A374 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2015 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT

Dear Mr. Nazar:

In a telephone conversation on August 25, 2015, Mr. Daniel Bacon, Senior Operations Engineer, and Mr. Rick Virgin, Licensed Operator Continuing Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the St. Lucie Nuclear Plant. The inspection is planned for the week of November 16, 2015, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit by November 2, 2015, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Virgin has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

M. Nazar 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Bacon at (404) 997-4518, (Internet E-mail:

Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16

Enclosure:

Materials Request List cc: Distribution via Listserv

_____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 EFG NAME BACON GUTHRIE DATE 9/3/2015 9/3/2015 9/ /2015 9/ /2015 9/ /2015 9/ /2015 9/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program Inspection (IP-71111.11) in November 2015 at the St. Lucie Nuclear Plant. Items listed under In-office inspection material must be received in the NRC Region II office by the due dates specified below. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on November 16, 2015.

A. In-office inspection material:

1. List of all licensed individuals (active and inactive; RO and SRO) including license restrictions. [November 2, 2015]
2. Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information. [November 2, 2015]
3. Weekly examination schedules for the weeks that the 2015 annual operating exams will be administered, including a list of personnel scheduled for testing the week of November 16, 2015. [November 2, 2015]
4. All 2014 biennial written examinations that have been approved for administration, final answer keys, re-take examinations, and spreadsheets or outlines that show the usage of written examination questions on the different versions of these written examinations. [

November 2, 2015]

5. Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom & simulator), examination development/administration, remedial training, and examination security. [November 2, 2015]
6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-1985 requirements. [November 2, 2015]
7. All JPMs that have been approved for administration, including spreadsheets or outlines that show the usage of the JPMs in all of the 2015 annual exam weeks. [As available on November 2, 2015 or following completion of the annual operating tests]
8. All simulator scenarios, approved for administration that will be administered in the 2015 annual exam, including which scenarios are assigned to a specific week. [As available on November 2, 2015 or following completion of the annual operating tests]
9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since the last biennial requalification inspection, which document operator errors or performance problems that occurred in the actual plant/main control room, including the corrective actions. [November 2, 2015]

Enclosure

2 B. On-site inspection material [November 16, 2015]:

1. Requalification training attendance records for the current two year biennial training cycle.
2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.
3. Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators the week of November 16, 2015.
4. All remedial training documentation for any licensed operator that failed an examination since the last requalification inspection.
5. List of all operators that reactivated their licenses since the last requalification inspection.
6. Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license since the last requalification inspection, including:
a. Documentation of time on shift under instruction.
b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
7. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
8. Medical records for all licensed (active and inactive) operators.
9. Simulator maintenance and testing records, including:
a. List of all open simulator discrepancies
b. List of all simulator discrepancies closed within the past 12 months
c. List of simulator performance tests
d. Simulator performance testing records and associated documentation