2015 DAVIS-BESSE NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 June 11 , 2015 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Lieb:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeffrey D. Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, " one day during the week of June 22, 2015. The NRC staff will administer the operating tests during the week of June 15, 2015. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021, for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.

Please contact your Chief Examiner, Mr. David W. Reeser, at 630-829-9859, if you have any questions or identify any errors or changes in the license level (reactor operator (RO) or senior reactor operator (SRO)) or type of examination (partial or complete written exam ination and/or operating test) specified for each applicant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding ," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document

R. Lieb Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS) . ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERv J. D. Cuff, Training Manager

R. Lieb Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERv J. D. Cuff, Training Manager DISTRIBUTION:

Kimyata MorganButler RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Jim Clay Carmen Olteanu Scott Sloan DOCUMENT NAME: Ltr 05xx15 Davis Besse OL Exam Approval (DWR).docx

~ Publicly Available D Non-Publicly Available D Sensitive ~ Non-Sensitive To receive a co of this document, indicate in the concurrence box " C" =Co without attach/encl "E" =Co OFFICE Riii Riii NAME DReeser DATE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Lieb:

We have received your corporate letters L-12-254 dated July 6, 2012, L-13-172 dated June 3, 2013, and L-13-274 dated August 28, 2013. In these letters, you requested an initial operator licensing examination scheduled in December 2014 be delayed until June 2015. In response, we have scheduled an initial license exam for the weeks of June 15 and 22, 2015, with an onsite validation date of May 18, 2015.

In your letters, you also requested we schedule initial license exams in June 2016 and December 2017 at the Davis-Besse Nuclear Power Station . In response, as you requested , we have scheduled an initial operator licensing examination for the weeks of June 13 and 20, 2016, with an onsite validation scheduled for May 23, 2016. Additionally, we have scheduled an initial operator licensing examination for the weeks of December 4 and 11 , 2017, with an onsite validation scheduled for the week of November 13, 2017.

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case , we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program

R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room) .

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ'

R. Lieb In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ' DISTRIBUTION :

Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ur 012714 Davis Besse Confirmation of Initial OL Exam .docx

~ Publicly Available 0 Non-Publicly Available 0 Sensitive ~ Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE Riii I Riii I Riii I Riii I NAME RKWalton :bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY

FENOC ~ 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Bsny S. Allen 419-321-7616 Vice President - Nuclear Fax: 419-321-7582 July 6, 2012 L-12-254 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year* 2017 for Initial Operator License Examinations and through calendar year 2015 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Charles N.

Steenbergen, Acting Site training Manager, at (419) 321-7594.

Sincerely,

/(IA/I]~ fo.,. 8.5. Alle:Y\.

Barry S. Allerf1'

  • vaw

Enclosure:

NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resiqent Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board

Enclosure L-12-254 Form 'NRC- 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 09/30/2014 (9-2011)

Estimated burden per response to comply with this vokmtary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send commonts regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F5J}, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. or by lntern el e-mail to lnfocoll~cls.Resource@nrc.9ov, and lo the Desk Officer, Office of Information and EXAMINATION DATA Regulaloiy Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a moans used lo impose an Information collection does not display a currently valid OMS control number, the NRC may not conduci 01 sponsor, and a person Is not required to respond to, lhe informaUon collection.

FACILITY NRC REGION Davi s-Besse Nucl ear Power Station , Unit I 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 14 CY 15 CY 16 CY 17 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED l 0 I l EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE ~XAMINA TIONS PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 NUMBER OF REACTOR OPERATORS 6 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 0 5 5 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 0 ~ 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/l/14 NA 6/13/l6 12/1 / 17 AL TERNA TE DA TE 115115 NA 7118116 1/5/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY 15 PROPOSED NUMBER

- 13 ---

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (9*2011 )

FENOCtM ~ 5501 North State Route 2 RrstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Raymond A. Ueb 419-321-7676 Vice President. Nuclear Fax. 419-321-7582 June 3, 2013 L-13-172 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Rescheduling of Operator Licensing Examinations This letter is being submitted to request rescheduling of the Davis-Besse Nuclear Power Station (DBNPS) Initial Operator Licensing Examination for 2014. Letter L-11-209, Response to Regulatory Issue Summary 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated June 23, 2011, requested a primary examination date of December 1, 2014, and an alternate date of January 5, 2015. Due to preparations for our upcoming Steam Generator Replacement outage in the spring of 2014, an approximate six month extension to these dates is needed. Therefore, the FirstEnergy Nuclear Operating Company (FENOC) is requesting a primary examination date for the week of June 1, 2015, with an alternate date of July 6, 2015. These proposed changes have been discussed with Mr. R. Keith Walton, NRC Region Ill Operator Licensing .

Please note that the upcoming 2013 examinations are unaffected by this change, as are the examinations scheduled in 2016. An updated Operator Licensing Examination Data Form (NRC Form 536) is enclosed to reflect these changes, along with a revised schedule for the proposed administration of the Generic Fundamentals Examination in 2013 and 2014.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T. Hartnett, Superintendent - Nuclear Operations Training at (419) 249-2396.

Sincerely, vaw

Davis-Besse Nuclear Power Station Unit 1 L-13-172 Page 2 of 2

Enclosure:

NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board

Enclosure L-13-172 Form NRC - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)

Estimated burden per response to comply with this volunta.')' Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infonnation collection is used to plan budgets and resourtes for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Brandl OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 , or by internet e-EXAMINATION DATA mail to lnlocollects.Resource@nrc.gov, and lo the Desk 01ficer, 01fice of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budget, Washinglon, DC 20503. tt a means used to impose an information collection does nol display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is nol required lo respond to, the information collection.

FACILITY /NRCREGION Davis-Besse Nuclear Power Station Unit 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED I 0 I I EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 NUMBER OF REACTOR OPERATORS 6 0 6 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 5 0 5 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/03/2013 06101/2015 06/13/2016 ALTERNATE DATE 07/15/2013 07/16/2015 07/18/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY 14 PROPOSED NUMBER

- 13 -

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 15 CANDIDATES NRC FORM 536 (09-2011)

FENOC' 5501 North State Route 2 RrstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Raymond A. Ueb 419-321-76 76 Vice President, Nuclea( Fax: 419-321-7582 August28,2013 L-13-274 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2013-06. "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2018 for Initial Operator License Examinations and through calendar year 2016 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Daniel T.

Hartnett, Superintendent - Nuclear Operations Training at (419) 249-2396.

vaw

Enclosure:

NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board

Enclosure L-13-274 Form NRC - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/3012014 (09-2011)

Estimated burden per response lo comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branen OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrt.gov. and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington.

DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRG Kt:<.>ION NRC Region III Davis-Besse Nuclear Power Station Unit 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 15 CY 16 CY 17 CY 18 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I I 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 15 CY 16 CY 17 CY 18 NUMBER OF REACTOR OPERATORS 4 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 5 5 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE I 3 3 0 NUMBER OF SENIOR REACTOR OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 6/1/2015 6113/2016 12/1/2017 ALTERNATE DATE 7/16/2015 7/18/2016 1/8/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY CY 16 PROPOSED NUMBER

- 15 -

MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (09-2011)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 4, 2011 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR STATION

Dear Mr. Allen:

We have received your letter L-11-209 dated June 23, 2011. In that letter, you requested an initial operator licensing examinations be scheduled for December 2014 and June 2016.

In response, as you requested, we have scheduled an initial operator licensing examination for the weeks of January 5 and 12, 2015, with an on-site validation scheduled for December 15, 2014. Additionally, we have scheduled an initial operator licensing examination for the weeks of June 13 and 20, 2016, at the Davis-Besse Nuclear Power Station with an on-site validation scheduled for the week of May 23, 2016. Previously, you were scheduled for an initial operator licensing exam the weeks of June 3 and 10, 2013. This date has not changed .

In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations unless we determine it is necessary for the NRG to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates decline below ten for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRG to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

B. Allen In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ'

B. Allen In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http ://ww.nrc.gov/reading-rm/adams .html {the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson , Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via ListServ' DISTRIBUTION:

RidsNrrDorllpl3-2 Resource Amy Snyder RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRSlll\DRS\Work in Progress\Ltr 110411 Davis-Besse Exam 2011 .docx D Publicly Available D Non-Publicly Available D Sensitive D Non-Sensitive To receive a copy of this document, Indicate In the concurrence box " C" =Copy without attach/encl "E" =Copy with attach/encl " N" = No copy OFFICE Riii I Riii I I I NAME RKWalton :ls HPeterson DATE 10/31/11 11/04/11 OFFICIAL RECORD COPY

FENOC ~ 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Barry S. Allen 419-321-7676 Vice President - Nuclear Fax 419-321-7582 June 23, 2011 L 209 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2011-04. "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2016 for Initial Operator License Examinations and through calendar year 2015 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C.

Hovland, Site Training Manager, at (419) 321-8406.

Sincerely, J7sAa--

Barry S. Allen vaw

Enclosure:

NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region Ill DB-1 NRC/NRR Project Manager DB-1 NC Senior Resident Inspector Chief, Operations Branch, NRC Region Ill Utility Radiological Safety Board JUN 2 7 2011

Enclosure A L-11-209 Form NRG - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations. Send comments re1f'rding burden estimate to the Records and FOINPrivacy Services Branch \ -5 F 3), U.S.

OPERATOR LICENSING Nuclear Re~u latory Commission, Washington , DC 20555-000 . or bY, internet e-mail to in ocollects@nrc . ov, and to the Desk Officer . Office of In ormation EXAMINATION DATA 0 and Regulatory Affairs , NE B-10202, (3150-013 1), Office of Management and Budget, Washington , DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor , and a person is not required to respond to , the information collection .

FACILITY NRCREGION Davis-Besse Nuclear Power Station, Unit 1 NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED I I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 NUMBER OF REACTOR 6 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 5 5 0 5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/13/2013 12/01/2014 06/13/2016 ALTERNATE DATE 07/15/2013 01/05/2015 07/18/2016

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 13 CY 15 PROPOSED - -- - --

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 11 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER