MONTHYEARML15071A2622015-03-12012 March 2015 Flood Hazard Reevaluation Report for Watts Bar Nuclear Plant, Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Re Project stage: Response to RAI CNL-15-042, Flood Hazard Reevaluation Report for Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review.2015-03-12012 March 2015 Flood Hazard Reevaluation Report for Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review. Project stage: Response to RAI ML15106A6322015-04-17017 April 2015 Tennessee Valley Authority FHRR Audit Plan-4-22-2015 Project stage: Other ML15240A1832015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ML15240A1342015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR50.54 Information Request - Flood Causing Mechanism Reevaluation Project stage: Other ML15238B6562015-09-0303 September 2015 Public Table Project stage: Other ML15294A2032015-10-30030 October 2015 NRC Report for the Audit of Tennessee Valley Authority'S Flood Hazard Reevaluation Report Submittals Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Browns Ferry, Units 1,2 & 3, Sequoyah, Units 1 & 2, and Watts Bar, Uni Project stage: Other 2015-03-12
[Table View] |
|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML22327A1412022-11-22022 November 2022 10 CFR 50.46 Annual and 30-Day Report of Changes in Peak Cladding Temperatures (PCT) ML20322A1462020-11-25025 November 2020 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) ML20164A1442020-06-0303 June 2020 Memorandum from David Lochbaum 2.206 Petition - Review of TVA Employee Concerns Program CNL-17-141, Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status2017-12-28028 December 2017 Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15240A1342015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR50.54 Information Request - Flood Causing Mechanism Reevaluation ML15238B6562015-09-0303 September 2015 Public Table ML15254A5092015-08-11011 August 2015 Revised ITS Conversion Change Tables ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)2013-11-0404 November 2013 Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13298A0302013-09-20020 September 2013 SQN List of Potential Sources of Ghg Emissions Due to Refrigerant Leaks Submitted on Cd Attached to Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.3 ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML11339A0782011-12-13013 December 2011 G20110262/EDATS: OEDO-2011-0269 - Acknowledgment Letter Regarding 2.206 Petition of April 13, 2011 from Paul Gunter to Immediately Suspend OLs of GE BWR Mark I Units ML0919404632009-09-0404 September 2009 Enclosure 1 Summary of Conference Calls with Tennessee Valley Authority Regarding Decommission Funding Assurance ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2024-01-11
[Table view] |
Text
Sequoyah, Units 1 & 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Local Intense Precipitation 705.7 ft msl Minimal 705.7 ft msl FHRR Section 3.4.1 Streams and Rivers Diesel Generator Building 722.0 ft msl 1.2 ft 723.2 ft msl FHRR Section 3.4.2 FHRR Section 3.4.8.1 ERCW Pumping Station 722.0 ft msl 4.2 ft 726.2 ft msl FHRR Section 3.4.2 FHRR Sec.tion 3.4.8.1 Failure of Dams and Onsite Water Control/Storage Structures 708.6 ft msl Not 708.6 ft msl FHRR Section 3.4.8.2 applicable Storm Surge Not included Not included Not included FHRR Section 3.4.4 in DB in DB in DB Seiche Not included Not included Not included FHRR Section 3.4.4 in DB in DB in DB Tsunami Not included Not included Not included FHRR Section 3.4.5 in DB in DB in DB Ice-Induced Flooding Not included Not included Not included FHRR Section 3.4.6 in DB in DB in DB
Sequoyah, Units 1 & 2 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Waves/ Design Basis Reference Elevation Runup Hazard Elevation Channel Migrations/Diversions Not included Not included Not included FHRR Section 3.4.7 in DB in DB in DB Note: Reported values are rounded to the nearest one-tenth of a foot.
Sequoyah, Units 1 & 2 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Waves/ Reevaluated Reference Elevation Runup Hazard Elevation Local Intense Precipitation 706.3 ft msl Minimal 706.3 ft msl FHRR Table 11-1 Streams and Rivers
[Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA. The staff will evaluate the flood event duration parameters (including warning time and period of inundation) and flood associated effects during its review of the MSA.
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.