August 21, 2015
SUBJECT:
UNIVERSITY OF NEW MEXICO - NRC ROUTINE INSPECTION REPORT NO.
50-252/2015-201
Dear Dr. Busch:
On July 20 - 23, 2015, the U.S. Nuclear Regulatory Commission (NRC, the Commission)
conducted an inspection at the University of New Mexico (UNM) AGN-201M Research Reactor facility (Inspection Report No. 50-252/2015-201). The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations of activities in progress.
Based on the results of this inspection, no findings of safety concern or noncompliance of requirements were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390 Public inspections, exemptions, and requests for withholding a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. Should you have any questions concerning this inspection, please contact Mr. Johnny Eads at 301-415-0136 or electronic mail at Johnny.Eads@nrc.gov.
Sincerely,
/RA/
Kevin Hsueh, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Docket No.: 50-252 License No.: R-102
Enclosure:
NRC Inspection Report No. 50-252/2015-201
cc: w/encl: See next page
University of New Mexico Docket No. 50-252
cc:
City Manager City of Albuquerque City Hall Albuquerque, NM 87101
Dr. Gary Cooper, Reactor Administrator Chemical and Nuclear Engineering Department University of New Mexico 209 Farris Engineering, MSC 01-1120 Albuquerque, NM 87131-0001
Mr. Salmen Loksen, Radiation Safety Officer Safety, Health, Environmental Affairs University of New Mexico 1801 Tucker NE, Bldg. 233MSC 07-4100 Albuquerque, NM 87131-0001
Chief, Radiation Control Bureau Field Operations Division Environment Department Harold S. Runnels Bldg.
1190 St. Francis Drive, Rm S2100 Santa Fe, NM 87505-4173
Deputy Secretary, Office of the Secretary New Mexico State Environment Dept.
1190 St. Francis Drive, Suite 4050N Sante Fe, NM 87502-6110
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
ML15231A296; *concurred via e-mail
NRC-002 OFFICE NRR/DPR/PROB/RI*
NRR/DPR/PROB/BC NAME JEads KHsueh DATE 08/19/2015 08/21/2015
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION
Docket No.:
50-252
License No.:
R-102
Report No.:
50-252/2015-201
Licensee:
University of New Mexico
Facility:
AGN-201M Reactor Facility
Location:
Albuquerque, New Mexico
Dates:
July 20 - 23, 2015
Inspector:
Approved by:
Kevin Hsueh, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
EXECUTIVE SUMMARY
University of New Mexico AGN-201M Research Reactor Facility NRC Inspection Report No.: 50-252/2015-201
The primary focus of this routine, announced inspection included onsite review of selected aspects of the University of New Mexico (UNM, the licensee) Class II research reactor safety program including: 1) Organization and Staffing; 2) Operations Logs and Records; 3)
Surveillance and Limiting Conditions for Operations (LCOs); 4) Emergency Preparedness, 5)
Maintenance Logs and Records; and 6) Fuel Handling Logs and Records since the last U.S.
Nuclear Regulatory Commission (NRC) inspection. The licensee's program was acceptably directed toward the protection of public health and safety and in compliance with NRC requirements.
Organization and Staffing
- Organizational structure and staffing satisfied Technical Specifications (TS)
requirements.
Operations Logs and Records
- The facility was maintaining and retaining records in accordance with the TS.
Surveillance and Limiting Conditions for Operations (LCOs)
- Surveillances and LCOs were being performed and observed in accordance with the TS.
- The facilities emergency preparedness program was consistent with the approved Emergency Plan.
Maintenance Logs and Records
- Maintenance activities were performed in accordance with facility procedures.
Maintenance records were retained in accordance with TS required periodicity.
Fuel Handling Logs and Records
- Fuel Handling operations were performed in accordance with facility procedures, protocol, and adhered to TS reactivity specifications for storage in a secured location outside the reactor.
REPORT DETAILS
Summary of Facility Status
The University of New Mexico (UNM, the licensee) Aerojet General Nucleonics-201 Modified (AGN-201M) research reactor was licensed to operate at a maximum steady-state thermal power of 5 Watt (W). The licensee continued to operate the reactor in support of operator training, surveillances, and teaching and classroom experiments/demonstrations. During the inspection, the reactor was operated for training purposes.
1.
Organization and Staffing
a.
Inspection Scope (IP 69001)
The inspector reviewed the following to ensure that the requirements of Technical Specifications (TS) Section 6.0 (revised November 2010) were being met:
- Management responsibilities
Qualifications of facility personnel
Organization chart
Selected portions of the Reactor Operations Logs
b.
Observations and Findings
This organization was consistent with that specified in the TS. The organizational structure and the responsibilities of the reactor staff had not changed since the last inspection.
Staffing levels remained consistent with those noted during the last inspection of the facility. Through the review of selected records, during operations when the reactor was not secured, the facility met the minimum operating staff requirements specified in Technical Specification (TS) Section 6.1.12.
c.
Conclusion
Organizational structure and staffing satisfied TS requirements.
2.
Operation Logs and Records
a.
Inspection Scope (IP 69001)
The inspector reviewed administrative procedures and reviewed record retention to verify compliance with TS Section 6.10. This included:
- Reactor Operations Logs, various 2014 and 2015
- 2 -
- Surveillance and LCO Records, various 2014 and 2015
Maintenance Records, various 2014 and 2015
b.
Observations and Findings
Reactor Operations logs are maintained on an Appendix IIIB form, The University of New Mexico AGN-201M Reactor Operations Log. The logs identify the completion of the pre-critical startup checklist, startup, power changes, and shutdown of the reactor. The logs and records identify the installation or removal of fuel elements, control rods, or experiments that could affect core reactivity.
The logs and records identify rod worth measurements and other reactivity measurements.
It was noted that the reactor operators followed the appropriate procedures, were knowledgeable of the required actions, and professional in the conduct of their duties. The reactor logs were generally found to be properly completed and maintained.
c.
Conclusion
The facility was maintaining and retaining records in accordance with the TS.
3.
Surveillance and Limiting Conditions for Operation (LCOs)
a.
Inspection Scope (IP 69001)
The inspector reviewed the following to verify compliance with TS Section 3.0 and 4.0:
- AGN-201 Annual Maintenance form, dated April 28, 2015
Reactor Operations Logs, various 2014 and 2015
Monthly Reactor Inspection AGN-201 M, SN-112 Reactor forms, various for 2014 and 2015
b.
Observations and Findings
The inspector verified that LCOs for reactor core reactivity conditions, reactor control and safety systems, limitations of experiments, and radiation monitoring, control and shielding were met since the last NRC inspection. At the UNM reactor facility, LCOs are verified through monthly and annual surveillances, the results are maintained within the Monthly Maintenance Logbook. Monthly maintenance activities include such determinations as nuclear instrumentation channel checks to verify scram set points and interlocks and rod drop tests. The annual maintenance involves extensive determinations such as power calibration, core excess reactivity, shutdown margin, and rod worth calibrations.
- 3 -
c.
Conclusion
Surveillances and LCOs were being performed and observed in accordance with facility TS.
4.
a.
Inspection Scope (IP 69001)
The inspector verified compliance with the facilities Emergency Plan (E-Plan) by reviewing selected aspects of:
- E-plan for the UNM AGN-201M Reactor Facility, dated October 24, 2012
Emergency Drill Critique, dated June 22, 2015
Emergency Contact Lists
Emergency Facilities and Capabilities
b.
Observations and Findings
The inspector reviewed the E-Plan, emergency implementing procedures, and toured the facility, noting emergency response capabilities. The E-Plan did not have significant changes and did not appear to change its effectiveness.
The inspector conducted a walkdown of the facility to verify that the equipment specified in E-Plan Section 8.0 Emergency Facilities and Equipment, was available.
In addition, the inspector reviewed the latest facility drill critique dated June 22, 2015. The drill was found to satisfy the requirements of E-Plan Section 10.2, Training and Drills.
c.
Conclusion
The licensee was maintaining acceptable emergency preparedness in accordance with TS and E-Plan requirements.
5.
Maintenance Logs and Records
a.
Inspection Scope (IP 69001)
To verify that maintenance was being performed in accordance with procedures, the inspector reviewed the following:
- Maintenance Log
Selected portions of the Reactor Operations Logs
- 4 -
b.
Observations and Findings
The inspector reviewed selected portions of the control room and maintenance logbooks governing the interval of time since the previous inspection.
Maintenance during this inspection period included troubleshooting and minor repairs. Routine and preventive maintenance was controlled and documented in the appropriate logs. These documents indicated that all maintenance activities were in accordance with the requirements in licensee administrative controls.
The inspector verified that all maintenance was conducted in accordance with the requirements of TS Section 4.0, and system operational checks were performed before returning them to service.
c.
Conclusion
Maintenance activities were performed in accordance with facility procedures.
Maintenance records were retained in accordance with TS required periodicity.
6.
Fuel Handling Logs and Records
a.
Inspection Scope (IP 69001)
To verify compliance with TS 5.2, the inspector interviewed facility staff and reviewed the following:
- Reactor Operations Log, various 2014 and 2015
b.
Observations and Findings
Through discussion with reactor facility staff and record reviews it was determined that the majority of fuel handling was performed during laboratory experiments (e.g., 1/M plots for criticality determination) or annual surveillances (e.g., rod drop tests).
The inspector found that the records of fuel movements completed during the inspection period adequately documented the location of fuel elements at all times.
c.
Conclusion
Fuel Handling operations were performed in accordance with facility procedures, protocol, and adhered to TS reactivity specifications for storage in a secured location outside the reactor.
- 5 -
7.
Exit Meeting
The inspector presented the inspection results to licensee management at the conclusion of the inspection on July 23, 2015. The inspector discussed the findings for each area reviewed. The licensee acknowledged the findings and did not identify as proprietary any of the material provided to or reviewed by the inspector during the inspection.
PARTIAL LIST OF PERSONS CONTACTED
Licensee Chief Reactor Supervisor K. Carpenter Reactor Supervisor
INSPECTION PROCEDURES USED
Class II Research and Test Reactors
ITEMS OPENED, CLOSED, AND DISCUSSED
OPENED:
None
CLOSED:
None
DISCUSSED:
None
LIST OF ACRONYMS USED
10 CFR Title 10 of the Code of Federal Regulations E-Plan Emergency Plan IP
Inspection Procedure NRC
U. S. Nuclear Regulatory Commission TS
Technical Specifications UNM University of New Mexico